180A, Mulvey Park, Dundrum, Dublin 14
GRANT PERMISSION FOR RETENTIONPlanning application D16B/0159
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Retention Permission is sought for following: 1. Ground floor single storey kitc
Application Timeline
Application received
19 Apr 2016
Further information requested
2 Jun 2016
Further information received
8 Feb 2017
Decision: GRANT PERMISSION FOR RETENTION
2 Mar 2017
Decision due
7 Mar 2017
Grant issued
6 Apr 2017
Application Details
- Location
- 180A, Mulvey Park, Dundrum, Dublin 14
- Applicant
- N/A
- Application Type
- Permission for Retention
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 179 ha
Timeline
- Registration Date
- 19 April 2016
- Status
- Decision Issued
- Decision
- GRANT PERMISSION FOR RETENTION
- Decision Date
- 2 March 2017
- Grant Date
- 6 April 2017
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A proposed semi-detached two storey single family dwelling house (circa 113 sq.m
180, Mulvey Park, Dundrum, Dublin 14
Two storey detached dwelling house with vehicular entrance
180A, Mulvey Park, Dundrum Road, Dublin 14
Demolition of existing workshop to rear
7, Arbourfield Terrace, Dundrum Road, Dublin 14.
Permission is sought to upgrade the existing static 6m x 3m advertising display
7, Arbourfield Terrace,Windy Arbour, Dundrum Road, Dublin 14.
Change of use from commercial (74sq.m) to a childcare facilitiy (74sq.m). The a
6, Arbourfield Terrace, Windy Arbour, Dundrum, Dublin 14
Retention permission for existing adveristment sign 2.25sq m at first floor
7, Arbourfield Terrace, Dundrum Road, Dublin 14.
Permission for Change of Use of ground floor (77.5 sqm) from existing vacant
6 Arbourfield Terrace, Windy Arbour, Dundrum, Dublin 14
Permission for Retention of a single storey pitched roof storage extenstion to
6 Arbourfield Terrace, Windy Arbour, Dundrum, Dublin 14
73 mobility hub sites across the Council's administrative area
National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area, Dún Laoghaire-Rathdown
Demolish and erect a two storey unit
6 Arbourfield Terrace, Windy Arbour, Dundrum, Dublin 14.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?