Derryclare and Cloonnacartan , Co. Galway

REFUSED

Planning application 2360

Galway - Galway County Council

Proposed Development

For a ten-year planning permission consisting of: I.) The felling/removal of some 343 hectares of conifer plantation for the purposes of peatland restoration and the establishment of native woodland. ii.) Measures to restore and rehabilitate approximately 281 hectares of Atlantic blanket bog and heathland that is currently planted with lodgepole pine and Sitka spruce forests and managed for commercial forestry. iii.) Conversion of 62 hectares of conifer forestry to native woodland. iv.) Main peatland restoration measures will include tree removal, drain blocking (manual and mechanical) and ground reprofiling. v.) The control of existing invasive species on site and continued control during the restoration works to prevent their spread. vi.) Drain-blocking all existing artificial drainage and artificial land drains currently existing within the peatland restoration areas in order to restore the high water table which is necessary for blanket bog growth. vii.) Provision of silt traps at outflows to block the pathway to the Twelve Bens/Garraun Complex Special Area of Conservation. viii.) Deer fencing to protect 62 hectares of proposed native woodland. ix.) Provision of a Harvest Management Phasing Plan for the proposed project. x.) Provision of new internal access road extending to 1.58 km. xi.) Across the site there will be 4 no. temporary water-crossings constructed in order to acilitate the harvesting of the timber at the site. xii.) Provision of informational signage. xiii.) Resurfacing of up to 8.23 km of existing forestry roads. xiv.) Resurfacing of existing car park to facilitate public access. xv.) Installation of water monitoring stations for real time water monitoring during operations. xvi.) Cutting of roadside trees to improved sightline visibility at site entrance. xvii.) The application is supported by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Feb 2023

  2. Further information requested

    19 Apr 2023

  3. Further information received

    8 Jan 2024

  4. Decision due

    28 Mar 2024

  5. Decision: REFUSED

    28 Mar 2024

Application Details

Location
Derryclare and Cloonnacartan , Co. Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
348 ha

Timeline

Registration Date
23 February 2023Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
28 March 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2461711CONDITIONAL12 Dec 2024

for a ten-year development, this will consist of: i. The felling/removal of some 343 hectares of conifer plantation for the purposes of peatland restoration and the establishment of native woodland. ii. Measures to restore and rehabilitate approximately 281 hectares of Atlantic blanket bog and heathland that is currently planted with lodgepole pine and conifer forests and managed for productive forestry. iii. Conversion of 62 hectares of conifer forestry to native woodland. iv. Main peatland restoration measures will include tree removal, drain blocking (manual and mechanical) and surface smoothing. v. The control of existing invasive species on site and continued control during the restoration works to prevent their spread. vi. Drain-blocking all existing artificial drainage and artificial land drains currently existing within the peatland restoration areas in order to restore the highwater table which is necessary for blanket bog growth. vii. Provision of silt traps at outflows to block the pathway to the Twelve Bens/Garraun Complex Special Area of Conservation. viii. Deer fencing to protect 62 hectares of proposed native woodland. ix. Provision of a Harvest Management Phasing Plan for the proposed project. x. Provision of new internal access road extending to 1.58 km. xi. Across the site there will be 4 no. temporary water-crossings constructed in order to facilitate the harvesting of the timber at the site. xii. Provision of informational signage. xiii. Maintenance of up to 8.23 km of existing forestry roads. xiv. Resurfacing of existing car park to facilitate public access. xv. Installation of water monitoring stations for real time water monitoring during operations. xvi. Cutting of roadside trees to improved sightline visibility at site entrance. xvii. The application is supported by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)

Doire an Chláir Cuil na Ceártan , Cloonnacartan (Cúil na Ceártan) , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?