Galway Harbour , New Docks , Townparks Galway

N/A

Planning application 2560273

Galway - Galway City Council

Proposed Development

Permission for development which consists of: planning permission is sought by the Galway Harbour Company for development at a site located on the centre pier in the Galway Harbour, New Docks, in the townland of Townparks, Co. Galway. The proposed development will consist of the demolition of the existing c. 257 sqm building to facilitate the ongoing operation of harbour activities and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Sept 2025

  2. Further information requested

    27 Oct 2025

  3. Further information received

    30 Jan 2026

  4. Application withdrawn

    9 Mar 2026

  5. Decision due

    12 Mar 2026

Application Details

Location
Galway Harbour , New Docks , Townparks Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway City Council
Site Area
0.147 ha

Timeline

Registration Date
2 September 2025
Status
WITHDRAWN
Decision
N/A
Decision Due
12 March 2026
Withdrawn
9 March 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

21m
2660291N/A13 Aug 2026

Permission for development which consists of: Planning permission is sought by the Galway Harbour Company for development at a site located on the centre pier in the Galway Harbour, New Docks, in the townland of Townparks, Co. Galway. The proposed development will consist of the following: 1. Dismantling and removal of the existing c. 257 sqm shed and the making good of the ground conditions following its dismantling. 2. Provision of additional surface water drainage measures to improve and ensure the adequacy of surface water run-off management on the site. 3. Provision of all associated site works and ancillary services necessary to facilitate the proposed development. The proposed development seeks to improve the efficiency and safety of ongoing port operations and will not lead to any material change of use or intensification of existing operations. This application is supported by a Natura Impact Statement (NIS)

Galway Harbour , New Docks , in the townland of Townparks Galway

164m
21424CONDITIONAL22 Dec 2021

Permission for retention which will consist of retention for 2 no. security roller gates located at the Eastern and Western Ends of Mulvoy Quay, Galway Harbour. Previously permitted and constructed under Pl. Ref. No. 16/29. The security gates are located between Dock Road and the commercial dock. The commercial dock is a protected structure (RPS Ref. 8501)

Mulvoy Quay , Galway Harbour , Galway

167m
19290REFUSED22 Oct 2019

Permission for the construction of two additional rooflights

30 Long Walk , Galway

168m
19348CONDITIONAL12 Dec 2019

Planning permission for a new window opening

14 Cuirt Eanna , The Long Walk , Galway

171m
18437REFUSED21 Dec 2018

Permission for retention, the development to be retained consists of a 1.69 m high timber clad enclosure, to the forecourt

The House Hotel , Corner of Flood Street and New Dock Road , Lower Merchants Road

176m
2560221CONDITIONAL18 Jul 2025

Permission for development which consists of: Galway Harbour Hotel Limited is applying to Galway City Council for permission for a) change the of use of existing ground floor leisure centre and meeting rooms (271.4 m2) to 12 no. hotel bedrooms, b) a minor increase to floor area through infilling an existing undercoft area to the front elevation creating additional bedroom space (12.7m2), c) reconfiguring existing carparking with the loss of 1No. parking space, d) associated internal and elevational changes and e) all associated siteworks and services

Harbour Hotel , New Dock Rd , Galway

180m
1991CONDITIONAL26 Mar 2019

Permission for development which consists of the erection of 1 No. non- illuminated fascia sign and 1 No. double- sided internally illuminated projecting sign

7B Marina House , Dock Road , The Docks

181m
19356CONDITIONAL19 Dec 2019

Planning permission for the development which will consist of (1) Amalgamation of the pair of terraced buildings to form a single terraced dwelling house (2) Change of use of ground floor of no 4 Dock Road from office use to form part of the proposed single dwelling house (3) Construction of 3 storey dwelling house extension to rear of No. 4 Dock Road with roof Terrace garden and construction of 4 storey dwellinghouse extension to the rear of no. 5 Dock Road. (4) Replacement of existing timber windows in poor condition, with timber sliding sash windows at no 4 & 5 Dock Road.(5) Internal alterations, together with all associated site works and services

4 & 5 Dock road , Galway

189m
18175CONDITIONAL5 Jun 2018

Permission for development which will consist of an extension and modifications to existing terraced building and for change of use from residential to office together with all associated site works. The building is located in a architectural conservation area.

4 New Dock Street , Galway

189m
2660073N/A7 Mar 2026

Permission for development which consists of: partial demolition works to existing dwelling Alterations to floor layouts, alterations to front elevation facade Refurbishment/upgrade works to existing dwelling Construct new rear extension Refurbishment/Upgrade works to existing dwelling Construct new rear extension All associated site works

4 New Dock Street , The Docks , Galway

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.