Proposed Development
CHANGE OF USE FROM DWELLING HOUSE TO HOLIDAY HOME FOR SHORT TERM LETTING
View the full application file on the council's planning portal →Application Timeline
Application received
13 Jan 2022
Decision due
9 Mar 2022
Decision: REFUSED
9 Mar 2022
Appeal submitted
1 Apr 2022
Appeal decided: REFUSED
7 Jul 2023
Application Details
- Location
- 11 MARIAN PARK , DINGLE , CO KERRY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.03 ha
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 13 January 2022
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 9 March 2022
An Coimisiún Pleanála Appeal
- Appeal Reference
- 313199-22
- Decision
- REFUSED
- Submitted
- 1 April 2022
- Decided
- 7 July 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(A) ALTER AND EXTEND THE DWELLING HOUSE (B) CONSTRUCT A NEW SHED, BOILER HOUSE AND WOOD STORE INCLUDING CARRYING OUT ALL NECESSARY SITE WORKS
17 MARION PARK , DINGLE , CO KERRY
(A) ALTER AND EXTEND THE DWELLING HOUSE AND (B) CONSTRUCT A NEW SHED, BOILER HOUSE AND WOOD STORE INCLUDING CARRYING OUT ALL NECESSARY SITE WORKS
17 MARION PARK , DINGLE , CO KERRY
RETAIN (A) A TWO STOREY REAR EXTENSION, AND ATTIC CONVERSION AS CONSTRUCTED TO AN EXISTING DWELLING AND (B) RETENTION PERMISSION TO RETAIN A DETACHED STORAGE SHED AS CONSTRUCTED SERVING THE EXISTING DWELLING HOUSE
25 MARIAN PARK , DINGLE , CO KERRY
(A) CONSTRUCT A TWO STOREY STYLE DWELLING, (B) MAKE A CONNECTION TO THE PUBLIC SEWER AND (C) ALL ANCILLARY SITE WORKS ALL
JOHN STREET , DINGLE , CO KERRY
CEAD PLEANÁLA CHOIMEAD LE HAGHAIDH IONAD STÓRÁLA AON STÓR DO THREALAMH IMREOIRÍ ATÁ THÓGÁIL IN AICE AN SEASTÁN POIBLÍ AGUS (B) CEAD PLEANÁLA CHUN IONAD TRAENÁLA (GYM) A THÓGÁIL DO BHAILL AN CHLUB AMHÁIN. AR SON ÁR GCLIANT CUMANN LÚTHCHLEAS GAEL DAINGEAN UÍ CHÚIS. AG ; PÁIRC AN ÁGHASAIGH BÓTHAIR AN PHOIST, FARRAN DAINGEAN UÍ CHÚIS.(A) RETENTION PERMISSION FOR AS CONSTRUCTED SINGLE STOREY DETACHED KIT STORE ADJACENT TO PUBLIC STAND, AND (B) FULL PERMISSION TO ERECT A DETACHED STRUCTURE TO SERVE AS A TRAINING FACILITY (GYM) FOR MEMBERS ONLY.
PÁIRC AN ÁGHASAIGH , BÓTHAIR AN PHOIST FARRAN , DAINGEAN UÍ CHÚIS
Proposals include the demolition of the existing single storey flat roofed club house (213 SM) & the construction of a new Club House to replace same which will include to the eastern side of the entrance 4 no. dressing rooms, referee, physio, storage & plant rooms and to the western side of the entrance facilities including 2 no. community rooms, meeting room, office & toilet facilities. This structure will be single storey with an 'A' type roof, The overall floor area is 700 Sq. Meters with a ridge height of 6.9 meters, This building will be located along the same orientation of the existing dressing rooms. The existing boundary wall & gated entrance to Bóthair An Phoise & Bóthar na bPiarsach ( Dingle Relief Road ) is to be altered including the lowering of same with a view to opening up Páirc An Ághasaigh and the associated facilities. The goals & ball netting adjacent to the location of the club house will be revised to allow for proposed works. The existing Training Facilities to the N/W of the site will be realigned to provide better usage of this space and are to include flood lighting. A 3G area will also be created in this area, to facilitate winter training, which will be enclosed with metal fencing and flood light. To the rear of same there will be a drills area and ball wall. Spectator facilities will be improved through the creation of a standing terrace area to the eastern side of the Main Pitch. A single-storey structure is proposed adjacent to the Training Area which will include additional machinery storage facilities as well as accessible toilet facilities and kit storage (140SM) in this location. All services including Mains Water & Public Sewer connections are available at present and will serve the proposed new Club House and Toilet Facilities adjacent to Training Area. Vehicular access to Páirc An Ághasaigh for maintenance purposed will be via a ROW through Secret Heart University (SHU) grounds to the N/W of the site adjacent to Drills Area. The existing stone carving celebrating Tomás Ághas will be incorporated into new entrance lobby. Signage identifying the facility will be as presented in drawings submitted and all other signage notices will be in Irish. The proposed flood lighting to both training pitch & 3 G area has been designed by lighting specialist to provide the required lighting standards for training and playing football whilst ensuring the minimal overspill to adjoining properties from an energy efficient system.
Páirc An Aghasaigh Farran , Bóthair An Phoist Daingean Uí Chúis , Contae Chiarrai.
ERECT A DETACHED STRUCTURE TO SERVE AS A TRAINING FACILITY (GYM) FOR MEMBERS ONLY
FARRAN , DAINGEAN UI CHUIS
(A) CEAD COIMÉAD A LORG CHUN NA LÍONTA LIATHRÓIDE AR CHÚL DHÁ BHÁIDE AGUS CUAILLÍ BÁIRE GAOLMHARA SAN AN ÁIT TRAENÁLA AGUS AN ÁIT TRAENÁLA A COIMÉAD AGUS (B) INA THEANNTA SIN, IS MIAN LINN CEAD IOMLAN PLEANÁLA A LORG CHUN ATHAILÍNIÚ AR AN ÁIT TRAENÁLA A DHÉANAMH, CUAILLÍ BÁIRE A THÓGAINT, UASGHRÁDÚ AN CÓRAS TUILSOILSIÚ SAN ÁIT TRAENÁLA, ATHLONNÚ A DHÉANAMH AR 6 CINN DE CHRAINN SOILSITHE TUILE 12 MÉADAR AR AIRED, 6 CINN DE CHRAINN SOILSITHE TUILE NUA 15 MÉADAR AR AIRDE A THÓGAINT, AGUS IAD GO LÉIR LE OIBREACHA COIMHDEACHA LÁTHREÁIN (A) RETAIN EXISTING REALIGNMENT OF TRAINING AREA, ASSOCIATED GOAL POSTS AND PROTECTIVE BALL NETTING TO SAME, (B) FULL PERMISSION TO COMPLETE TRAINING AREA REALIGNMENT INCLUDING THE ERECTION OF GOAL POSTS AND THE UPGRADING OF FLOODLIGHING SYSTEM IN TRAINING AREA, INCLUDING THE RELOCATION OF EXISTING 6 NO. 12 METER HIGH FLOODLIGHTING MASTS AND TO ERECT 6 NO. NEW 15 METER HIGH FLOODLIGHTING MASTS ALL WITH ASSOCIATED ANCILLARY SITE WORKS
PÁIRC AN ÁGHASAIGH BÓTHAIR AN PHOIST , FARRAN , DAINGEAN UÍ CHÚIS
(A) DEMOLISH AN OUTHOUSE AND FLAT ROOF EXTENSION SERVING AN EXISTING DWELLING HOUSE AND (B) RENOVATE AND EXTEND AN EXISTING DWELLING HOUSE TO INCLUDE THE CONSTRUCTION OF A 2 STOREY REAR EXTENSION, REVISE THE INTERNAL FLOOR PLAN LAYOUTS AND REVISE THE PROFILE/HEIGHT OF THE EXISTING ROOF STRUCTURE AS A RESULT ALO REVISE FIRST FLOOR WINDOWS AND EXTRNAL WALL FRONTING ONT JOHN STREET, AND ALSO ALL ASSOCIATED SITE WORKS
JOHN STREET , DINGLE , CO KERRY
CONSTRUCT A TERRACED DWELLING HOUSE AND ALL ASSOCIATED ANCILLARY SITE WORKS AND SERVICES
JOHN STREET , GORTONORA , DINGLE
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?