← Back to search

Unit B , Baily Point , Upper Salthill

CONDITIONAL

Planning application 23149

Galway - Galway City Council

Proposed Development

Permission for development which consists of the removal of the existing steps/platform lift, and provision of a ramp and steps, to the front of unit B

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Jun 2023

  2. Decision: CONDITIONAL

    26 Jul 2023

  3. Decision due

    6 Aug 2023

  4. Grant issued

    30 Aug 2023

Application Details

Location
Unit B , Baily Point , Upper Salthill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway City Council
Site Area
0.862 ha
Floor Area
100 sq m
Residential Units
1

Timeline

Registration Date
12 June 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 July 2023
Grant Date
30 August 2023
Permission Expires
29 August 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
2414CONDITIONAL22 Mar 2024

Permission for development which consists of alterations to the previously approved permission ref 23/149 (for the removal of the existing steps/platform lift and provision of a ramp and steps to the front of unit b)The alterations comprise the widening and recessing into the building of the access doors to the unit and for the signage onto upper Salthill Road and Lenaboy Avenue

Unit B Baily Point , Upper Salthill Road , Galway

6m
2560355CONDITIONAL27 Nov 2025

Permission for development which consists of: Belfort Capital Ltd is making an application to Galway City Council for retention permission for signage to the front (south) façade of the building including a banner sign (1.8 sqm) over the entrance door and a projecting sign on the facade (0.5 sqm) at unit B, Energie Fitness Gym at Baily Point, Upper Salthill, Galway, H91 W93P.

Energie Fitness Gym Unit B at Baily Point , Upper Salthill , Galway

13m
2444CONDITIONAL16 Aug 2024

Permission for development which consists of; the development will consist of an amendment to reg. ref. 23/149 and reg. ref. 24/14 and will comprise the provision of a retail unit (c. 436.96 sq.m) with ancillary off licence sales area (c .28.1 sq. m) within the existing unit previously permitted as a licensed bar under reg. ref. 99/399. The development also includes internal modifications to facilitate the unit layout and all ancillary site services and site development works.

Unit B Baily Point , Upper Salthill Road , Galway

23m
17384CONDITIONAL22 Dec 2017

Permission is sought for works comprising of (1) Retention Permission for amalgamation of 2 no. top floor apartments (previously nos. 5 & 6) into one unit (2) Permission for proposed change of use of all 5 apartments into a Hotel comprising of family suites (3) Permission for proposed new external fire escape stairs to rear of the building and (4) proposed change of use of roof level open space into roof garden for Hotel use, along with all ancillary works

O'Reilly's Bar and Kitchen , 232 & 234 Upper Salthill , Galway

39m
2560245CONDITIONAL13 Aug 2025

Permission for development which consists of: permission is sought by Vertus Aesthetica Ltd. for beauty and therapy rooms, signage, as well as all associated services

Unit 1 Baily Point , Salthill , Galway

39m
2412CONDITIONAL14 Mar 2024

Permission for a development which consists of the change of use of Unit C (previously called Unit 2) Baily Point from retail used to café/coffee shop

Baily Point , Upper Salthill , Galway

45m
2250CONDITIONAL9 Mar 2022

Permission for development which will consist of a two storey and single storey rear extension, internal alterations, demolition of existing rear single storey extension and rear store and all ancillary site works

No. 3 Lenaboy Avenue , Salthill , Galway

56m
2660107CONDITIONAL27 Mar 2026

Permission for development which consists of: retention of an extension to the existing apartment and all ancillary works

Apartment 79 Baily Point , Upper Salthill , Galway

70m
20104CONDITIONAL17 Apr 2020

Permission is sought for the development which will consist of the retention of an existing single storey rear extension, and permission for the change of use from ground floor office to restaurant, revised shopfront and signage

224 Upper Salthill , Galway

80m
18379CONDITIONAL22 Nov 2018

Permission to remove the existing chimney breast and to erect an external glass fronted lift to the southern elevation fronting onto Salthill Promenade/Quincentennial Drive

183 - 187 Upper Salthill , Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?