Aloonbaun , Ballymacward , Ballinasloe Co. Galway
N/APlanning application 2661478
Galway - Galway County Council
Proposed Development
for demolition of an existing gym building and construction of a new gym building. The works also include a new wastewater treatment system and a percolation area.
Application Timeline
Application received
28 Aug 2026
Decision due (upcoming)
22 Oct 2026
Application Details
- Location
- Aloonbaun , Ballymacward , Ballinasloe Co. Galway
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.25 ha
Timeline
- Registration Date
- 28 August 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 22 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for a footpath internally along the periphery of the Club Grounds.
Alloon ,
to install floodlights, a 5m high hurling wall, 427.50 sqm. astro turf pitch and fencing
Alloon ,
to install a Ball Stop Net 12m high and 23.6m long.
Alloonbaun ,
for a sheep shed and ancillary concrete work. Gross floor space of proposed works 304sqm.
Alloonbaun Td ,
to construct a new dwelling house , effluent treatment system, garage and all associated site works. Gross floor space of proposed works, dwelling 249sqm, garage, 55sqm.
Alloon Lower ,
to construct a canopy to provide shelter above classroom entrance/exits, and to erect the school name on the external west-facing wall (gross floor space 138sqm)
Alloonbaun ,
to extend existing car parking area to include all associated signs and works (Gross floor space 272.25sqm). Previous Planning Ref: 13/780
Alloon Baun , Ballymacward , Ballinasloe
to change existing carparking facilities at the front of the school to include 1. Separate designated drop off and pick up areas for school buses and cars, 2. Visitor and teacher parking, 3. Construction of a wall to separate drop off and pick up area from the main road, 4. Construction of a new front boundary wall, 5. Construction of a new footpath, lighting and all associated site works. Gross floor space of proposed works: 1015 sqm
Alloonbaun ,
consisting of a three-bedroom dwelling, comprising of a kitchen & dining room, living room, playroom, bathroom, home office and utility/ storage areas, closure of existing agricultural entrance, new site entrance from road, new waste water treatment system, domestic garage and ancillary works. Gross floor space of proposed works: House - 266 sqm, Garage - 61 sqm
Alloonbaun ,
of dwelling house, domestic garage / fuel store all services and all associated site works on revised site boundaries. Gross floor of space of work to be retained: 206.93 sqm (House = 155.26 sqm. Garage = 51.67 sqm)
Alloon Lower ,
The submission window has closed
Observations on this application closed on Thursday 1 October 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?