← Back to search

Claregalway ,

CONDITIONAL

Planning application 181547

Galway - Galway County Council

Proposed Development

of change of use for Unit 8 from Light Industrial to office space as constructed. Permission is also sought for change of use of Unit 9 from Light Industrial to office space to include any associated site development works and services as required. Gross floor space of proposed works 744 sqm. Gross floor space of work to be retained 418 sqm.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Oct 2018

  2. Decision: CONDITIONAL

    2 Jan 2019

  3. Decision due

    3 Jan 2019

  4. Grant issued

    11 Feb 2019

Application Details

Location
Claregalway ,
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.14 ha

Timeline

Registration Date
31 October 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 January 2019
Grant Date
11 February 2019
Permission Expires
10 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
191667CONDITIONAL25 Oct 2019

for change of use of part of Unit 9 from office space to light industrial as constructed (area 117m2) pervious permission 181547. Gross floor space of work to be retained: 117 sqm

Droim na Gaoithe (Lakeview) ,

35m
21436CONDITIONAL23 Mar 2021

Development will consist of 1) the construction of a new building , comprised of warehouse.2) 2 no. ancillary loading bays and enclosed services yard. 3) a first floor link corridor connecting applicant's existing facility in unit 6 with the adjacent unit 7. 4) works also include the fit out of units 7 & 8b to provide reception, canteen, welfare facilities, production and storage areas, internalised sub-station and switch room at ground level and ancillary office and meeting rooms on a newly constructed first floor mezzanine level. 5)proposed amendments to the existing elevations of 6,7 &8b to include the localized inclusion and reconfiguration of glazing, personnel doors and vehicular access with the provision of signage.6) reconfiguration of car parking spaces, the provision of secure bicycle parking spaces and drop-off/loading bay area.7) all associated site works. Gross floor space of proposed works: 1502.3 sqm

Droim na Gaoithe ,

43m
2360314N/A30 Mar 2023

for minor amendments to granted planning permission, (GCC REF: 21/436) permission for development at Units 6, 7 & 8b. The proposed development consisted of: 1) The construction of a new building, comprised of warehouse, 2) 2no. ancillary loading bays and enclosed services yard, 3) A first floor link corridor connecting the applicant’s existing facility located in Unit 6 with the adjacent unit 7, 4) Works also include the fit out of units 7 & 8b to provide reception, canteen, welfare facilities, production and storage areas, internalised sub-station and switch room at ground level and ancillary office and meeting rooms on a newly constructed first floor mezzanine level, 5) Proposed amendments to the existing elevations of 6,7 & 8b to include the localised inclusion and reconfiguration of glazing, personnel doors and vehicular access with the provision of signage, 6) Reconfiguration of car parking spaces, the provision of secure bicycle parking spaces and drop-off/loading bay area, 7) all associated site works. The proposed amendments include; 1) the provision of a mezzanine floor to Unit 6, 2) minor alterations of the southern elevation of Unit 6 to provided equipment access to ground and first floor, 3) minor alterations of the eastern elevation of Unit 6 to allow for building services, 4) reconfiguration of the loading bay canopy, 5) minor alterations to overall elevations to reflect reconfigured building services, 6) minor alterations to overall elevations to include for additional access and glazing, 7) All associated site works associated with these amendments

Unit 6 7 and 8B Claregalway Corporate Park , Claregalway , Co. Galway

125m
211082REFUSED17 Jun 2021

for the construction of an extension to existing warehouse, to include associated office space, along with site works with connection to existing services. Gross floor space of proposed works 535sqm

LAKEVIEW ,

136m
212001CONDITIONAL27 Oct 2021

to construction of an extension to existing warehouse for storage along with site works and parking with connection to existing services. Gross floor space of proposed works: 398 sqm

Lakeview ,

142m
201749CONDITIONAL19 Nov 2020

to carry out works to an existing warehouse unit. This will include the construction of a mezzanine floor to provide office space and staff services. Permission is also sought to provide windows in the front elevation. Gross floor space of proposed works: 71.4 sqm

Droim na Gaoithe ,

148m
19528CONDITIONAL9 Apr 2019

to construct a mezzanine floor and to retain changes to elevations at Unit 25A. Gross floor space of proposed works: 163.1 sqm

Droim na Gaoithe ,

150m
17472CONDITIONAL11 Apr 2017

for development at Coláiste Bhaile Chláir, Baile Chláir, Co. na Gaillilmhe, roll number 76233C. The Development will consist of a new temporary single storey 6-classroom 307 sqm. Post Primary School building including all associated site works and landscaping in the location of the existing school building ball courts. (Gross floor space of proposed works: 307 sqm.)

Baile Chláir ,

150m
18520CONDITIONAL26 Apr 2018

for the erection of 5 no. 49 sqm. pre-fabricated temporary classroom buildings with connections to services and all other associated site works. Gross floor space of proposed works 245 sqm.

Bhaile Chlair ,

153m
201866CONDITIONAL8 Dec 2020

for the construction of an extension to existing warehouse, to include associated office space, along with site works with connection to existing services. Gross floor space of proposed works: 245.3 sqm

Claregalway ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?