30 Carysfort Road, Dalkey, Dublin, A96 HX24 (Architectural Conservation Area)
Assessment PeriodPlanning application REF11526
Dublin - Dun Laoghaire Rathdown County Council
Proposed Development
Wrapping + insulation of house as per SEAI warmer homes grant, see letter.
Application Timeline
Application received
4 Aug 2026
Decision due
31 Aug 2026
Application Details
- Location
- 30 Carysfort Road, Dalkey, Dublin, A96 HX24 (Architectural Conservation Area)
- Applicant
- N/A
- Application Type
- Section 5
- Planning Authority
- Dun Laoghaire Rathdown County Council
- Site Area
- 335 ha
Timeline
- Registration Date
- 4 August 2026
- Status
- Assessment Period
- Decision
- Pending
- Decision Due
- 31 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of the single storey extension
30, CARYSFORT ROAD, DALKEY, CO. DUBLIN
Retention for previously approved (Reg.Ref. D04A/0957) and (Reg.Ref.D05A/0364
30, Carysfort Road, Dalkey, Co. Dublin
Demolition of existing side and rear extension and the construction
30, Carysfort Road, Dalkey, Co. Dublin
retention of as-built amendments to previously approved single storey kitchen/ l
30, Carysfort Road, Dalkey, Co. Dublin
Permission for development. The development will consist of the construction
28, Carysfort Road, Dalkey, County Dublin
Permission for: A. Construction of new 23 sqm first floor rear extension for 2
26 Carysfort Road, Dalkey, Co Dublin
To increase the width of the entrance gate to my residence by demolishing
26, Carysfort Road, Dalkey, Co. Dublin
Permission sought to construct a porch incorporating toilet at main location.
36, Carysfort Road, Dalkey, Co Dublin
Permission for the change of the entrance from pedestrian to vehicular
21, Corrig Road, Dalkey, Co. Dublin
The development consists of A) the demolition of the existing outbuilding to rea
23 Corrig Road, Dalkey, Co Dublin, A96D7P3
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?