← Back to search

Ballynahown Furbo ,

CONDITIONAL

Planning application 21452

Galway - Galway County Council

Proposed Development

  1. (a)
    construction of a single storey extension to the frontb(west elevation) of existing single storey dwelling, works to include minor alterations to side of dwelling (south elevation)
  2. (b)
    all associated external site works. Gross floor space of proposed works:7.4sqm.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Mar 2021

  2. Decision: CONDITIONAL

    18 May 2021

  3. Decision due

    19 May 2021

  4. Grant issued

    5 Jul 2021

Application Details

Location
Ballynahown Furbo ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.167 ha
Floor Area
7.4 sq m
Residential Units
1

Timeline

Registration Date
25 March 2021Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 May 2021
Grant Date
5 July 2021
Permission Expires
4 July 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

98m
191395REFUSED6 Sept 2019

for the construction of a first floor level extension to an existing bungalow and a two storey rear extension, new wastewater treatment system and percolation area, and all associated site works. Gross floor space of proposed works: 318.50 sqm

Baile na hAbhann (Ballynahown) ,

106m
22964REFUSED11 Aug 2022

for the construction of 3 number detached dwellings on 3 number individual house sites, consisting of 2 number 4 bedroom houses (type A 203sqm) and a single 5 bedroom house (type B 257sqm), 3 number wastewater treatment systems servicing the three individual house sites, connection to the existing access road and site services of Gleann na bhFear, including all associated site works and landscaping. Gross floor space of proposed works: 663sqm

BAILE NA HABHANN ,

113m
18291CONDITIONAL14 Mar 2018

to provide a treatment plant and associated drainage to service existing dwelling.

Ballynahown ,

114m
2260707CONDITIONAL11 Jul 2022

chun síneadh a chur le taobh an theach cónaithe (Oll-achar urláir 55m2) chomh maith le na seirbhísí agus oibreacha láithreán gaolmhar cuí.

Baile na hAbhann ,

184m
191109REFUSED18 Jul 2019

consisting of the demolition of the existing cottage and to construct a new dwelling with effluent treatment unit and polishing filter and all associated site works. Gross floor space of proposed works: 489.8 sqm (G.F = 172.1 sqm, F.F = 164.1 sqm, B.F = 153.6 sqm). Gross floor space of any demolition: 116 sqm

Ballynahown ,

206m
2361258CONDITIONAL19 Oct 2023

for: 1. demolition of existing derelict house & outbuildings; 2. closing of 3no. existing site entrances & construction of a new site entrance; 3. construction of a new part single storey & part two storey 5-bedroom house with a standalone garage & storeroom, a domestic effluent treatment plant & polishing filter, & all associated site services & site development works. A Natura Impact Statement will be submitted as part of the application

BAILE NA HABHANN , Ballynahown Furbo , Co. Galway

208m
18777CONDITIONAL7 Jun 2018

for development consisting of a) demolition of existing house and outbuilding, b)construction of 5 No. dwelling houses and domestic sheds with separate wastewater treatment systems and polishing filters, and all associated site development and external works. Gross floor space of proposed works 1,138sqm, demolition 15osqm

Furbo ,

215m
19529CONDITIONAL10 Apr 2019

for, A) Retention of existing dwelling house on reduced site number 1 with revised entrance as shown. The existing house to connect to the site services permitted under Pl Ref 11/529 and 17/831 and as revised by this application. The house was originally permitted under Pl. Ref 96/589, there was a subsequent permission to demolish it under Pl Ref 11/529 and 17/831. B) Retention of existing shed (as a garden shed for the benefit of house number 2 only) within revised site number 2. The shed was previously permitted for agriculture use under Pl Ref 99/4059, there was a subsequent permission to demolish it under Pl Ref: 11/529 and 17/831. The shed to be accessed only from within site number 2. C) Revision to the site boundary between site numbers 1 and 2 previously permitted under Pl Ref 11/529 and 17/831 to facilitate the retention of the shed as outlined in B above. D) Revised location of house number 13 on site number 13 previously permitted under 11/529 and 17/831 to provide adequate way leave for storm culvert. E) Minor revision to house types on sites 2, 4, 5, 6, 7 8, 9, 10 and 12 to include revision of floor level previously permitted under Pl Ref 11/529 and 17/831. F) Revision to footpaths within the development, to move paths to house side of roads. G) Revision to road and drainage layout/levels servicing sites 1 to 15 all within the site boundary previously permitted under Pl Ref: 11/529 and 17/831. H) Retention of 750mm storm culvert MH6 to MH 8 and 300mm dry weather flow drain MH6 to MH10 as constructed within the site boundary previously permitted under Pl Ref 11/529 & 17/831. I) All of the above to connect to the on-site treatment plant, storm water attenuation system, public watermains and site services permitted under Pl Ref 11/529 and 17/831. Gross floor space of work to be retained: 336 sqm

Baile na hAbhann ,

232m
19788CONDITIONAL23 May 2019

for garage which has been constructed and all associated services. Gross floor space of work to be retained: Garage = 37.35 sqm

Ballynahown ,

236m
2260594CONDITIONAL9 Jun 2022

to install mounted solar panels at ground level at the rear of his house.Gross floor space of proposed works 27.00sqm.

Baile na hAbhainn ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?