Proposed Development
for the Construction of a two-storey mixed use development consisting of: (a) 7 retail units at ground floor level with an overall gross floor area of 440.9 m² and, (b) 3 x 1-bed apartments, 1 x 2-bed apartment, and 1 x 3-bed apartment at first floor level with an overall gross floor area of 442.1 m², access road, car parking facilities, bin storage, bicycle stands, a wastewater treatment plant with percolation area, landscaping and all associated site works.
Application Timeline
Application received
10 Feb 2022
Application withdrawn
8 Apr 2022
Application Details
- Location
- Cnocán an Bhodaigh ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.46 ha
Timeline
- Registration Date
- 10 February 2022Other applications received that week
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 8 April 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the construction of a domestic garage/store and the relocation of the wastewater treatment system and percolation area previously permitted under 23/60642. Gross floor space of proposed works: 30.00 sqm(garage), 232.00 sqm(house)
Knocknavoddy , Furbo , Co. Galway
for construction of a two storey 4 bedroom dwelling house, a domestic effluent treatment plant and percolation area and all associated site services. Gross floor space of proposed works: 232 sqm
Knockanavoddy ,
Ná [1] an foirgneamh atá ann cheana a choinneáil ar theorainneacha láithreáin athbhreithnithe [2] Cead chun bealach isteach le haghaidh feithicle single a choinneáil ar bhóthar an Chósta, an R336, in ionad an dá bhealach isteach atá ann cheana agus a ceadaíodh roimhe seo ar an láithreán [3] cead chun feabhsúcháin / athruithe ar in gearchlónna an fhoirgnimh chomh maith le hathbhreithnithe gaolmhara ar chomharthatíocht an fhoirgnimh [4] Cead chun córas cóireála eisilitigh athsholáthair agus feabhsaithe, le suiteáil ar shuíomh athbhreithnithe ar an láithreán chun freastal ar an bhfoirgneamh [5] cead chun struchtúir chruach agus comhartaíocht afhreastalaíonn ar an úsáid Iárionad bionn a bhaint [6] Cead chun deireadh a chur le húsáid Iáriona boinn ag lebhéal na talún íochtair [7] cead chun lean uint le húsáid Aicme 8 atá ceadaithe ag leibhéal na talún iochtair [ceadaithe faoi Uimh. Pl. 98-4502] agus an úsáid oifige atá ceadaithe agus atá ann cheanna ar leibhéal uachtarach an talaimh [8] Leasuithe ar leagan amach páirceála mar aon le tírdhreachú agus na hoibreacha agus na seirbhisí láithreáin uileag a bhaineann leis. Spás urláir comhlán na hoibre atá le coinneáil: 377.4 msq.
Cnocán an Bhodaigh ,
chun athruithe ar ceadaithe roimh seo 22/61294 & 25/61071. Séard a bheidh sa athruithe seo na, a) achar urláir an Teach a mhéadú ó 353.m² go 399.m², b) athruithe ar ardáin an Teach agus Garáiste, d) achar urláir an Garáiste a mhéadú ó 41.6m² go 48.8m² agus don obair agus seirbhisí eile atá bainteach leis an suíomh
Cnocán an Bhodaigh , Furbo , Co. Galway
for 1) the construction of a new access road (approx. 83 LM) & services and 2) the construction of a two storey 5 bedroom dwelling house (approx. 353 sqm.), a domestic garage, a domestic effluent treatment plant & percolation area and all associated site services. Gross floor space of proposed works (house) 353 sqm. (garage) 41.6 sqm.
Knockanovaddy ,
for 1) The construction of a new access road (approximately 83 LM) & services and 2) The construction of a two storey 5 bedroom dwelling house (approximately 353sqm), a domestic garage, a domestic effluent treatment plant & percolation area and all associated site services. Gross floor space of proposed works Dwelling 353sqm, Garage 41.6sqm.
Knockanavoddy ,
beidh an forbairt comhdhéanta de (1) Foirgneamh 2 stór le húsáid mheasctha atá ann cheana a scartáil, (2) Foirgneamh nua cónaithe agus oifige 2/3 stór ar airde a thógáil, ina mbeidh 7 árasán dhá urlár, le 2 sheomra an ceann, ag leibhéal bunurlár agus an chéad urláir, 2 árasán 3 sheomra an ceann ar leibhéal an dara hurlár agus 1 aonad oifige ar an bunurlár. (3) Stóras bruscair / seid rothar a sholáthar, (4) Mionathruithe ar leagan amach an chórais cóireála eisiltigh a ceadaíodh roimhe seo faoi Pl. Tag. 21/52, (5) Coinníoll Uimhir 11 ar Pl. Tag. Uimhir 21/52 a athrú, (6) Bealach isteach feithicle atá ann cheana féin agus úsáid an bhóthair rochtana feithiclí agus bealach isteach ar bhóthar an chósta R336 ceadaithe faoi Pl. Tag. Uimhir 21/52, 20/336 & 17/1118 a dhúnadh (7) Athbhreithnithe ar leagan amach an tsuímh lena n-áirítear líne foirgnimh/sráid-dreach nua le páirceáil agus spás oscailte pobail ar a chúl, mar aon leis na seirbhísí suímh go léir a bhaineann leis, oibreacha suímh agus tírdhreachtú.
Cnocán an Bhodaigh ,
for 1) the construction of a new access road (approx. 83 LM) & services and 2) the construction of a two storey 5 bedroom dwelling house (approx. 309 sqm), a domestic garage, a domestic effluent treatment plant & a percolation area and all associated site services. Gross floor space of proposed works (house) 309 sqm. (garage) 41.6 sqm.
Knockanavoddy ,
le haghaidh mionleasuithe ar 4 theach scoite atá deonaíodh faoi 17/118 pl.ref.no.'s arna leasú faoi 20/366. Is éard atá i gceist leis an bhforbairt ná athshuíomh na seideanna tí a choinneáil le cúirtealáiste gach ceann de na 4 theach a cheadaítear teach scoite ar an láthair (mar aon le méadú beag ar spás urláir na seideanna le soláthar limistéar le haighaidh bosca bruascar a stóráil. Spás urláir comhlán na hoibre atá le coinneáil: 22.50 sqm
Cnocán an Bhodaigh , Na Forbacha , Co. na Gaillimhe.
chun chúig teach scoite a thógáil le chúig gharáiste/stór agus chúig chóireála séarachais aonair ag freastal ar na tithe. Cead pleanála chun bother isteach nua a thogáil chomh maith le oibracha tírdhreachú agus oibreacha forbairt suíomh, chomh maith le draenáil ar an lather, agus cóiréalacha teoirann. Spás urláir comhlán na n-oibreacha beartaithe 1,259.9sqm.
Cnocan an Bhodaigh ,
The submission window has closed
Observations on this application closed on Wednesday 16 March 2022, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?