99 St. Fintan's Park, Deansgrange, Co. Dublin, A94WV05
Assessment PeriodPlanning application D26A/0573/WEB
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
1.0 Subdivision of the site at 99 St. Fintan’s Park to create 2 separate sites
Application Timeline
Application received
29 Jul 2026
Decision due (upcoming)
22 Sept 2026
Application Details
- Location
- 99 St. Fintan's Park, Deansgrange, Co. Dublin, A94WV05
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 240 ha
Timeline
- Registration Date
- 29 July 2026
- Status
- Assessment Period
- Decision
- Pending
- Decision Due
- 22 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of the following: 1. Subdivision of the site at 99
99, Saint Fintan's Park, Deansgrange, Co. Dublin, A94WV05
1.0 - Subdivision of the site at 99 St. Fintan’s Park to create 2 separate site
99, St. Fintan's Park, Deansgrange, Co. Dublin, A94WV05
1 Dwelling.
99, Saint Fintan's Park, Deansgrange, Co.Dublin, A94WV05
Permission is sought for first floor extension to side of existing dwelling and
100, Saint Fintan's Park, Deansgrange, Blackrock, A94 KN62, Co. Dublin
demolition of existng shed (14 sq.m)
100, Saint Fintans Park, Deansgrange, Co. Dublin
Permission for demolition of single storey annex at the rear of the existing
40 Abbey Road, Monkstown, Co Dublin
Retention Permission for development. The development consists of retention
site on the side gable of No. 39, Abbey Road, and comprising part of the Grangeabbey residential development, Abbey Road, Monkstown, Co. Dublin
Conversion of existing attic space with 2 roof windows to rear elevation and for
9, Abbey Court, Monkstown, Co. Dublin
Demolition of existing factory and the construction of 40 residential units and
Site to the rear of No.s 37-40, & No.s 25-35, Abbey Road, Monkstown, Co Dublin
Permission for: 1. The demolition of the existing factory and re-location of
0.64 hectares site located to the rear of nos. 25-35 and between and to rear of 37-40 Abbey Road, Monkstown, Co Dublin
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?