Proposed Development
at the Cathedral of the Assumption, a protected structure, for refurbishment of the Sanctuary including alteration of the Reredos, removal of existing fixtures & fittings, (albeit modern insertions) and commissioning of new replacements. Gross floor space of proposed works 178 sqm. Gross floor space of work to be retained 894 sqm. Gross floor space of any demolition 178 sqm.
View the full application file on the council's planning portal →Application Timeline
Application received
17 Dec 2018
Decision: CONDITIONAL
18 Feb 2019
Decision due
19 Feb 2019
Grant issued
1 Apr 2019
Application Details
- Location
- Townparks 3rd Division ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.02 ha
Timeline
- Registration Date
- 17 December 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 February 2019
- Grant Date
- 1 April 2019
- Permission Expires
- 31 March 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the extension to existing cemetery to provide 18 additional graves, provision of additional railings, alterations to existing railings, resurfacing of graves and removal of everygreen trees. The application pertains to a protected structure (RPS No. 3811).
Townpark ,
for extension to existing cemetery to provide additional graves, relocation of existing gates and railings, removal of existing trees, and associated ground works
Townparks (3rd Division) , Tuam , Co. Galway
for the extension and renovation of the existing ball alley for educational use and the construction of an enclosed yard and store, all at S. Jarlath's College which is a Protected Structure as defined by Part IV of the 2000 Planning & Development Act. Gross floor space of proposed works (extension) 298 sqm.
Townparks 4th Division ,
for proposed alteration to front elevation, and internal fire escape corridor from technical drawing room (previously approved Pl Ref 18/619) at St. Jarlath's college, Townspark 4th Division, Tuam, Co. Galway, which is a Protected Structure as defined by Part IV of the 2000 Planning and Development Act
Townspark 4th Division ,
for (a) internal works to existing building to convert 4 classrooms into 2 classrooms at first floor level, (b) the erection of a new single-storey construction studies building (398sqm) with associated store (36sqm) and yard and (c) demolition of existing mass concrete ball court (St. Jarlath's College is a Protected Structure as defined by Part IV of the 2000 Planning & Development Act) (SPLIT DECISION REFUSE PERMISSION FOR THE ERECTION OF A NEW SINGLE STOREY CONSTRUCTION STUDIES BUILDING (398 SQM) WITH ASSOCIATED STORE (36 SQM) AND YARD AND DEMOLITION OF EXISTING MASS CONCRETE BALL COURT)
Townparks 4th Division ,
for construction of 2 no. 3 storey enclosed fire escape stairs to replace existing 2 no. open fire escape stairs attached to existing building at St Jarlaths College, which is a Protected Structure as defined by Part IV of the 2000 Planning & Development Act. Gross floor space of proposed works; 138.60sqm
Townparks 4th Division Tuam ,
for a single-storey building, located in the northern part of the school grounds, including removal of existing trees, connection to existing services and infrastructure and associated site works. The proposed development is on the site of the protected structure (RPSRef. No.33). The works proposed do not involve any alterations or interventions to the Protected Structure
Townparks (4th division) , St Jarlaths College Bishop Street , Tuam Co. Galway
for the development identified on the Record of Protected Structures (RPS) Ref. No. 33. The proposed development will consist of a single-storey, stand-alone classroom located in the north-eastern part of the school grounds to the north of the playing field. It is also proposed to provide 1 no. accessible surface car parking space and a section of footpath. The works proposed do not involve any alterations or interventions to the main school buildings or structures. The proposed development also provides for all associated site development works including connection to existing services and infrastructure. Gross floor space of proposed works: 98.50 sqm
Townparks (3rd Division) , Tuam St Jarlath's College Bishop Street , Co. Galway
for the subdivision of existing bedrooms and the formation of openings in shared partition walls to form a total of 10 ensuite bedrooms and 2 connected rooms on first and second floor, the installation of a kitchenette on each level, fire safety measures to existing corridors and the installation of new vertical waste water pipes externally at St. Josephs Presentation Convent, Tuam, a protected structure. Gross floor space of proposed works: 235 sqm of existing floor area. No new floor area is proposed. Gross floor area of work to be retained: 1763.86 sqm
Townsparks 4th Division ,
for 1) demolition of existing derelict building 2) construction of 11 no. residential units (3 no. 3 bedroom terraced dwellings, 4 no. 2 bedroom apartments and 4 no. 1 bedroom apartments), associated car parking and all associated site development works and services. Gross floor space of proposed works 856.7 sqm
Townparks (4th Division) , Tuam , Co. Galway
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?