77 Coolevin, Ballybrack, Co Dublin
GRANT PERMISSIONPlanning application D15B/0088
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Permission for a 6 sqm extension to the lounge and a 2.2 sqm new porch
Application Timeline
Application received
25 Mar 2015
Decision due
18 May 2015
Decision: GRANT PERMISSION
19 May 2015
Grant issued
24 Jun 2015
Application Details
- Location
- 77 Coolevin, Ballybrack, Co Dublin
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 200 ha
Timeline
- Registration Date
- 25 March 2015
- Status
- Decision made
- Decision
- GRANT PERMISSION
- Decision Date
- 19 May 2015
- Grant Date
- 24 June 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission is sought for the constrcution of a new single storey
No. 78A Coolevin, Glenageary, Ballybrack, Co. Dublin
For the demolition of existing garage to faciliate the construction
78, Coolevin, Ballybrack, Co. Dublin
Permission for (a) new 10sqm two storey pitched roof extension to north-east
137 Coolevin, Ballybrack, Co. Dublin
Planning permission is sought for the relocation of the main entrance
81, Coolevin, Ballybrack, Co. Dublin
Permission sought for two storey dwelling house including new vehicular
80, Coolevin, Ballybrack, Co. Dublin
The development consists of construction of one detached 2 stories
80, Coolevin, Ballybrack, Dun Laoghaire,Co. Dublin
Family room and utility extension to the side
71, Coolevin, Ballybrack, Co. Dublin
i) single storey extension to side or ii) as an alternative optional development
86, Coolevin, Ballybrack, Co Dublin
Permission for the following: Full planning
70, Coolevin, Glenageary, Ballybrack, Co Dublin, A96R5F3
Extension to existing dwelling house
138, Coolevin, Ballybrack, Co. Dublin
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?