Proposed Development

Ground floor garage conversion to habitable accommodation with a frontfacing window; replacement of the existing garage roof with a flat roof incorporating two rooflights; single-storey flat-roof extension to the front and side; and infill of the front porch. Widening of existing front vehicular access.

Application Timeline

  1. Application received

    23 Dec 2025

  2. Decision due

    25 Feb 2026

  3. Decision: GRANT PERMISSION

    25 Feb 2026

  4. Grant issued

    2 Apr 2026

Application Details

Location
38 Beneavin Park, Finglas East, Dublin 11
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
362.67 ha

Timeline

Registration Date
23 December 2025
Status
Decision Notice Issued
Decision
GRANT PERMISSION
Decision Date
25 February 2026
Grant Date
2 April 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
WEB1965/21GRANT PERMISSION27 Sept 2021

Conversion of attic to non-habitable accommodation including changing her existing hipped end roof to a gable end roof, 2 velux rooflights to the rear, a velux rooflight to the front and a window to the new side gable wall, all at roof level.

36, Beneavin Park, Dublin 11

38m
WEB1771/22APPLICATION DECLARED INVA23 Aug 2022

Planning Permission is sought for new vehicular access, new piers & gates, new footpath dishing to proposed access, an attic conversion to non-habitable area, which incorporates the gable wall being raised, a change of roof type from hipped to gable end finish, new window to the side gable, new rooflights to front elevation and associated site works

33, Beneavin Park, Finglas, Dublin 11 D11 C7N0

38m
WEB1742/22APPLICATION DECLARED INVA11 Aug 2022

New vehicular access, new of piers & gates, new footpath dishing to proposed access, an attic conversion to non-habitable area, which incorporates the gable wall being raised, a change of roof type from hipped to gable end finish, new window to the side gable, new rooflights to front elevation and associated site works

33, Beneavin Park, Finglas, Dublin 11 D11 C7N0

38m
WEB1955/22GRANT PERMISSION17 Oct 2022

New vehicular access, new piers & gates, new footpath dishing to proposed access, an attic conversion to non-habitable area, which incorporates the gable wall being raised, a change of roof type from hipped to gable end finish, new window to the side gable, new rooflights to front elevation and associated site works

33, Beneavin Park, Finglas, Dublin 11 D11 C7P0

50m
WEB1023/23GRANT PERMISSION16 Jan 2023

The development will consist of a front porch extension, a rear roof dormer over the existing attic conversion and two roof lights to the front.

43, Beneavin Park, Dublin 11 D11 C9V3

57m
WEB2294/26GRANT PERMISSION28 May 2026

Amendments to the front boundary wall onto Glasnevin Avenue to include the construction of a new brick pier to match the existing pier and reduction of the vehicular opening onto Glasnevin Avenue.

201, Glasnevin Avenue, Glasnevin, Dublin 11

64m
3756/23GRANT PERMISSION15 May 2023

Permission is sought for new single storey extension to front, side and rear of existing house, new kitchen facility and bedroom, also porch to front of house and all associated site works.

52 Beneavin Park, Glasnevin, Dublin 11

80m
WEB1324/21GRANT RETENTION PERMISSIO30 Mar 2021

Retention & completion planning permission for widening of existing piers and completion of the creation of vehicular access for off street parking dishing of existing kerb and all associated site works

57, Beneavin Park, Glasnevin, Dublin 11

89m
WEB1003/23GRANT RETENTION PERMISSIO5 Jan 2023

The development consists of the retention of as built, pitched roof, single storey garage to the side of the existing dwelling along with single storey pitched roof extension to the rear of the garage and main dwelling.

21, Beneavin Drive, Dublin 11

89m
WEB2096/22APPLICATION DECLARED INVA6 Dec 2022

RETENTION: The development consists of the retention of as built, pitched roof, single storey garage to the side of the existing dwelling along with single storey pitched roof extension to the rear of the garage and main dwelling.

21, Beneavin Drive, Glasnevin, Dublin 11 D11 P9H2