← Back to search

Bunowen ,

N/A

Planning application 17153

Galway - Galway County Council

Proposed Development

for the construction of a dwelling house, effluent treatment system and associated works. Gross floor space of proposed works: 94sqm

View the full application file on the council's planning portal →

Application Details

Location
Bunowen ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.33 ha
Floor Area
94 sq m
Residential Units
1

Timeline

Registration Date
10 February 2017Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

37m
181353CONDITIONAL26 Sept 2018

to 1) demolish existing sub-standard house and replace with a new single storey dwelling house 2) replace existing septic tank and percolation area with a new treatment system and polishing filter as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works - 203 sqm. Gross floor space of any demolition - 58 sqm.

Bunowen Td. ,

484m
192005REFUSED20 Dec 2019

for the construction of a two storey dwelling house with photovoltaic solar panels and septic tank connected to existing sewage treatment system pl. ref. 11/218 together with all associated site development works and services. Gross floor space of proposed works: 244 sqm

Tullyconor ,

504m
2260072REFUSED7 Feb 2022

for the construction of a new single storey dwelling house with solar panels and a new wastewater treatment system and percolation unit together with all associated site development works and services. Gross floor space of proposed works 318 sqm.

Tullyconor ,

504m
2260566CONDITIONAL2 Jun 2022

to construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works.Co. Galway. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works 193.80sqm.

Bunowen ,

562m
2661189CONDITIONAL14 Jul 2026

of existing extension to south west of existing house and other modifications and permission for new extension to north of existing house, internal layout changes, upgraded domestic wastewater treatment system and associated site works and services

Tullyconor , Leenane , Co. Galway

562m
25351REFUSED19 Dec 2025

of extension to south west of existing house and permission for new extension to north of existing house including internal layout changes and associated site works and services

Tullyconnor , Leenane , Co Galway

619m
22980REFUSED18 Aug 2022

to (A) demolish existing conservatory (B) form archway in existing building (C) Construct new two storey extension (D) Construct new bedroom block (E) construct 6 no. detached sleeping pods (F) upgrade existing wastewater treatment system (G) associated site works at The Connemara Hostel, Tullyconor Leenane. (Gross floor space 616.56sqm)

Tullyconor ,

619m
171142CONDITIONAL27 Jul 2017

to (A) demolish existing conservatory (B) form archway in existing building (C) Construct new two storey extension (D) Construct new bedroom block (E) construct 6 no. detached sleeping pods (F) upgrade existing wastewater treatment system (G) associated site works at The Connemara Hostel, Tullyconor Leenane. (Gross floor space 616.56sqm)

Tullyconor ,

621m
18285CONDITIONAL13 Mar 2018

of 2 storage units. Gross floor space of works to be retained 287 sqm.

Tullyconor Td. Derrynasligaun ,

734m
20225CONDITIONAL21 Feb 2020

for alterations and ancillary site works carried out on the existing boat shed (Previous Planning Reference No. 08/363). Gross floor space of works to be retained: 72 sqm

Tullyconor ,

The submission window has closed

Observations on this application closed on Thursday 16 March 2017, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?