12, Rockville Drive, Blackrock, Co. Dublin, A94CP20
Assessment PeriodPlanning application D26B/0430/WEB
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
• Demolition of the roof of the existing extension to the side;• Construction of
Application Timeline
Application received
28 Jul 2026
Decision due (upcoming)
21 Sept 2026
Application Details
- Location
- 12, Rockville Drive, Blackrock, Co. Dublin, A94CP20
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 350 ha
Timeline
- Registration Date
- 28 July 2026
- Status
- Assessment Period
- Decision
- Pending
- Decision Due
- 21 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission os sought for 1) demolition of existing single story ensuite, store a
10, Rockville Drive, Blackrock, Co. Dublin
Planning permission sought for the retention of a garden ahed, 12 sq.m
8, Rockville Drive, Blackrock, Co. Dublin
Conversion of garage to habitable room, demolition of existing flat roof
8 Rockville Drive, Blackrock, Co. Dublin
Proposed dormer window to the rear of existing house.
4, Rockville Drive, Blackrock, Dublin, A94H983
Permission for: 1. Demolition of single storey garage and shed to the side of
4 Rockville Drive, Stradbrook, Blackrock, Co Dublin
A rear ground floor pitched roof extension including alterations to the existing
54, Newtownpark Avenue, Blackrock, Co Dublin
Permission for development at this site. The development will
60 Newtownpark Avenue, Blackrock, Co. Dublin
Demolition of sheds and and conservatory to rear
62, Newtownpark Avenue, Blackrock, Co. Dublin
Demolition of sheds and conservatory to rear and replacement with single storey
62, Newtownpark Avenue, Blackrock, Co. Dublin
Change of use from residential use that of a medical surgery
62, Newtownpark Avenue, Blackrock, Co. Dublin
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?