32, Richmond Grove, Monkstown, Co Dublin
REFUSE PERMISSIONPlanning application D22A/0374
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Permission is sought for new railings on top of existing front and side boundary
Application Timeline
Application received
30 May 2022
Decision: REFUSE PERMISSION
21 Jul 2022
Decision due
22 Jul 2022
Application Details
- Location
- 32, Richmond Grove, Monkstown, Co Dublin
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 447 ha
Timeline
- Registration Date
- 30 May 2022
- Status
- Decision made
- Decision
- REFUSE PERMISSION
- Decision Date
- 21 July 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
A timber fence on top of existing side wall and part of existing front wall encl
32, Richmond Grove, Monkstown, Blackrock, Dublin, A94CT98
Permission is sought for the
42b, Ashton Park, Monkstown, Co Dublin
Permission is sought for a first floor
39, Richmond Ave, Monkstown, Blackrock, Co Dublin, A94W208
For the construction of a porch to the front elevation
33, Richmond Grove, Monkstown, Co. Dublin
Permission is sought for the retention of the conversion of an adjoining
33, Richmond Grove, Monkstown, Co. Dublin
Bedroom extension over the existing garage; new porch extension to the front and
24, Richmond Grove, Monkstown, Co. Dublin
1) 1830mm high timber fence to front of property, 2) 7.2sqm timber shed to front
33 Richmond Avenue, Monkstown, Blackrock, Co. Dublin, A94 DV26
Permission is being sought for ground floor extension together with new
41, Ashton Park, Monkstown, Co. Dublin
Permission is being sought for a first floor extension incorporating two bedroom
41, Ashton Park, Monkstown, Co. Dublin
Permission & retention permission as follows
40 Ashton Park, Monkstown, Co. Dublin
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?