11 Seafort Parade, Blackrock, Dublin, A94 X8X0 (A Protected Structure)
Assessment PeriodPlanning application REF11426
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
No works are proposed as part of this application. This application seeks to con
Application Timeline
Application received
4 Aug 2026
Decision due
31 Aug 2026
Application Details
- Location
- 11 Seafort Parade, Blackrock, Dublin, A94 X8X0 (A Protected Structure)
- Applicant
- N/A
- Application Type
- Section 5
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 69 ha
Timeline
- Registration Date
- 4 August 2026
- Status
- Assessment Period
- Decision
- Pending
- Decision Due
- 31 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
For change of use from medical consulting rooms to residential
43 Rock Road, Blackrock, Co. Dublin
Permission is sought to change the existing 4 no. bedsits at ground and first fl
8, Seafort Parade, Booterstown, Blackrock, Co. Dublin
Permission to change the existing 4 no. bedsits at ground and first floors
8, Seafort Parade, Booterstown, Blackrock, Co Dublin. A Protected Structure.
The development subject to planning permission shall consist of; •1no. new frees
45 Rock Road, Blackrock, Co. Dublin, A94P8H3
The development subject to planning permission shall consist of; 1no. new illum
45, Rock Road, Blackrock, Dublin, A94P8H3
5 no. rooflights (total aperature area of 6.8 sq.m)
15, Seafort Parade, Williamstown, Blackrock, Co. Dublin.
Permission is sought for change of use from two dwellings to a single dwelling u
16, Seafort Parade, Booterstown, Blackrock, Co. Dublin
Attic conversion and attic extension to the rear.
37, Rock Road, Blackrock, Co. Dublin.
Permission is sought for general refurbishment, restoration and minor internal
17, Seafort Parade, Blackrock, Co. Dublin
Permission is sought for change of use from medical use / laser clinic to reinst
53, Rock Road, Blackrock, Co. Dublin, A94 V0T8
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?