Galway Harbour Company , New Docks Galway , Co. Galway
N/APlanning application 2660002
Galway - Galway City Council
Proposed Development
Permission for development which consists of: Retention Permission for the existing car park for use on a temporary basis for up to two years for the purposes of mitigating the impact of the proposed construction works on the operation of the adjacent bus depot. The car spaces shall be for Bus Eireann staff use only during this period.
View the full application file on the council's planning portal →Application Timeline
Application received
9 Jan 2026
Further information requested
4 Mar 2026
Further information received
31 Aug 2026
Decision due (upcoming)
27 Sept 2026
Application Details
- Location
- Galway Harbour Company , New Docks Galway , Co. Galway
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Galway City Council
- Site Area
- 0.176 ha
Timeline
- Registration Date
- 9 January 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 27 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development which consists of: Permission is sought by Bus Éireann at their existing Bus Depot, Galway Harbour Enterprise Park, New Docks, The Docks, Galway City (Eircode H91A304). The development will consist of the construction, installation and commissioning of: • 35 no. Electric Vehicle (EV) charge stations (i.e. 70 no. charge ports) to serve a new electrical fleet of buses, • A single storey switch room extension to the maintenance garage building (c. 13.47sqm gross floor area), • 1 no. free standing single storey modular substation unit (c. 35.71sqm gross floor area), • 31 no. 6m high additional lighting columns within the existing bus parking area, • Minor revisions to layout to include for relocation of existing bike shelter and security hut, together with associated installation of cabling/charging equipment and associated site works and services. A Natura Impact Statement (NIS) will be submitted to the planning authority with this application
Bus Éireann Bus Depot , Galway Harbour Enterprise Park New Docks , The Docks Galway City
Permission for development; The development will consist of construction of a single storey telecommunications terminal building including network control equipment & storage of spares. The building size is 346 sq. metres with a 2.4 M high security fence & entrance gate plus associated site works on a site of 0.178HA. The height of the building is to be 5.24 metres
Galway Harbour Enterprise Park , New Docks , Galway
Permission for development which will consist of amendments to approved telecommunication development ( Reg. Ref. 20/50 ) involving telecommunication cabins, emergency generators, management office with staff facilities, security fencing, cabling and associated works. Planning permission sought to remove condition no 3 of the order which limits the use of the development to five years
Galway Harbour Enterprise Park , New Docks , Galway
Planning permission is sought for the development which will consist of (a) Two Telecommunication cabins measuring 10 metres in length, 6 metres in width and 3.076 metres in height. (b) Two emergency generator enclosures acoustically insulated for use only during times of national grid interruption each containing two diesel generators and a double skinned diesel tank. (c) A 12 metre in length, 3 metres in width and 3 metres in height welfare facility containing a toilet, kitchen and office facility for periodic visiting site personnel only at times of maintenance etc. (d) Security fencing around the curtilage of the proposed compound. (e) Associated cabling, landscaping, boundary and ancillary works.
Galway Harbour Enterprise Park , New Docks , Galway
Permission for development which consists of: Galway Cable Landing Station Ltd. intends to apply for retention permission for development at a site of c. 0.14 ha at Galway Harbour Enterprise Park, New Docks, Galway for which permission for development, comprising two cable landing station cabins, two emergency generators, a welfare facility, and associated works, was issued on 9 July 2020 (GCC Reg. Ref. 2050) and amended on 23 March 2021 (GCC Reg. Ref. 20331). This application comprises retention of alterations to the permitted development including the relocation of the westernmost cable landing station cabin and its associated emergency generator, and alterations to the site landscaping, boundary treatments, and all associated works. The cable landing station cabin located on the site is 60 sq m and 3.9 m in height as per permission GCC Reg. Ref. 2050. The easternmost cable landing station cabin, associated emergency generator, welfare facility, access road, and parking spaces have been omitted from the development
Galway Harbour Enterprise Park , New Docks , Galway
E.O.D. on Pl. Reg. Ref. No. 11/113. Permission for the construction of a bitumen storage facility. The development will consist of two number 9330m3 bitumen storage tanks (30m diameter and height above ground to eaves is 11.7m), containment bund, perimeter fencing and associated drainage and site works
Galway Harbour Enterprise Park , New Docks , Galway
Permission for development which will consist of (a) Ground floor rear extension and (b) First floor side extension over garage
15 Mellows Park , Renmore , Galway
Permission for development which will consist of the construction of a single-story extension to the rear of existing house and construction of a front porch and all associated site works and alterations
No.17 Mellows Park , Renmore , Galway
We, The Commissioners of Public Works, intend to apply for planning permission for external development works at this site known as Áras an tSáile, Lakeshore Drive, Renmore, Galway. The proposed development will consist of energy upgrade works for the provision of 2 no. new enclosed heat pumps to the west of the existing building, (resulting in the removal of 4 no. existing car parking spaces); Provision of 2 no. new car parking spaces and associated EV charging infrastructure(resulting in a total of 109 no. carparking spaces), including provision for all new underground ducting connecting the existing building to the existing and new EV car/bicycle charging spaces all to the north of the existing building and all associated ancillary infrastructure works.
Áras an tSáile , Lakeshore Drive , Renmore Galway
Permission for development which will consist of the demolition of an existing single storey office building (140.7 sqm), the demolition of two ancillary buildings (17.4 sqm & 19.2 sqm) along with all associated works.
Mor Oil , Lough Atalia Road , Galway
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?