← Back to search

Lands to the south of Belcamp 220 kV substation, Belcamp, Dublin 17

WITHDRAW APPLICATION

Planning application F20A/0692

Dublin - Fingal County Council

Proposed Development

Permission for a new gas reciprocating engine power plant which will h

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Dec 2020

  2. Decision due

    23 Feb 2021

  3. Application withdrawn

    1 Jun 2021

  4. Decision: WITHDRAW APPLICATION

    8 Jun 2021

Application Details

Location
Lands to the south of Belcamp 220 kV substation, Belcamp, Dublin 17
Applicant
N/A
Application Type
Permission
Planning Authority
Fingal County Council
Site Area
17000 ha

Timeline

Registration Date
21 December 2020
Status
Decision made
Decision
WITHDRAW APPLICATION
Decision Date
8 June 2021
Withdrawn
1 June 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
F21A/0681GRANT PERMISSION3 Aug 2022

Mayne Stability Limited intends to apply for permission for a period o

Lands to the south of Belcamp 220 k V Substation, Dublin 17

80m
4004/20APPLICATION WITHDRAWN21 Dec 2020

A new gas reciprocating engine power plant which will have the capability to generate 50 MW of electricity. The footprint of the development site area within Dublin City Council is 1.1 hectares, a further 1.7 hectares is located within Fingal County Council's administrative area. The proposed development within Dublin City Council area comprises: 1. A gas above ground installation (AGI) compound which will contain the Pressure Regulating & Metering Building (approx. 3.0 m width by 11.0 m length x 4.1 m height); Control & Instrumentation Building (approx. 3.0 m width by 4.0m length x 4.3 m height); Chromatography Building (approx. 2.5 m width by 2.5 m length by 4.2 m height). 2. Access to the power plant development will be via the R139 and one emergency exit is also provided. 3. Internal access roads, two bridges to access the remainder of the site within the Fingal County Council area, and the overall development will be enclosed with a 2.6 m high palisade security fencing. 4. All other ancillary site development works including water supply pipeline, firewater and stormwater drainage, as required to facilitate the development. 5. For clarification, the electricity generating power plant is located within the administrative area of Fingal County Council and will be the subject of a separate planning application. The planning application is accompanied by a Natura Impact Statement. This application also relates to a development that will require an Industrial Emission Directive licence from the Environmental Protection Agency.

Lands to the south of Belcamp 220 kV substation, Dublin 17

80m
4091/21APPLICATION DECLARED INVA15 Dec 2021

Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation , Belcamp Dublin 17 . The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours.

The site of c. 0.94 ha at lands South of Belcamp 220 kV Substation, Belcamp, Dublin 17

80m
3041/22GRANT PERMISSION12 Jan 2022

Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation , Belcamp Dublin 17 . The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours.

The site of c. 0.94 ha at lands South of Belcamp 220 kV Substation, Belcamp, Dublin 17

122m
WEB1600/23GRANT RETENTION PERMISSIO21 Jul 2023

RETENTION: The retention of the existing scrolling internally illuminated double sided ‘Metropole’ advertising display case mounted on an offset leg.

On the public footpath on the Southern side of the N32, on the West side of the entrance to Saint Michael's House, Belcamp, Dublin 17

243m
F23A/0040GRANT PERMISSION1 Sept 2023

The development will consist of the provision of

ESB Belcamp 220 kV Substation, in the townlands of Clonshaugh and Belc

283m
F23A/0549GRANT PERMISSION15 Sept 2023

Planning permission for the installation of

Craobh Chiarain GAA Club grounds at R139, Clonshaugh, Co. Dublin

370m
3504/22GRANT PERMISSION11 Mar 2022

Planning permission for development at this site will consist of demolishing an existing shed to the rear of the existing site and building a new ground & first floor extension to the rear of the existing house. A proposed new ground floor only porch to the front of the existing house and all ancillary works.

2 Moatview Court, Dublin 17, D17 N448

486m
3582/21GRANT PERMISSION28 Sept 2021

Planning permission for the development will consist of a proposed new ground floor only extension to the rear of the existing house and all ancillary works.

66 Moatview Court, Dublin 17, D17 K294

503m
2377/21GRANT PERMISSION12 Mar 2021

The development will consist of demolishing an existing shed to the rear of the existing site and building a new ground & first floor extension to the rear of the existing house. A proposed new ground floor only porch to the front of the existing house and a new window in the side elevation and all ancillary works.

58, Moatview Court, Dublin 17, D17 H324

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?