34, Kilteragh Road, Dublin 18, D18X8C2
Assessment PeriodPlanning application D26B/0458/WEB
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
The development seeking retention permission consists of the construction of a
Application Timeline
Application received
17 Aug 2026
Decision due (upcoming)
9 Oct 2026
Application Details
- Location
- 34, Kilteragh Road, Dublin 18, D18X8C2
- Applicant
- N/A
- Application Type
- Permission for Retention
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 1070 ha
Timeline
- Registration Date
- 17 August 2026
- Status
- Assessment Period
- Decision
- Pending
- Decision Due
- 9 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development at this site. The development consists of, demolitio
Lyndon, 36, Kilteragh Road, Foxrock, Dublin 18
For the demolition of existing flat roof front porch and construction of new
30, Kilteragh Road, Foxrock, Dublin 18
Permission for retention of an existing single storey utility extension to the
28, Kilteragh Road, Foxrock, Co Dublin
Permission to part demolish single storey extension & front window
42 Kilteragh Road, Foxrock, Dublin 18.
replacement of the existing flat roof to garage with a new tiled pitched roof to
15, Hainault Drive, Foxrock, Dublin 18
For domestic single storey and two storey (including attic)
44, Kilteragh Road, Foxrock, Dublin 18
Permission is sought for an attic room with dormer and dormer window to rear slo
44, Kilteragh Road, Foxrock, Dublin 18
Permission is sought for a two storey and single storey extension to rear of exi
44, Kilteragh Road, Foxrock, Dublin 18
Permission for the removal of existing boiler house to rear, formation of single
44 Kilteragh Road, Foxrock, Dublin D18 W6F6
Planning Permission is sought for the removal of the existing boiler house to re
44, Kilteragh Road, Foxrock, Dublin 18, D18W6F6
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?