← Back to search

Kilgarriff , Headford , Co. Galway

CONDITIONAL

Planning application 26198

Galway - Galway County Council

Proposed Development

to construct horse stables & farmyard manure pit

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Aug 2026

  2. Decision: CONDITIONAL

    30 Sept 2026

  3. Decision due

    1 Oct 2026

Application Details

Location
Kilgarriff , Headford , Co. Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
1.26 ha

Timeline

Registration Date
7 August 2026
Status
DECISION MADE
Decision
CONDITIONAL
Decision Date
30 September 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

17m
24371N/A20 Dec 2024

of an extension to an existing granny flat from that previously granted under planning ref no 07/120, to include all ancillary site development works. Gross floor space of work to be retained: 168 sqm(extension)

Kilgarrif , Headford , Co Galway

30m
2560656CONDITIONAL27 May 2025

for the 1. extension to previously approved granny flat (Planning Ref No 07/120) and waste water treatment system on a site with revised boundaries. 2. Permission for the change to same for use as a single dwelling house incl. all ancillary site development works. Gross floor space of work to be retained: 168.00 sqm

Kilgarrif , Headford , Co. Galway

50m
2574CONDITIONAL10 Apr 2025

of existing dwelling house on a site with revised boundaries from that previously granted under planning ref. 07/120, and permission for supply and fit upgraded waste water treatment system with percolation area to include all ancillary site development works

Kilgarrif , Headford , Co Galway

138m
17904CONDITIONAL20 Jun 2017

for the relocation of an effluent treatment system and percolation area.

Mausrevagh ,

151m
171189CONDITIONAL4 Aug 2017

to 1. Demolish Existing Dwelling house, 2. Construct a New Dwelling House, 3. Retain new site Entrance, 4. Retain Relocation of Effluent Treatment System and Percolation Area submitted under planning application Ref: 17/904 and 5. All associated site works. Gross floor space of proposed works 247sqm, Gross floor space of any demolition 97.95sqm.

Mausrevagh ,

205m
18151CONDITIONAL13 Feb 2018

to construct a private dwelling house, proprietary effluent treatment system, percolation area and domestic garage along with all associated services. Gross floor space of proposed works 248.56 sqm.

Luimnagh West Td. ,

213m
171673CONDITIONAL21 Nov 2017

to construct a private dwelling house, proprietary effluent treatment system, percolation area and domestic garage along with all associated services. Gross floor space of proposed works Dwelling 216sqm, Garage 32.56sqm.

Luimnagh West Td ,

247m
19908CONDITIONAL14 Jun 2019

of a farm entrance and service road necessitated by the closure of existing facilities in conjunction with the upgrading of the N84 national secondary road

Mausrevagh ,

487m
201754CONDITIONAL19 Nov 2020

to construct a fully serviced dwelling house, garage and a treatment plant system. Permission is also sought to relocate relevant front boundaries walls so that the required sight lines can be obtained. Gross floor space of proposed works: 168 msq (house) & 63 sqm (garage)

Mausrevagh ,

487m
201386N/A24 Sept 2020

to construct a fully serviced dwelling house, garage and a treatment plant system. Permission is also sought to relocate relevant front boundaries walls so that the required sight lines can be obtained. Gross floor space of proposed works: 168 sqm - House, 63 sqm - Garage

Mausrevagh ,

The submission window has closed

A decision issued on this application, so observations can no longer be made. Anyone who made a submission during the five-week window can appeal to An Coimisiún Pleanála within four weeks of the decision — until Wednesday 28 October 2026 — for a fee of €220.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?