← Back to search

BLOCK L, PHASE 1B, WITHIN LANDS KNOWN AS THE FORMER IRISH GLASS BOTTLE AND FABRIZIA SITES, POOLBEG WEST, DUBLIN 4, D04 P4F8

APPLICATION DECLARED INVALID

Planning application WEBPWSDZ1389/26

Dublin - Dublin City Council

Proposed Development

THE INSTALLATION OF 24 NO. TELECOMMUNICATIONS ANTENNAS, 3 NO. EQUIPMENT CABINETS, AND ALL ASSOCIATED EQUIPMENT, TO BE LOCATED ON THE BUILDING’S ROOFTOP. THE DEVELOPMENT WILL PROVIDE HIGH SPEED WIRELESS DATA AND VOICE SERVICES FOR ALL 3 OF IRELANDS MOBILE OPERATORS, NAMELY EIRCOM (T/A EIR), THREE IRELAND AND VODAFONE IRELAND. THIS APPLICATION RELATES TO PART OF THE LANDS WITHIN THE POOLBEG WEST STRATEGIC DEVELOPMENT ZONE (SDZ). THIS APPLICATION CONSTITUTES A WHOLLY SEPARATE AND INDEPENDENT APPLICATION FOR NEW TELECOMMUNICATIONS INFRASTRUCTURE AND IS UNRELATED TO ANY PREVIOUS APPLICATION WITHIN THE SDZ.

Application Timeline

  1. Application received

    23 Feb 2026

  2. Decision: APPLICATION DECLARED INVALID

    24 Feb 2026

  3. Decision due

    17 Apr 2026

Application Details

Location
BLOCK L, PHASE 1B, WITHIN LANDS KNOWN AS THE FORMER IRISH GLASS BOTTLE AND FABRIZIA SITES, POOLBEG WEST, DUBLIN 4, D04 P4F8
Applicant
N/A
Application Type
Permission
Planning Authority
Dublin City Council
Site Area
2281.47 ha

Timeline

Registration Date
23 February 2026
Status
Decision Notice Issued
Decision
APPLICATION DECLARED INVALID
Decision Date
24 February 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

32m
PWSDZ3207/21GRANT PERMISSION23 Jul 2021

Permission for development for a mixed use development on a site of 15.3 hectares (including some 0.2 hectares of public domain on Sean Moore Road and the junction with Pine Road), focused primarily, but not exclusively, on a net site area of 2.4 hectares (identified as within the A3 Lands) in the Poolbeg West Strategic Development Zone Planning Scheme (April 2019). The overall site is bounded to the north west by Sean Moore Road, to the north east by South Bank Road, to the south east by Dublin Port lands and Dublin Bay, and to the south west by Sean Moore Park. The overall site subsumes the 4.3 hectares site of the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270-19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020, permitting, streets, transportation, water services and utilities' infrastructure, public realm and public amenity spaces; and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the approved Poolbeg West SDZ Planning Scheme. The proposed development will consist of: amendment to Permission Register Reference PWSDZ3270/19 in those areas where the net site of 2.4 hectares overlaps with the boundaries of the earlier 4.3 hectare infrastructure permission (including amendments to the streets to be taken in charge, amendments to permitted vehicular and basement access points, materials, urban tree locations and landscaping, and changes in level for permitted streets, parks and public realm and public amenity spaces); and the construction of a residential and mixed-use scheme comprising a floor area of 61,310 sq m (53,048 sq m above basement, together with a basement undercroft area of 8262 sqm, comprising 4 No. blocks (identified as Blocks 0, M and K (with Block M comprising two separate structures: a larger block and a smaller townhouse block) to provide: 600 No, apartment units and associated residential amenity facilities; a childcare facility; café restaurant unit; and two retail units; together with associated infrastructural works on the overall site. The 600 No apartment units will consist of: 304 No, apartment units; 144 No. 'Build-To-Rent' apartments (including resident support facilities and resident services and amenities (as per the requirements of the Sustainable Urban Housing: Design Standards for New Apartments (December 2020); 90 No. affordable housing apartments; and 62 No. social housing apartments. (The social and affordable housing is provided in accordance with Objective H7 of the Planning Scheme.) The proposed development will consist of: • Blocks K, M and O ranging in height from 3 - 16 storeys over basement undercroft to provide 600 No. apartment units (with balconies terraces to be provided on all elevations at all levels for each residential block, consisting of: 32 No. studio units; 267 No. 1-bedroom units; 245 No. 2-bedroom units; and 56 No. 3 bedroom units (for the avoidance of doubt, Section 11.5.1 of the Planning Scheme clarifies the description of 'height' in Figure 11.3 to be taken from the constructed ground floor level; references to 'basement' and 'undercroft', respectively, are interchangeable given the changes in level across the site); • The provision of 804 sq m of residential amenity facilities (to include a gym, lounge, meeting room, cinema room and other private amenities.) • A childcare facility (458 sq m) located at the ground floor of Block k providing c.80 No. childcare places, and an outdoor play area of c.200 sq m; • 2 No, retail units located at the ground floor of Block K (314 sq m (82 sq m and 232 sqm); • 1 café restaurant located at the ground floor of Block K (97 sq m); • A total of 166 No. car parking spaces (with 128 No. located at basement level with vehicular access from the ground floor of Block M from the new adjacent side street, and the provision of 38 No. on-street car parking spaces); • Provision of 961 No. bicycle parking spaces (911 No. long-stay bicycle parking spaces located at basement and surface level; and 50 No. short-stay bicycle parking spaces located at surface level); • Plant rooms and resident storage spaces located at basement level; • Landscaped open spaces to comprise 4052 sq m of residential communal courtyards (incl. children's play areas), and roof terraces to Block K (4th & 7th Floor), Block M (3rd & 6th Floor) and Block O (8th & 16th Floor); and • 1 No. ESB substation located within each of the ground floors of Block O (32 sqm) and M (32 sq m), and 2 No. ESB substations located within the ground floor of Block K (64 sq m). The proposed development will also include the provision of additional streets and site services, hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree removal and tree planting, interim site hoarding, public lighting, green roofs, commercial and residential waste facilities, piped site wide services (including a temporary attenuation detention basin to serve Phase One) and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).

Bounded to the north west by Sean Moore Road, to the north east by South Bank Road, to the south east by Dublin Port lands and Dublin Bay, and to the south west by Sean Moore Park including former Irish Glass Bottle Site

32m
WEBPWSDZ2539/26Registered Application19 Jun 2026

Pembroke Beach DAC intends to apply for a 10-year planning permission for development of a residential and mixed-use scheme (referred to as ‘Quadrant A4’) on this site of 15.06 hectares, including lands known as the former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The proposed development is focused primarily on a net site area of 3.89 hectares (identified as located in the south-east quadrant of the ‘A’ lands) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The proposed Quadrant A4 scheme comprises a total residential and mixed-use Gross Floor Area (GFA) of c. 140,707 sq m (incl. ancillary spaces at basement/undercroft level) across 6 no. principal blocks (identified as Blocks R, S, T, U, V, and W) ranging in height between 6 and 18 storeys over basement/undercroft. The proposed Quadrant A4 scheme also comprises 4,967 sq m of podium space, together with c. 22,542 sq m of basement/undercroft space, for the provision of car and bicycle parking and associated circulation (GFA). The proposed development comprises the provision of the following: - 1,510 no. apartment units (with balconies/private terraces provided for all units) of the following mix: 28 no. studios; 753 no. 1-bedroom units; 636 no. 2-bedroom units; and 93 no. 3-bedroom units (totalling c. 128,648 sq m of residential use and associated circulation space); - Internal residential amenity space including the provision of tenant reception and admin support spaces, shared workspaces, resident lounge spaces, events spaces, library/media room, dining and kitchen rooms, meeting rooms, and storage spaces (totalling c. 3,660 sq m); - A creche (c. 372 sq m) located at ground floor level of Block T with an outdoor play space at podium level (c. 130 sq m); - Artists’ studio space at ground floor level of Block T (c. 167 sq m); - A Community Hub at ground floor/podium level of Block T (incl. a multi-purpose hall at basement/undercroft level) (totalling c. 2,103 sq m); - A healthcare facility at ground floor level of Block R (c. 518 sq m); - 8 no. retail/non-retail (Class 1 and Class 2 uses) units at ground floor level (2 no. units in Block R and S, respectively, and 1 no. unit in Block T, U, V, and W, respectively) (totalling c. 2,361 sq m); - 6 no. 10/20 kV Single ESB substations and 1 no. 10/20 kV Double ESB substation with associated switch rooms located at ground floor level (1 no. single substation in Blocks S, U, V, and W, respectively, 2 no. single substations in Block T, and 1 no. double substation in Block R) (totalling 231 sq m); - 12 no. (residential / commercial / retail / non-retail / community) bin stores located at basement/undercroft and ground floor level [6 no. located at basement/undercroft level (1 no. associated with each block) and 6 no. located at ground floor level (1 no. within each block)) (totalling c. 1,046 sq m)]; - Landscaped residential communal amenity spaces comprising courtyards c.3,244 sq m (incl. children’s play areas) and amenity terraces c. 5,945 sq m (overall c. 8,969 sq m); - Landscaped public realm spaces at street level including the provision of the ‘Coastal Park’, a section of the ‘Coastal Link’, the Quadrant’s local ‘side’ and ‘home zone’ streets (all as defined by the SDZ Planning Scheme), and all ancillary public amenity spaces; - 695 no. private car parking spaces [incl. 35 no. accessible spaces]; - 23 no. visitor car parking spaces [incl. 4 no. accessible spaces], 3 no. car share spaces, 1 no. creche car parking space, 1 no. healthcare car parking space and 4 no. retail car parking spaces; - 1 no. loading bays, 4 no. delivery van drop-off bays, and 4 no. bin staging areas at surface level; - Vehicle access to basement/undercroft and podium level car parking from the Quadrant’s local side streets (basement/undercroft level access at Blocks T and U and podium level access at Blocks R, S, V, and W); - 2,408 no. long-stay bicycle parking spaces at basement/undercroft and podium level (incl. 114 no. cargo bike spaces) and 126 no. short-stay bicycle parking spaces at surface level (incl. 24 no. cargo bike spaces); and - Plant rooms, resident storage spaces, attenuation tank, water storage, and sprinkler rooms located at basement/undercroft level (totalling c. 1,600 sq m); The proposed development includes hard and soft landscaping, pedestrian and cycle infrastructure, boundary treatments, tree planting, interim site hoarding, public lighting, green/blue roofs, SuDS, commercial and residential waste/recycling facilities, site-wide services, and all ancillary works and services necessary to facilitate construction and operation of the development, above and below ground. The proposed development also comprises amendments to Permission Reg. Ref. PWSDZ3270/19 (as amended) and PWSDZ3207/21 (as amended) in those areas where the net site area (identified by a non-statutory green boundary line on the site location and layout plan) overlaps with the boundaries of the earlier permitted developments. This includes amendments to the layout of the ‘Coastal Park’ and internal quadrant roads as well as interfaces between the proposed scheme and the ‘Village Green’, ‘Neighbourhood Square’, and ‘Central Boulevard’. Vehicle access and servicing of the proposed development will primarily be by way of the Central Boulevard permitted under Permission Reg. Ref. PWSDZ3207/21 (as amended), which itself amended the earlier infrastructure Permission Reg. Ref. PWSDZ3270/19 (as amended). This application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).

A4 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme, Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

32m
PWSDZ4121/21GRANT RETENTION PERMISSIO17 Dec 2021

PERMISSION and RETENTION: Permission for development to amend the Parent Permission and for retention permission for development on a site of c. 15.06 hectares on lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The site is located within the ''A Lands' sector'' of the Poolbeg West Strategic Development Zone Planning Scheme (April 2019) The overall site includes some 4.3 hectares of land for which a ten year permission for enabling and infrastructual works was granted in January 2020. (Reg. Ref. PWSDZ3270/19; the ''Parent Permission'') The element of the scheme for which retention permission for development is sought consists of the removal of two sections of tree cover cumulatively-consisting of some 100 No. trees. The first section of tree cover (some 9 No. trees) was located along South Bank Road running east to west along the northern site boundary, whilst the second section (some 91 No. trees) was located internally within the centre of the site running south to north parallel to the east and west site boundaries ( a mixture of primarily of Lawson Cypress and Lombardy Poplar). Whilst the Planning Scheme facilitates and the Parent Permission permitted the removal of some trees, these two sections of additional tree cover were removed in contravention of Condition No. 22 of Planning Permission Reg. Ref. PWSDZ3270/19. The element of the scheme for which permission for development is sought will consist of: amendments to the ''Parent Permission'' (PWSDZ3270/19) to provide temporarily: three rows of tree cover and associated landscaping consisting of some 100 No. native trees (a mixture of Crab Apple, Field Maple, Hawthorn, Rowan, Wild Cherry and Black Alder); 1,183 sq m of native understory whip mix (a mixture of Blackthorn, Crab Apple, Elderberry, Hazel, Holly, Spindle and Hawthorn); and 1,498 sq m of native wild flowers, located within the boundary of the permitted Village Green, to mitigate against the biodiversity loss associated with the removal of trees on site (the temporary measure to be in place until the resolution of Condition No. 19 of Planning Permission Reg. Ref. PWSDZ3270/19, which requires agreement between the Planning Authority and the Applicant in relation to the final landscape design of the permitted Village Green);the erection of rabbit-proof fencing around the proposed trees and 2 No. associated maintenance access gates; and for all associated works above and below ground.

Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

33m
WEBPWSDZ1434/25APPLICATION DECLARED INVA28 Feb 2025

Pembroke Beach DAC intends to apply for permission for development for a 228 No. bedroom Hotel development (referred to as Phase 2B) (including a café, licenced bar / restaurant, business centre and ancillary elements) on this site of 15.06ha including lands known as the former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 0.211ha (identified as within the ‘A1 Lands’) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019) (as amended). The overall site is bounded to the: north-west by Sean Moore Road; north-east by South Bank Road; south-east by Dublin Port lands and Dublin Bay; and south-west by Sean Moore Park. The overall site subsumes the 4.3ha site of the ‘Infrastructure Permission’ (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year Permission) on 28 January 2020, permitting streets, transportation, water services and utilities’ infrastructure; public realm and public amenity spaces (including the Village Green and Dog Park); and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the Poolbeg West SDZ Planning Scheme (2019) (as amended) as approved by An Bord Pleanála. The proposed Phase 2B Hotel Scheme development will consist of: • Construction of a 228 No. bedroom Hotel development (‘Block Q’) (10,593 sq m GFA (excluding basement)) comprising a 20 No. storey landmark tower (with set-back storey at Sixteenth Floor Level 16) over two levels of basement (2,054 sq m), to provide: Hotel and ancillary uses, café, licenced bar / restaurant and ancillary spaces, business centre; and ancillary back-of-house facilities / spaces (including ESB Substation and associated ancillary rooms, bin store, laundry store, staff changing rooms, staff canteen, staff office and sprinkler tank and associated spaces). • Provision of 8 No. car parking spaces (including 1 No. accessible car parking spaces) and 1 No. service vehicle delivery bay at Basement Level -01, provision of 24 No. secure long-stay bicycle parking spaces for staff at Basement Level -01, and provision of 16 No. new short-stay bicycle parking spaces at surface level for visitors and provision of 1 No. new cargo bicycle parking space at surface level to service the proposed Hotel. • Amendment of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and Phase A Commercial Scheme (Reg. Ref. PWSDZ379/24): • In those external landscaped areas at Ground Floor Level in the immediate curtilage of the proposed Phase 2B Hotel Scheme site (including ‘Gabbard Street’ and ‘South Bank Link Street’) (within the focused site area) to facilitate amendments to permitted layouts, including the omission of 1 No. permitted EV-charging car parking space, the relocation of 1 No. accessible car parking space and 1 No. EV-charging car parking space, the relocation of 20 No. permitted short-stay bicycle parking spaces; provision of 1 No. new loading / pick-up/drop-off bay; addition of an access point on South Bank Link Street for proposed ESB substation, materials, urban tree locations and landscaping; • At substructure level to facilitate connections for vehicular movements, pedestrian movements and services between the permitted and proposed substructures. Accessing and servicing of the proposed Phase 2B Hotel Scheme development will be by way of ‘Gabbard Street’ (previously permitted under the Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and the Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24) and also by the permitted vehicular ramp on ‘Ouzel Street’ to / from the basement of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24). This Application will be accompanied by a Natura Impact Statement (NIS).

Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

33m
WEBPWSDZ1571/25GRANT PERMISSION14 Mar 2025

Pembroke Beach DAC intends to apply for permission for development for a 228 No. bedroom Hotel development (referred to as Phase 2B) (including a café, licenced bar / restaurant, business centre and ancillary elements) on this site of 15.06ha including lands known as the former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 0.211ha (identified as within the 'A1 Lands') in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019) (as amended). The overall site is bounded to the: north-west by Sean Moore Road; north-east by South Bank Road; south-east by Dublin Port lands and Dublin Bay; and south-west by Sean Moore Park. The overall site subsumes the 4.3ha site of the 'Infrastructure Permission' (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year Permission) on 28 January 2020, permitting streets, transportation, water services and utilities' infrastructure; public realm and public amenity spaces (including the Village Green and Dog Park); and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the Poolbeg West SDZ Planning Scheme (2019) (as amended) as approved by An Bord Pleanála. The proposed Phase 2B Hotel Scheme development will consist of: • Construction of a 228 No. bedroom Hotel development ('Block Q') (10,593 sq m GFA (excluding basement)) comprising a 20 No. storey landmark tower (with set-back storey at Sixteenth Floor Level 16) over two levels of basement (2,054 sq m), to provide: Hotel and ancillary uses, café, licenced bar / restaurant and ancillary spaces, business centre; and ancillary back-of-house facilities / spaces (including ESB Substation and associated ancillary rooms, bin store, laundry store, staff changing rooms, staff canteen, staff office and sprinkler tank and associated spaces). • Provision of 8 No. car parking spaces (including 1 No. accessible car parking spaces) and 1 No. service vehicle delivery bay at Basement Level -01, provision of 24 No. secure long-stay bicycle parking spaces for staff at Basement Level -01, and provision of 16 No. new short-stay bicycle parking spaces at surface level for visitors and provision of 1 No. new cargo bicycle parking space at surface level to service the proposed Hotel. • Amendment of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24): • In those external landscaped areas at Ground Floor Level in the immediate curtilage of the proposed Phase 2B Hotel Scheme site (including 'Gabbard Street' and 'South Bank Link Street') (within the focused site area) to facilitate amendments to permitted layouts, including the omission of 1 No. permitted EV-charging car parking space, the relocation of 1 No. accessible car parking space and 1 No. EV-charging car parking space, the relocation of 20 No. permitted short-stay bicycle parking spaces; provision of 1 No. new loading / pick-up/drop-off bay; addition of an access point on South Bank Link Street for proposed ESB substation, materials, urban tree locations and landscaping; • At substructure level to facilitate connections for vehicular movements, pedestrian movements and services between the permitted and proposed substructures. Accessing and servicing of the proposed Phase 2B Hotel Scheme development will be by way of 'Gabbard Street' (previously permitted under the Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and the Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24) and also by the permitted vehicular ramp on 'Ouzel Street' to / from the basement of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24). This Application will be accompanied by a Natura Impact Statement (NIS).

Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

33m
WEBPWSDZ2252/24GRANT PERMISSION4 Oct 2024

Permission for development comprising modifications to a permitted mixed-use development (referred to as "Phase 1") located at a site of c. 15.1 ha (with a focussed area of c. 0.84 ha) and is identified as being within the "A3" and "A4" Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The wider site also includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The modifications relate to the Meanwhile Uses (MWU) ‘Cultural Hub’, permitted under Dublin City Council Planning Reference PWSDZ3207/21 (and amended through Planning Ref. PWSDZ4276/23, PWSDZ3461/24, and PWSDZ3468/24). The proposed modifications consist of the omission of the Meanwhile Uses ‘Cultural Hub’, and its ancillary development, from the ‘Phase 1’ and wider masterplan development, and the extension of temporary hoarding along the Central Boulevard, and all associated works.

The A3 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019)., The wider site includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites,, Poolbeg West, Dublin 4

34m
WEBPWSDZ2249/24GRANT PERMISSION4 Oct 2024

Modifications to a permitted mixed-use development (referred to as 'Phase1B') located at this site of c.0.76 ha. which is identified as being within the 'A3' lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The wider site also includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The modifications relate to Block L of the development permitted under Dublin City Council Planning Reference PWSDZ3406/22 (and amended through Planning Ref. PWSDZ4341/23, and PWSDZ3945/24). The proposed modifications consist of the change of use of permitted Ground Floor Level internal amenity space, bike store, circulation space, and an apartment unit (2-bed) (Unit No. L-00-004) to creche space/facility (c. 277 sq m). The proposed development will result in an overall apartment unit reduction of 1 No. apartment. The proposed development also includes: change of use at Basement Level from maintenance store. to residential amenity (spin studio); provision of outdoor crèche play space within the Ground Floor Level courtyard; provision of 'drop off' car and bike spaces along 'Furnace Walk'; relocation of all secure cargo bike parking from Ground Floor Level to Basement Level; and all other associated works.

The A3 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Sche,The wider site, also includes the lands known as the Former Irish Glass Bottle &, Poolbeg West, Dublin

34m
PWSDZ3945/24GRANT PERMISSION1 Jul 2024

Permission for development, comprising modifications to a permitted mixed-use development (referred to as Phase 1B). The subject lands are c. 0.76 ha and are identified as being within the A3 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The wider site also includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The modifications relate to the ground floor and roof level of Block L, permitted under Dublin City Council Planning Reference PWSDZ3406/22 (and amended through Planning Reference PWSDZ4341/23). The proposed development consists of installation of air source heat pump plant on the roof of Block L (max height c. 2.4 m), ancillary louvre screening, and all other associated and ancillary works. The proposed development also consists of the change of use of ground floor residential amenity space to ESB substation and associated switch room (c. 34 sq m), including the provision of access from the Central Boulevard, and all other associated and ancillary works above and below ground.

The A3 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019)., The wider site includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites,, Poolbeg West, Dublin 4

35m
PWSDZ3406/22GRANT PERMISSION2 Mar 2022

Permission for development for a mixed use development (Referred to as Phase1B) on this site of 15.06 hectares including lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily, but not exclusively, on a net site area of 0.76 hectares (identified as within the A3 Lands) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The overall site is bounded to the north-west by Sean Moore Road, to the north-east by South Bank Road, to the south-east by Dublin Port lands and Dublin Bay, and to the south-west by Sean Moore Park. The overall site subsumes the 4.3 hectares site of the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020, permitting: streets, transportation, water services and utilities’ infrastructure; public realm and public amenity spaces; and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the approved Poolbeg West SDZ Planning Scheme. The overall site is also the subject of an application for planning permission (Phase 1 RFI Scheme) (PWSDZ3207/21) which relates to the development on a site area of some 4.46 hectares and proposes 570 No. apartments within a mixed-use development (53,032 sq m), as well as the Multi-Modal Transport Hub (232 sq m) and the Meanwhile Use ‘Cultural Hub’ (1,364 sq m). The Phase 1 RFI Scheme is located directly adjacent to the proposed Phase 1B development within the overall site. Access and servicing of the proposed Phase 1B development will be by way of the central boulevard and adjoining side street as included in the Phase 1 RFI Scheme application for planning permission (PWSDZ3207/21) which also seeks to amend the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) amongst other things. The proposed Phase 1B development will consist of: amendment to Permission Register Reference PWSDZ3270/19 in those areas where the net site of 0.76 hectares overlaps with the boundaries of the earlier 4.3 hectare infrastructure permission (including amendments to the permitted vehicular and basement access point, materials, urban tree locations and landscaping, and changes in level for the permitted streets, village green and public realm and public amenity spaces); and the construction of a residential and mixed-use scheme comprising a floor area of 43,944 sq m (37,020 sq m above basement, together with a basement/undercroft area of 6,924 sq m, comprising 1 No. block (identified as Block L) to provide: 356 No. apartment units and associated residential amenity facilities; ground floor retail unit; together with associated infrastructural works on the overall site. The 356 No. apartment units will consist of: 264 No. apartment units; 55 No. affordable housing apartments; and 37 No. social housing apartments. (The social and affordable housing is provided in accordance with Objective H7 of the Planning Scheme.) The proposed Phase 1B development will consist of: • The building will range in height from 5 – 18 storeys over basement/undercroft to provide 356 No. apartment units (with balconies/terraces to be provided on all elevations at all levels for each residential block, consisting of: 89 No. 1-bedroom units (2no. studio 1-bedroom 1 person and 87 no. 1-bedroom 2 persons); 213 No. 2-bedroom units; and 54 No. 3-bedroom units (for the avoidance of doubt, Section 11.5.1 of the Planning Scheme clarifies the description of ‘height’ in Figure 11.3 to be taken from the constructed ground floor level; references to ‘basement’ and ‘undercroft’, respectively, are interchangeable given the changes in level across the site); • The provision of 844 sq m of residential amenity facilities (to include a lounge, meeting area, and other private amenities); • Retail space located at the ground floor (310 sq m); • A total of 69 No. car parking spaces (incl. 6 No. car share spaces) located at basement level with vehicular access from the street level along the north-western elevation and the new adjacent side street, and the provision of 11 No. on-street car parking spaces (incl. 2 No. EV on-street car parking spaces)) (Note the 11 No. on-street car parking spaces is inclusive of 2 No. on-street car parking spaces proposed as part of the Phase 1 Residential application for planning permission (PWSDZ3207/21)); • Provision of 610 No. bicycle parking spaces (550 No. long-stay standard bicycle parking spaces located at basement level); 38 No. short-stay standard bicycle parking spaces located at surface level; 17 No. cargo bicycle parking spaces located at basement level; and 5 No. cargo bicycle parking spaces located at surface level); • plant rooms and resident storage spaces located at basement level; • Landscaped open spaces to comprise c.2441 sq m of residential communal courtyards (incl. children’s play areas), and roof terraces (6th, 8th, 10th & 17th Floors); and • 1 No. ESB double substation and associated LV switch rooms located at ground floor along the south elevation. The proposed development will also include hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree planting, interim site hoarding, public lighting, green roofs, commercial and residential waste facilities, piped site wide services and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).

Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

35m
PWSDZ4380/22REFUSE PERMISSION1 Jul 2022

Development of an office and mixed-use scheme (Referred to as Phase A Commercial) on an infill site of c.15.08 hectares (with a net focused site area of c. 1.78 ha) of land within the former Irish Glass Bottle (IGB) and Fabrizia sites on Sean Moore Road, Dublin 4 (including some 198 sq metres of public domain on Southbank Road to accommodate vehicle and pedestrian access). The site is identified as within the A1 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The overall site is bounded to the north-west by Sean Moore Road, to the north-cast by South Bank Road, to the south-east by Dublin Port lands and Dublin Bay, and to the south-west by Sean Moore Park. The overall site subsumes the 4.3 hectares site of the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020, permitting: streets, transportation, water services and utilities' infrastructure; public realm and public amenity spaces; and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the Poolbeg West SDZ Planning Scheme. The overall site also includes a recently issued planning permission approved (Phase 1) (PWSDZ3207/21) which relates to the development on a site area of some 4.46 hectares and proposes 570 No. apartments within a mixed-use development (53,032 sq m), as well as the Multi-Modal Transport Hub (232 sq m) and the Meanwhile Use 'Cultural Hub' (1,364 sq m). The overall site is also the subject of an application for planning permission (Phase 1B) (PWSDZ3406/22) which relates to the development on a site area of some 0.76 hectares and proposes 356 No. apartments and residential amenities, within a mixed-use development (43,944 sq m) comprising 1 No. block (identified as Block L). The overall site is also the subject of an application for planning permission (Phase 2) (PWSDZ4058/22) which relates to the development on a site area of some 2.10 hectares and proposes a residential and mixed-use scheme comprising a floor area of 64,906 sq m (54,682 sq m above basement). The development comprises 2 No. blocks (identified as Block D and E) to provide: 516 No. apartment units and associated residential amenity facilities; a childcare facility: 5 no. café restaurant units; 2 no. Retail Services; 14 no. Retail Units; 1 no. Foodhall, 1 no. Health Facility: basement car parking; together with associated infrastructural works on the overall site. The Phase 2 application for planning permission is located directly adjacent to the proposed Phase A development The proposed development will consist of an office and mixed-use scheme with a total GFA of 45,993sq.m (excl. basement / undercroft UC-02) comprising 2 No. blocks (identified as Blocks A and B). The proposed development includes the removal of tree cover located along the South Bank Road interface. An amendment to the parent permission (PWSDZ3270/19) is also sought and relates to a reduction in the no. of trees proposed (by 1 no. tree) along the Sean Moore Road interface and within the focused site area. The proposed development will consist of: Block A (includes Block AA & AB) of 26,545sq.m and ranging in height from 5-7 storeys over basement/undercroft car parking to include double height (UC-01 & 00 Level) ground floor reception, office, a restaurant/bar, bakery/ café and event space with the upper floors to be used as offices. The offices have been designed to be suitable for a single user or multiple users with subdivisions. Block B of 19,448sq.m, and ranging in height from 5-12 storeys over basement/undercroft car parking to include double height (UC-01 & 00 Level) ground floor reception, games bar and office with the upper floors to be used as offices. The offices have been designed to be suitable for a single user or multiple users with subdivisions. The UC-01 level of Block A includes café, sports and recreation area, collaborative office, storage and building services. The UC-01 level of Block B includes collaborative office, management facilities and building services. Each office block has a number of amenity terraces including at 1st, 3rd, 4th, 5th, 6th and roof level in Block A and at 4th and 6th floor level in Block B. A total of 77 no. commercial car parking spaces (incl. 4 no. disabled access spaces & 16 no. EV spaces) and 2 no. motorbike spaces, located at basement level with vehicular access from the street level (Block A north eastern elevation), the provision of 29 no. on-street car parking spaces (incl. 8 No. EV spaces and 6no, disabled access spaces) and 5 no. loading bays; Provision of 613 No. bicycle parking spaces located at basement level with bicycle ramp access from street level and 130 no. short-stay standard bicycle parking spaces (incl. 4 no. cargo bicycle spaces) located at surface level; Plant rooms, building services and energy centres, water tank, sprinkler rooms, tenant rooms, kitchenette, parcel/courier store, archive store, bin stores, bicycle stores. lockers, showers, changing facilities, facilities management and games bar storage located at basement/UC-01 level; Provision of public realm spaces including 1 no. public square (Pembroke Square), Glass Bottle Lane and public amenity spaces (totalling 1,931sq m); and two new local/side streets (Pembroke Place & Glass Bottle Place) connecting to Southbank Road. The provision of the South Bank Link Road as identified in the SDZ Planning Scheme. The proposed development will include hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree planting, public lighting, green roofs, solar pv panels, and all ancillary works and services necessary to facilitate construction and operation. The scheme also provides for an option which includes for temporary site hoarding should the proposed development proceed ahead of the adjoining Phase 2 Residential Proposal commencing.

Former Irish Glass Bottle (IGB) & Fabrizia Sites, Poolbeg West, Sean Moore Road , South Bank Road , Dublin 4

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?