← Back to search

Cill Éinne , Kilronan , Inis Mor Aran Islands

CONDITIONAL

Planning application 26169

Galway - Galway County Council

Proposed Development

of a storage building & charging station connected to the existing bike hire workshop

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Jul 2026

  2. Decision: CONDITIONAL

    26 Aug 2026

  3. Decision due

    27 Aug 2026

Application Details

Location
Cill Éinne , Kilronan , Inis Mor Aran Islands
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.0151 ha

Timeline

Registration Date
3 July 2026
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
26 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
24328N/A14 Nov 2024

of a covered storage area to the rear of the existing bike hire building (Pl Ref. No 18/94). Gross floor space of work to be retained: 86.56 sqm

Cill Éinne , Inis Mor , Aran Islands

18m
2542CONDITIONAL19 Mar 2025

of a covered storage area to the rear of the existing bike hire building pl. ref; (18/94). Gross floor space of work to be retained: 86.56 sqm

Cill Éinne , Inis Mór , Aran Islands

21m
181406CONDITIONAL5 Oct 2018

for alterations to a previously granted Planning Permission (Ref. No. 18/94) for the demolition of an existing commercial building (bike hire) and the construction of a new commercial building (bike hire). Alterations to consist of : construction of a basement store as part of the new building. Gross floor space of proposed works: 190 sqm. Gross floor space of any demolition: 57 sqm.

Kilronan ,

21m
17833N/A9 Jun 2017

for development to consist of demolition of an existing commercial building (bike hire) and construction of a new commercial building (bike hire) (gross floor space proposed 441sqm, demolition 57m2)

Kilronan ,

21m
1894CONDITIONAL2 Feb 2018

for a development to consist of: demolition of an existing commercial building (bike hire) and construction of a new commercial building (bike hire). Gross floor space of proposed works 141m2., demolition 57m2

Kilronan ,

209m
2660425N/A20 Mar 2026

and completion of works to an existing dwelling. The works comprise of a rear ground floor extension, along with re-building and re-alignment of the existing gable wall at first floor level and addition of 2 no. gable windows, along with all ancillary works

Cill Éinne , Lower Kilronan , Inishmore

263m
21456CONDITIONAL25 Mar 2021

erection of: 1. fuel store for use by the adjacent supermarket (previous planning permission granted Ref. No. 15/594. 2. The erection of an outside seating area consisting of two buildings and an open plan canopy structure. 3. the erection of a car parking facility including new bicycle stands. Gross floor space of the proposed works 158.88 sqm.

Killeany Kilronan ,

284m
20544CONDITIONAL5 May 2020

Cead le haghaidh innsealbhú 34 painéal fótavoltach gréine mar aon leis na hoibreacha a bhaineann leo ar an bhfoirgneamh ag Ionad Fiontair Chollm Ó hIaráin. Spás urláir comhlán na n-oibreacha beartaithe; 56.5sqm. Spás urláir comhlán na hoibre atá le coinneáil i 392 sqm.

Cill Rónáin , Inis Mór

291m
2560925N/A10 Jul 2025

of temporary storage container & Veranda for use as café with outdoor seating area and signage . Gross Floor Area of Works to be Retained: 33.00sqm

Cill Éinne , Kilronan Inis Mor Aran Islands , Co. Galway

294m
2461323CONDITIONAL9 Oct 2024

to erect domestic garage. A Natura Impact Statement will be submitted to the planning authority with the application. Gross floor space of proposed work: 59 sqm

Cill Einne Kilronan Lower , Kilronan Aran Islands , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?