← Back to search

1, The Crescent, Woodpark, Ballinteer, Dublin 16

GRANT PERMISSION

Planning application D05A/1597

Dublin - Dun Laoghaire Rathdown County Council

Proposed Development

Demolition of existing two storey granny flat

Application Timeline

  1. Application received

    12 Dec 2005

  2. Decision due

    4 Feb 2006

  3. Decision: GRANT PERMISSION

    13 Feb 2006

  4. Grant issued

    23 Mar 2006

Application Details

Location
1, The Crescent, Woodpark, Ballinteer, Dublin 16
Applicant
N/A
Application Type
Permission
Planning Authority
Dun Laoghaire Rathdown County Council
Site Area
435 ha

Timeline

Registration Date
12 December 2005
Status
Decision made
Decision
GRANT PERMISSION
Decision Date
13 February 2006
Grant Date
23 March 2006

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
D21B/0148GRANT PERMISSION26 Mar 2021

Permission for the demolition of the chimney

3, The Crescent, Woodpark, Ballinteer, Dublin 14

12m
D26B/0072/WEBGRANT PERMISSION6 Feb 2026

Construction of a two-storey front extension with a front-facing gable, together

3, The Crescent, Woodpark, Dublin 16, D16K095

20m
D23B/0132GRANT PERMISSION27 Mar 2023

Flat roof dormer to the rear, two velux windows to the front, a window at the

14, The Walk, Woodpark, Ballinteer, Dublin 16, D16HY10

20m
D22B/0261GRANT PERMISSION27 May 2022

Permission for the development, which consists of

14 The Walk, Woodpark, Ballinteer, Dublin 16, D16HY10

44m
D20A/0305GRANT PERMISSION28 Apr 2020

Permission for house alterations. The work is to consist of: 1.

11 The Crescent, Woodpark, Ballinteer, Dublin 16

46m
D17A/0162GRANT PERMISSION24 Feb 2017

Permission is sought for the construction of part three/part single storey (deta

20, The Walk, Woodpark, Ballinteer, Dublin 16

49m
D09B/0264GRANT PERMISSION22 Jun 2009

First floor rear extension with pitched roof over remaining single storey rear e

3, The Walk, Woodpark, Ballinteer, Dublin 16.

58m
D05B/0393GRANT PERMISSION27 May 2005

Construction of a new two-storey extension at side of existing house,

25, The Walk, Woodpark, Ballinteer, Dublin 16

59m
D24B/0039GRANT PERMISSION6 Feb 2024

Conversion and extension to existing garage to the side. Reconstruction of

23, The Crescent, Woodpark, Dublin 16, D16XV96

68m
D26A/0583/WEBAssessment Period31 Jul 2026

a) the modification to existing rear single storey extension of the existing tw

31, The Rise, Woodpark, Dublin 16, D16PP68

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?