← Back to search

Ballynahown ,

CONDITIONAL

Planning application 19740

Galway - Galway County Council

Proposed Development

for a detached garage and all associated site works and ancillary services at House no. 1 Gaoth Na Mara. Gross floor space of proposed works: 33.64 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 May 2019

  2. Decision: CONDITIONAL

    9 Jul 2019

  3. Decision due

    10 Jul 2019

  4. Grant issued

    19 Aug 2019

Application Details

Location
Ballynahown ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.77 ha
Floor Area
33.64 sq m
Residential Units
1

Timeline

Registration Date
16 May 2019Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 July 2019
Grant Date
19 August 2019
Permission Expires
18 August 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

68m
192013CONDITIONAL20 Dec 2019

of the existing four houses, treatment plants and percolation areas, on sites with revised boundaries at Gaoth Na Mara. Gross floor space of work to be retained: 1037.81 sqm

Ballynahown ,

71m
171864CONDITIONAL21 Dec 2017

for the construction of 4 two-storey (4/5 bed) detached houses on 4 individual house sites with waste water treatment systems and percolation areas, access road and all associated site works and ancillary services (gross floor space 1004.17sqm)

Ballynahown ,

71m
171297N/A31 Aug 2017

for the construction of 4 two-storey (4/5 bed) detached houses on 4 individual house sites with waste water treatment systems and percolation areas, access road and all associated site works and ancillary services. Gross floor space of proposed works 1004.17sqm.

Ballynahown ,

161m
181381CONDITIONAL2 Oct 2018

for an extension to an existing attached domestic storage space/garage to the side of an existing dwelling house at 14 Barr na gCurragh. Gross floor space of proposed works 22 sqm. (extension to garage)

Furbo ,

218m
191109REFUSED18 Jul 2019

consisting of the demolition of the existing cottage and to construct a new dwelling with effluent treatment unit and polishing filter and all associated site works. Gross floor space of proposed works: 489.8 sqm (G.F = 172.1 sqm, F.F = 164.1 sqm, B.F = 153.6 sqm). Gross floor space of any demolition: 116 sqm

Ballynahown ,

245m
17459CONDITIONAL6 Apr 2017

for alterations to internal layout and elevations of building including extension to the side of the building, for wastewater treatment system and percolation area, and all associated services. (Gross floor space of works to be retained: 24.179 sqm.)

Knockanavoddy ,

252m
2361494CONDITIONAL14 Dec 2023

le haghaidh mionleasuithe ar 4 theach scoite atá deonaíodh faoi 17/118 pl.ref.no.'s arna leasú faoi 20/366. Is éard atá i gceist leis an bhforbairt ná athshuíomh na seideanna tí a choinneáil le cúirtealáiste gach ceann de na 4 theach a cheadaítear teach scoite ar an láthair (mar aon le méadú beag ar spás urláir na seideanna le soláthar limistéar le haighaidh bosca bruascar a stóráil. Spás urláir comhlán na hoibre atá le coinneáil: 22.50 sqm

Cnocán an Bhodaigh , Na Forbacha , Co. na Gaillimhe.

252m
171118CONDITIONAL27 Jul 2017

chun chúig teach scoite a thógáil le chúig gharáiste/stór agus chúig chóireála séarachais aonair ag freastal ar na tithe. Cead pleanála chun bother isteach nua a thogáil chomh maith le oibracha tírdhreachú agus oibreacha forbairt suíomh, chomh maith le draenáil ar an lather, agus cóiréalacha teoirann. Spás urláir comhlán na n-oibreacha beartaithe 1,259.9sqm.

Cnocan an Bhodaigh ,

265m
2260156REFUSED24 Feb 2022

beidh an forbairt comhdhéanta de (1) Foirgneamh 2 stór le húsáid mheasctha atá ann cheana a scartáil, (2) Foirgneamh nua cónaithe agus oifige 2/3 stór ar airde a thógáil, ina mbeidh 7 árasán dhá urlár, le 2 sheomra an ceann, ag leibhéal bunurlár agus an chéad urláir, 2 árasán 3 sheomra an ceann ar leibhéal an dara hurlár agus 1 aonad oifige ar an bunurlár. (3) Stóras bruscair / seid rothar a sholáthar, (4) Mionathruithe ar leagan amach an chórais cóireála eisiltigh a ceadaíodh roimhe seo faoi Pl. Tag. 21/52, (5) Coinníoll Uimhir 11 ar Pl. Tag. Uimhir 21/52 a athrú, (6) Bealach isteach feithicle atá ann cheana féin agus úsáid an bhóthair rochtana feithiclí agus bealach isteach ar bhóthar an chósta R336 ceadaithe faoi Pl. Tag. Uimhir 21/52, 20/336 & 17/1118 a dhúnadh (7) Athbhreithnithe ar leagan amach an tsuímh lena n-áirítear líne foirgnimh/sráid-dreach nua le páirceáil agus spás oscailte pobail ar a chúl, mar aon leis na seirbhísí suímh go léir a bhaineann leis, oibreacha suímh agus tírdhreachtú.

Cnocán an Bhodaigh ,

279m
18777CONDITIONAL7 Jun 2018

for development consisting of a) demolition of existing house and outbuilding, b)construction of 5 No. dwelling houses and domestic sheds with separate wastewater treatment systems and polishing filters, and all associated site development and external works. Gross floor space of proposed works 1,138sqm, demolition 15osqm

Furbo ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?