8, Brighton Vale, Seapoint, Blackrock, Co dublin (A Protected Structure)
GRANT PERMISSIONPlanning application D18A/0326
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Permission is sought for demolition of timber sun room
Application Timeline
Application received
11 Apr 2018
Decision: GRANT PERMISSION
1 Jun 2018
Decision due
5 Jun 2018
Grant issued
4 Jul 2018
Application Details
- Location
- 8, Brighton Vale, Seapoint, Blackrock, Co dublin (A Protected Structure)
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
Timeline
- Registration Date
- 11 April 2018
- Status
- Decision made
- Decision
- GRANT PERMISSION
- Decision Date
- 1 June 2018
- Grant Date
- 4 July 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission is sought for a vehicular entrance gate
9 Brighton Vale, Blackrock, Co. Dublin
Retention permission is sought for alterations to the centre
9 Brighton Vale, Monkstown, Co. Dublin, A Protected Structure
Provision of vehicular access, alterations to front garden
No. 7 Brighton Vale, Monkstown, Co. Dublin
Retention permission is sought for demolition of boundary wall to access
10, Brighton Vale, Monkstown, Co. Dublin
Removal of gate post and part of front garden wall, widening
11 Brighton Vale, Monkstown, Co.Dublin.
internal insulation of upper ground floor level
4, Brighton Vale, Blackrock, Co. Dublin
Two storey extension to the rear of the existing two storey house
4, Brighton Vale, Monkstown, Co. Dublin
Demolition of the existing shed to the East and construction of 3 storey 3 bedro
48, Seapoint Avenue, Blackrock, Co. Dublin
New dwelling
48A, Seapoint Avenue, Blackrock, Co. Dublin.
The development will consist of: (i) external alterations to the front elevatio
21, Trafalgar Terrace, Monkstown, Co Dublin.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?