190, Ashlawn Park, Ballybrack, Dublin, A96H9F3
Assessment PeriodPlanning application D26B/0431/WEB
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Retention Permission for: The construction of a single-storey garage/storage to
Application Timeline
Application received
28 Jul 2026
Decision due (upcoming)
21 Sept 2026
Application Details
- Location
- 190, Ashlawn Park, Ballybrack, Dublin, A96H9F3
- Applicant
- N/A
- Application Type
- Permission for Retention
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 170 ha
Timeline
- Registration Date
- 28 July 2026
- Status
- Assessment Period
- Decision
- Pending
- Decision Due
- 21 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Block built construction with flat roof circa 20+ years, WC tied into existing s
190 Ashlawn Park, Ballybrack, Glenageary, Dublin, A96 H9F3
2 bedroom, 2 storey detached dwelling with one off-street car space with further
191, Ashlawn Park, Ballybrack, Co. Dublin
2 bedroomed 2 storey detached dwelling
191, Ashlawn Park, Ballybrack, Co. Dublin
Permissio for development. The development will consist of:
175 Ashlawn Park, Glenageary, Ballybrack, Co. Dublin
Permission for the construction of a dormer roof window to rear of the existing
174A Ashlawn Park, Ballybrack, Co Dublin
Permission for the construction of a dormer roof window to rear of the existing
174A Ashlawn Park, Ballybrack, Co Dublin
Full planning permission is sought for proposed first floor extension over exist
196 Ashlawn Park, Ballybrack, Killiney, Co. Dublin
2 bedroom, 2 storey detached dwelling with one off-street car space with further
37A, Ashlawn Park, Ballybrack, Glenageary, Dublin
2 bedroomed 2 storey detached dwelling
37, Ashlawn Park, Ballybrack, Co. Dublin.
A double storey extension to the side consisting of a non habitable garage at g
172, Ashlawn Park, Ballybrack, Co. Dublin
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?