← Back to search

Inis Oírr , Castle Village , Co. Galway

CONDITIONAL

Planning application 2561130

Galway - Galway County Council

Proposed Development

of a dwelling house, septic tank/effluent treatment system and to construct a percolation area/polishing filter and all associated services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Aug 2025

  2. Decision: CONDITIONAL

    2 Oct 2025

  3. Decision due

    9 Oct 2025

  4. Grant issued

    11 Nov 2025

Application Details

Location
Inis Oírr , Castle Village , Co. Galway
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.17 ha
Floor Area
182.8 sq m
Residential Units
1

Timeline

Registration Date
15 August 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 October 2025
Grant Date
11 November 2025
Permission Expires
10 November 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
2560497N/A25 Apr 2025

for the retention of a dwelling house and septic tank/effluent treatment system and to construct a percolation area/polishing filter and all associated services. Gross floor space of works: House 193.05 sqm

Inish Oirr , Castle Village , Co. Galway

109m
201476CONDITIONAL9 Oct 2020

for demolition of an existing stone and rubble cottage, the construction of a replacement dwelling in the same location, and the installation of a replacement waste water treatment system and polishing filter, and all associated site works. Gross floor space of proposed works: 220 sqm. Gross floor space of any demolition: 125 sqm

Castle Village Inis Oirr ,

109m
25338UNCONDITIONAL10 Dec 2025

for demolition of an existing stone and rubble cottage, the construction of a replacement dwelling in the same location, and the installation of a replacement waste water treatment system and polishing filter, and all associated site works

Castle Village Inis Oirr ,

186m
171207CONDITIONAL10 Aug 2017

for development to include provision of: (A) 1 no. raw water storage tank of approximately 637sqm with an overall height of approximately 5.4m (approximately 4.3m without handrail): (B) Associated site development works, including; hardstand areas, upgrade of existing site drainage system, provision of a temporary contractor's area, all necessary ancillary pipework, mechanical and electrical services, instrumentation and automation. All of the above is proposed on a site of approx. 0.13hectare

Inis Oírr ,

192m
20457N/A9 Apr 2020

chun '10 Glamping Pods' a thogail sa ionad campála atá ann. Spás urláir comhlán na n-oibreacha beartaithe i 105 sqm

Inis Oirr ,

215m
171023CONDITIONAL10 Jul 2017

for (A) 1 no. elevated raw water storage tank of approximately 1,271sqm with an overall height of approximately 9.0m (approximately 7.9m without handrail), (B) 1 no. raw water storage tank of approximately 857sqm with an overall height of approximately 5.4m (approximately 4.3m without handrail), (C) 2 no. chemical storage units of approximately 6.8sqm and 5.0sqm with heights of approximately 2.7m and 2.75m respectively (D) 1 no. filter backwash tank of approximately 4.3m with an overall height of approximately 4.4m (approximately 3.3m without handrail) (E) Relocation of storage unit of approximately 15sqm with an overall height of approximately 3m (F) Retention of existing treatment control building of approximately 43sqm with height of approximately 3.4m (G) Associated site development works, including hardstand areas, upgrade of existing site drainage system, provision of a temporary contractor's area, all necessary ancillary pipework, mechanical and electrical services, instrumentation and automation. All of the above is proposed on a site of approximately 0.93 hectare.

Inis Oírr ,

232m
2660736N/A13 May 2026

the replacement of an existing 10.5 metre telecommunications support structure with attached equipment with a proposed new 15 metre lattice tower support structure carrying equipment transferred from the existing structure and the addition of new telecommunications antennas, dishes and associated equipment, together with new equipment cabinets, and all associated site works including temporary construction access

Inis Oírr , Eir Exchange Lands at Castle Village , (Inisheer) Island

242m
2661002CONDITIONAL17 Jun 2026

for construction of proposed ball wall and associated works

Inis Oírr , Oileáin Árann , Co. Galway

268m
2460324CONDITIONAL22 Mar 2024

chun leac urláir choincréite atá ann cheana a scartáil (achar urláir 72.36 m²), agus teach aon stór 158.61m² a thógail chomh maith le, Córas séarachais, Ait siothlaithe agus don obair agus seirbhisí eile atá bainteach

Inis Oirr , Baile An Chaisleain , Co. Na Gaillimhe

283m
2561678N/A14 Nov 2025

for the erection of a 15 m telecommunications structure supporting 4 no. receiving dishes, dual bay cabinet on concrete foundation, palisade fence with access gate, concrete plinth, white stone compound ground finish and all ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island to the mainland by radio link to connect to the NBI national fibre network as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed. A Natura Impact Statement (NIS) has been submitted with this application

Inis Oirr , (Inisheer) Island , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?