← Back to search

Card Factory , 37 Eyre Square , Galway City

N/A

Planning application 2560125

Galway - Galway City Council

Proposed Development

Permission for development which consists of: the development consists of 1 number new fascia sign with recessed hidden trough lighting fitted to the front façade of the premises.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 May 2025

  2. Further information requested

    26 Jun 2025

  3. Application withdrawn

    6 Mar 2026

Application Details

Location
Card Factory , 37 Eyre Square , Galway City
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway City Council
Site Area
0.011 ha

Timeline

Registration Date
2 May 2025
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
6 March 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2460209REFUSED3 Jul 2024

Permission for development which consist of; retention of 2no. unauthorised Card Factory Signs fitted to front façade of premises

Card Factory , 37 Eyre Square , Galway City

0m
2360154REFUSED5 Dec 2023

Permission for development which consists of the retention of 3no. unauthorised Card Factory Signs fitted to front façade of premises

Card Factory , 37 Eyre Square , Galway City

20m
23170REFUSED5 Jul 2023

Permission for development which consists of retention permission for dynamic signage as displayed to the front façade of existing building

Eyre Square , Galway , H91T2CX

20m
2560383N/A18 Dec 2025

Permission for development which consists of: planning permission for the retention of staff areas at first-floor level. Permission is also sought for the provision of 5 No. new apartments, by way of revising the existing internal layout. Permission is also sought to include new roof lighting, ancillary storage areas, and associated roof-level amenity space at 36 Eyre Square, Galway, H91 T2CX.

36 Eyre Square , Eyre Square , Galway

20m
2560021REFUSED29 Jan 2025

Permission for development which consists of; retention of existing staff accommodation to first floor level.

First Floor level , 36 Eyre Square , Galway

31m
19272N/A27 Sept 2019

Permission is sought for (1) new bar and restaurant façade at ground floor level, to include raised lettering and associated lighting (2) replacement of existing high level hotel signage to the front elevation, along with all associated works

'The Imperial Hotel' , 35 Eyre Square , Galway

32m
20138CONDITIONAL25 May 2020

Permission is sought for the upgrade of a phone kiosk. The development which will consist of the replacement of the existing telephone kiosk with a new telephone kiosk with integral communication unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height of 2.43m. a depth of 0.762m and a width of 1.096 m

On the public footpath on Eyre Square , at junction with , Rosemary Avenue

39m
20131CONDITIONAL25 May 2020

Permission for development which will consist of change of use of the existing shop (vacant) to a Café/Restaurant with an ancillary take-away delivery offer at ground floor level, associated storage and office space at first floor, replacement signage to front elevation and all other associated ancillary site service works. The proposed development is located within Eyre Square Architectural Conservation area

Former Dunnes Stores - Paul Costelloe Living Shop , No 40 Eyre Square , Galway

40m
1716CONDITIONAL26 Jan 2017

Permission for development which will consist of the demolition of a single storey building to the rear and construction of a single storey extension and two storey extension to the rear, with alterations to existing window opes along with all associated site works

No. 1 Rosemary Avenue , Eyre Square , Galway

44m
2460400CONDITIONAL19 Dec 2024

Shopfront alterations which comprise of: change of lettering/signage from “permanent TSB” with logo, to “ptsb” and change of elevational colours and ATM surround in keeping with corporate colouring.

33 Eyre Square , Galway , Ireland

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?