1 Sorrento Drive, Dalkey, Co. Dublin
GRANT PERMISSIONPlanning application D19A/0677
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Permission for development. The development will consist of the:
Application Timeline
Application received
11 Sept 2019
Decision due
5 Nov 2019
Decision: GRANT PERMISSION
5 Nov 2019
Grant issued
11 Dec 2019
Application Details
- Location
- 1 Sorrento Drive, Dalkey, Co. Dublin
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 290 ha
Timeline
- Registration Date
- 11 September 2019
- Status
- Decision made
- Decision
- GRANT PERMISSION
- Decision Date
- 5 November 2019
- Grant Date
- 11 December 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of: 1) Sub-division of existing two storey house in
Anno Santo, Sorrento Road, Dalkey, Dublin, A96E7D7
The development will consist of: 1. Sub-division of existing two storey house in
Anno Santo, Sorrento Road, Dalkey, Dublin, A96E7D7
Permission is sought for the demolition of the single storey
3 Sorrento Drive, Dalkey, Co. Dublin, A96 XE63
Permission to carry out substantial alterations, demolitions and additions to
Fides, 95 Sorrento Road, Dalkey, Co Dublin
Permission is sought for (1) Demolish the interior
95 SORRENTO ROAD, DALKEY, CO. DUBLIN
Full permission for development. The proposed development
4 Edward Terrace, Sorrento Road, Dalkey, Co. Dublin A96 PC92
Permission for development. The proposed development
4 Edward Terrace, Sorrento Road, Dalkey, Co. Dublin
Permission for development. The proposed development
4, Edward Terrace, Sorrento Road, Dalkey, Co Dublin
(i) Demolition of existing single storey flat roof extension to rear and removal
106, Sorrento Road, Dalkey, Dublin, A96H6Y3
Permission is sought for the erection of a new
10 Sorrento Road, Dalkey, Co. Dublin, A96 V9F2
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?