10, The Coppins, Brighton Road, Dublin, D18T3C1
Assessment PeriodPlanning application D26B/0432/WEB
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
alterations to the existing house to include a single storey flat roof extensio
Application Timeline
Application received
28 Jul 2026
Decision due (upcoming)
21 Sept 2026
Application Details
- Location
- 10, The Coppins, Brighton Road, Dublin, D18T3C1
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 940 ha
Timeline
- Registration Date
- 28 July 2026
- Status
- Assessment Period
- Decision
- Pending
- Decision Due
- 21 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
First floor extension with mansard type roof to existing dwelling
9, The Coppins, Foxrock, Dublin 18
First floor extension with mansard type roof to existing dwelling
9, The Coppins, Foxrock, Dublin 18
Retention of various development works (excluding Exempted Development works) to
White Oaks, Hainault Road, Foxrock, Dublin 18, D18K0N8
Proposed detached dormer dwelling & ancillary site development works
The Furrow, 5 Hainault Road, Foxrock, Dublin 18, D18A9C7
Demolition of existing single storey extensions front and side and the construc
"Hy Brasil", Hainault Road, Foxrock, Dublin 18, D18F3A3
Permission is for development consisting of: the demolition of existing
Hy-Brasil, Hainault Road, Foxrock, Dublin 18, D18F3A3
Permission is sought for the construction of a first floor extension
20, The Coppins, Foxrock, Co. Dublin
2 Units
6, The Coppins, Brighton Road, Foxrock, Dublin 18, D18A3X9
Permission for the demolition of a single-story side extension; the construction
White House, Hainault Road, Foxrock, Dublin, D18 H2V9
Permission for the demolition of the single storey conservatory to the rear
Oakton, The Coppins, Brighton Road, Foxrock, Dublin 18
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?