Brinkwater House , Dyke Road , Galway

CONDITIONAL

Planning application 17138

Galway - Galway City Council

Proposed Development

Permission for development to carry out alterations and convert existing single family dwelling to a community dwelling, construction of private sewage treatment plant and percolation area including all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 May 2017

  2. Further information requested

    7 Jul 2017

  3. Further information received

    8 Aug 2017

  4. Decision: CONDITIONAL

    1 Sept 2017

  5. Decision due

    4 Sept 2017

  6. Grant issued

    5 Oct 2017

Application Details

Location
Brinkwater House , Dyke Road , Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway City Council
Site Area
0.215 ha
Floor Area
100 sq m
Residential Units
1

Timeline

Registration Date
26 May 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 September 2017
Grant Date
5 October 2017
Permission Expires
4 October 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

19m
1960CONDITIONAL8 Mar 2019

Permission to retain and complete alterations to existing entrance gate and on site parking layout

Brinkwater House , Dyke Road , Galway

134m
2460324CONDITIONAL11 Oct 2024

Permission for development which will consist of ground-mounted photovoltaic solar panels with a maximum actual square metreage of 2,830 m2 distributed over grass areas in combination with associated ancillary works. To accommodate solar PV 3 no. trees will be removed, and the fence of length 50 m will be realigned along the south-eastern boundary. Works will be completed at Terryland WTP in Terryland Waterworks, Dyke Road, Terryland, Galway, H91 V097. A Natura Impact Statement will be submitted to the planning authority along with the application. The proposed development consists of work in the curtilage of protected structure; conservation architect’s comment will be submitted along with the application

Terryland Water Treatment Plant , Dyke Road , Terryland

302m
2396CONDITIONAL19 Apr 2023

Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year

166 Dun na Coiribe , Headford Road , Galway

312m
2397CONDITIONAL19 Apr 2023

Permission for development which consists of a change of use from dwelling to short term let for a period not exceeding 90 days per calendar year

168 Dun na Coiribe , Headford Road , Galway

315m
17321CONDITIONAL23 Nov 2017

Permission for three dwelling houses and associated site works and services

Caislin , Dyke Road , Terryland

320m
19107CONDITIONAL11 Apr 2019

Permission for development which comprises of a new raw water intake works located on the east bank of the River Corrib, 100m downstream of Quincentenary Bridge; associated pipework to transfer raw water from the new intake works to the existing intakes works , which in turn supplies Terryland Water Treatment Plant (WTP); and a new treated water rising main extending between Terryland WTP and existing rising main on the east bank of the River Corrib. The works comprises: New Intake Works. a) Underground inlet works chamber and associated equipment; b) Control building; c) Compound security fencing and gates, safety fencing, drainage, lighting, hard - standing areas and landscaping, ducting and water supply connection; d) Access road from Dyke Road with new entrance and gates; e) Floating boom system offset 5m inti the river from proposed headwall of the intake works. Slipway. f) A new slipway, including a new public access road from Dyke Road. The slipway will be located on the east bank of the River Corrib, circa. 140m downstream of the Quincentenary Bridge. Transfer Mains. g) 215m of 1200mm diameter underground transfer gravity main passing under Terryland parkland, the Quincentenary Bridge eastern approach road (N6) and Terryland River. This will connect the new intake works to the existing raw water mains, which supply Terryland WTP. Works will include 2 no. chambers along the transfer main ( north and south of the N6 Road) and 1 no. chamber for connection to the existing raw water mains at the existing intake site; h) Modifications to the existing intake works in Terryland (decommissioning and civil works). Rising Main. I) 535m of 600mm diameter ductile iron underground rising main from Terryland WTP of the eastern bank to the River Corrib, including a pipe - bridge over the Terryland River, to connect to the existing 450mm diameter ductile iron rising main upstream of the River Corrib crossing. Surge Vessel. j) 1 no. 35m3 surge vessel tank at Terryland WTP for the proposed rising main. A Natura Impact Statement has been submitted.

Dyke Road , Terryland , Galway

335m
22342CONDITIONAL21 Dec 2022

Permission for development which consists of a change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year

172 Dun na Coiribe , Headford Road , Galway

346m
2360187CONDITIONAL22 Dec 2023

Permission for development which consists of the change of use from student accommodation to short term let for a period not exceeding 90 days per calendar year

Units 219 220 221 222 , Dun Na Coiribe , Galway

355m
1794CONDITIONAL7 Apr 2017

Permission for retention for the provision of a porch structure to the front elevation of dwelling house

No. 171 Castlelawn Heights , Galway

360m
23251REFUSED21 Dec 2023

Permission for development which consists of (a) Widening of existing vehicular access (b) Provide for an off street car parking space on site in lieu of the existing front lawn area and (c) All associated site works

59 Castlelawn Heights , Headford Road , Galway