Proposed Development

to import inert soil material, and raise the levels of agricultural lands, for reclamation purposes

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Nov 2025

  2. Further information requested

    27 Jan 2026

  3. Further information received

    13 May 2026

  4. Decision: CONDITIONAL

    2 Jun 2026

  5. Decision due

    9 Jun 2026

  6. Grant issued

    7 Jul 2026

Application Details

Location
Knockdoemore , Lackagh , Co. Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
2.028 ha

Timeline

Registration Date
27 November 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 June 2026
Grant Date
7 July 2026
Permission Expires
6 July 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

156m
2460512CONDITIONAL7 May 2024

for: A) Construction of a community amenity walkway to the perimeter of GAA club grounds to cater for the club and community along with planted sensory garden with associated siteworks. B) Permission for the retention and completion of changes to site layout of training pitches granted under planning reference no. 19/1560. The proposed plan will involve revisions and re-orientation of pitches under construction on revised site boundaries to include all associated works and services. C. Permission for the retention of existing temporary internal access road and hardstand area to access new training pitches from existing club grounds car park to include resurfacing of this existing carparking area. D. Permission to construct 6 no 20m high floodlighting to pitch 1 with associated services. Gross floor space of proposed works: 58,800.00 sqm

Lackagh , Turloughmore , Athenry Co.Galway

176m
191560CONDITIONAL8 Oct 2019

for two new grass-based training pitches adjacent to existing pitch, to include all associated site development works

Knockdoemore ,

206m
21253CONDITIONAL26 Feb 2021

for the provision of new flood lighting to an average lux level of 520 on 8 no. 20m high columns to existing playing pitch to include all associated site development works. Gross floor space of proposed works: 8 sqm

KNOCKDOEMORE ,

235m
19364CONDITIONAL14 Mar 2019

to use the first floor of Turloughmore Social Centre for use as a preschool. Gross floor space of proposed works: 61.9 sqm

Knockdoemore ,

250m
18841CONDITIONAL21 Jun 2018

for the construction of a new synthetic turf all weather training area, along with hurling ball wall, fencing, ancillary flood lighting and all associated site development works. Gross floor space of proposed works 2200 sqm.

Lackagh ,

251m
2260370CONDITIONAL19 Apr 2022

Retirement of one No. 110 kV Poleset, and the installation of two No. 110 kV Polesets at relocated positions to accommodate 110 kV overhead line alteration. Development also to include upgrading of existing Training area to create an additional playing pitch along with Goal posts and ball catching nets at either end along with all associated site works at CLG Baile Chlair na Gaillimhe Grounds. Gross floor space of proposed works 11232 sqm.

Knockdoemore ,

296m
211314CONDITIONAL20 Jul 2021

of revisions to existing community amenity walkway as constructed along with minor revisions to shelters as constructed at the existing CLG Baile Chlair na Gaillimhe grounds as granted under 191461. Retention is also required for revisions to existing agricultural entrance on the R354, adjacent to the existing pedestrian entrance and all associated site works. Gross floor space of work to be retained is 141.1 sqm.

Knockdoemore ,

299m
191461CONDITIONAL19 Sept 2019

for proposed development which consists of a community amenity walkway, circa 1.3km long, with connectivity to existing amenity walkway and facilities throughout the existing CLG Baile Chlair na Gaillimhe grounds, to exit through proposed pedestrian access/entrance gate adjacent to an existing agricultural entrance on the R354, through Knockdoemore. To include rest bench & shelter at mid point of walkway. Development also consists of works to existing grounds to include: perimeter fencing to pitches, along with ball catching nets behind new goalposts to pitch no.3. A covered viewing shelter/rest area for spectators and walkers to pitches 1, 2 & 3 along with player dugouts adjacent to each. Public outdoor exercise area, adjacent to existing public walkway. Site lighting to remainder of existing walkway and all associated site works. Gross floor space of proposed works: 260 sqm

Knockdoemore ,

464m
17344CONDITIONAL15 Mar 2017

to construct a domestic garage and fuel store with all associated site works. (Gross floor space of proposed works: 60 sqm.)

Knockdoemore ,

472m
2460473CONDITIONAL26 Apr 2024

to construct single storey extensions to the existing dwelling. Gross floor space of proposed works: 38.30 sqm

Knockdoemore , Claregalway , galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?