← Back to search

THE WOOD (NO 3 BARR NA COILLE) , DINGLE , CO KERRY

N/A

Planning application 2062

Kerry - Kerry County Council

Proposed Development

RETAIN AND COMPLETE GROUND FLOOR ENTRANCE HALL AND THE CONVERSION OF ATTIC SPACE IN AN EXISTING DWELLING HOUSE TO LIVING ACCOMMODATION

View the full application file on the council's planning portal →

Application Details

Location
THE WOOD (NO 3 BARR NA COILLE) , DINGLE , CO KERRY
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kerry County Council
Site Area
0.138 ha

Timeline

Registration Date
28 January 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20219REFUSED9 Mar 2020

RETENTION AND COMPLETION OF A GROUND FLOOR ENTRANCE HALL AND THE CONVERSION AND EXTENSION OF AN ATTIC SPACE IN AN EXISTING DWELLING HOUSE TO LIVING ACCOMODATION

NO3. BARR NA COILLE , THE WOOD , DINGLE

1m
17290CONDITIONAL3 Apr 2017

CONVERT ATTIC SPACE IN AN EXISTING DWELLING HOUSE TO LIVING ACCOMMODATION SERVED BY A DORMER WINDOW ALSO TO INCLUDE FOR 2 NUMBER ROOF LIGHTS SERVING A GROUND FLOOR HALL AREA

THE WOOD (NO 3 BARR NA COILLE) , DINGLE , CO KERRY

78m
2560431N/A23 May 2025

Retention permission to ( a) retain an as constructed dwelling house with public sewer connection and all associated ancillary site works and (b) retain existing dwelling within revised boundaries

No. 1 Barr Na Coille , The Wood , Dingle

78m
2560469CONDITIONAL3 Jun 2025

Retention permission to ( a) retain an as constructed dwelling house with public sewer connection and all associated ancillary site works and (b) retain existing dwelling within revised boundaries

No. 1 Barr Na Coille , The Wood , Dingle

91m
21932CONDITIONAL13 Aug 2021

(A) RETAIN AS CONSTRUCTED DWELLING HOUSE WITH PUBLIC SEWER CONNECTION AND ALL ASSOCIATED ANCILLRY SERVICES AND (B) RETAIN DWELLING HOUSE WITHIN REVISED SITE BOUNDARIES

NO. 11 BARR NA COILE , THE WOOD , DINGLE

163m
20699CONDITIONAL5 Aug 2020

1. CONSTRUCT FIVE NO, TWO BEDROOM DWELLING HOUSES, TWENTY TWO NO. THREE BEDROOM DWELLING HOUSES, FOUR NO. FOUR BEDROOM DWELLING HOUSES, TWO NO. TWO BEDROOM APARTMENTS AND TEN NO. ONE BEDROOM APARTMENTS TO BE COMPRISED OF ONE TWO STOREY TERRACE CONTAINING SEVEN DWELLINGS, TWENTY- FOUR TWO STOREY SEMI- DETACHED DWELLINGS AND THREE TWO STOREY APARTMENT BUILDINGS. 2. ASSOCIATED SITE DEVELOPMENT AND SERVICE WORKS INCLUDING SITE ENTRANCE WORKS, PEDESTRIAN ACCESS WORKS, SERVICE ROADWAYS, FOOTPATHS, PARKING AREAS, LIGHTING, LANDSCAPING, ANCILLARY WORKS AND CONNECTION TO PUBLIC SEWER

THE WOOD , DINGLE , CO KERRY

168m
19195CONDITIONAL27 Feb 2019

(CHUN SINEADH AON STOR, OIBREACHA SUIMH AR FAD SAN AIREAMH, A CHUR LE AONAD 5 & 6) (CONSTRUCT A SINGLE STOREY EXTENSION AND ASSOCIATED SITE WORKS AT UNITS 5 AND 6)

PAIRC GNO NA COILLE , AN CHOILL (THE WOOD) , DAINGEAN UI CHUIS

198m
2460062CONDITIONAL2 Feb 2024

(a) demolition of (i) single storey element to side (west), (ii) 2 no. bay windows, including gable wall over one, to front and (iii) concrete barges to roof, (b) blocking up existing door/window opes to side (east), (c) removal of stone cladding to front and sides, (d) alteration to window ope to front, (e) construction of single storey extensions to front and side (west), (f) conversion of attic comprising addition of 7 new roof lights to front and 2 new roof lights to rear and (g) all associated site works

8 Radharc na Mara , An Choill Daingean Uí Chúis , Co. Ciarraí

199m
25173CONDITIONAL30 Jun 2025

(A) DEMOLISH (I) A 2-STOREY SIDE AND REAR STRUCTURE AND (II) A FRONT ENTRANCE PORCH, BOTH SERVING AN EXISTING GUEST HOUSE, (B) CONSTRUCT A 2-STOREY EXTENSION WRAPPING AROUND THE EXISTING BUILDING, CONSISTING OF 12 ENSUITE BEDROOMS, NEW LIVING AND DINING AREAS AND A NEW MAIN PUBLIC ENTRANCE LOBBY AND OTHER ASSOCIATED AREAS (C) CONSTRUCT A NEW BAY WINDOW SERVING AN EXISTING LOUNGE ON THE GROUND FLOOR (D) MAKE ELEVATIONAL ALTERATIONS TO THE EXISTING TO ALLOW FOR THE ABOVE AND (E) REDESIGN THE EXISTING PARKING ARRANGEMENTS TO ALLOW FOR FURTHER PARKING CAPACITY, ALSO TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS

LIGHT HOUSE GUEST HOUSE , BALLYNAHOOLY , DINGLE

215m
24310CONDITIONAL22 Jul 2024

CONSTRUCT A SPLIT LEVEL STOREY AND A HALF DWELLING HOUSE SERVED BY A WASTEWATER TREATMENT UNIT DISCHARGING TO A SAND POLISHING FILTER, ALL ASSOCIATED SITE WORKS

BALLYNABOOLY , DINGLE , CO KERRY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?