1 Saint Columbanus Road, Windy Arbour, Dublin 14
GRANT EXTENSION OF DURATION OF PERM.Planning application D14A/0700/E
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Permission for the construction of a two storey house with a pitched roof
Application Timeline
Application received
18 Feb 2019
Decision: GRANT EXTENSION OF DURATION OF PERM.
5 Apr 2019
Decision due
12 Apr 2019
Application Details
- Location
- 1 Saint Columbanus Road, Windy Arbour, Dublin 14
- Applicant
- N/A
- Application Type
- Extension Of Duration Of Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
Timeline
- Registration Date
- 18 February 2019
- Status
- Decision made
- Decision
- GRANT EXTENSION OF DURATION OF PERM.
- Decision Date
- 5 April 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the construction of a two storey house with a pitched roof
1 Saint Columbanus Road, Windy Arbour, Dublin 14
Two storey extension
1, Saint Columbanus Road, Windy Arbour, Dublin 14.
demolition of an existing chimney, the construction of a two storey extension to
1, Saint Columbanus Road, Windy Arbour, Dublin 14
Permission for the construction of a two storey house with a pitched roof
1 Saint Columbanus Road, Windy Arbour, Dublin 14
Permission to widen existing
11, Pairc an Ghoirt Aird, Dun Droma, D14YW32
Planning permission is sought for alterations to the side and rear of existing d
9, Highfield Park, Dundrum, Dublin 14
Demolition of existing shed & boundary walls and the construction of a new 2 sto
11, Saint Columbanus' Road, Dundrum, Dublin 14, D14X090
for the removal of the overhanging eaves and construction of a new parapet
5, Highfield Park, Dundrum, Dublin 14
New dormer window to rear of existing roof,
5, Highfield Park, Dundrum, Dublin 14
Permission to demolish an existing garage at side and single storey extension
17 Highfield Park, Dundrum, Dublin 14