Proposed Development
Outline planning permission to construct a dwelling house with all associated ancillary works/services and access via existing service road
View the full application file on the council's planning portal →Application Timeline
Application received
21 Aug 2023
Application withdrawn
10 Oct 2023
Application Details
- Location
- An Sean Mhuileann , The Commons of Milltown , Dingle
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.035 ha
Timeline
- Registration Date
- 21 August 2023
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 10 October 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
TO (1) RETAIN 5 NO. AS CONSTRUCTED DETATCHED DWELLING HOUSES ON SITE NOS. 1, 2, 5, 6, AND 7 AND 4 NO. AS CONSTRUCTED SEMI-DETATCHED DWELLING HOUSES ON SITE NOS. 3, 4, 8 AND 9 (2) RETAIN GARDEN SHEDS TO SITE NOS. 4, 8 AND 9 (3) RETAIN AND COMPLETE EXISTING FOOTPATHS AND SERVICE ROAD SERVING THE HOUSING ESTATE AND ALL ASSOCIATED ANCILLARY SITE WORKS/SERVICES AND (4) RETAIN ALL BUILDINGS, GREEN AREAS, SERVICE ROAD, FOOTPATHS AND ALL ASSOCIATED ANCILLARY WORKS/SERVICES WITHIN REVISED SITE BOUNDARIES (B) FULL PERMISSION TO CONSTRUCT GARDEN SHEDS TO THE REAR OF DWELLING HOUSE ON SITE NOS. 1,2,3,5,6 AND 7
AN SEAN MHUILEANN , THE COMMONS OF MILLTOWN , DINGLE
(A) RETAIN AS CONSTRUCED DOMESTIC GARAGE (B) RETAIN ALL BUILDINGS WITHIN REVISED BOUNDARIES AND (C) FULL PERMISSION TO CONSTRUCT AN EXTENSION TO EXISTING DWELLING HOUSE
COMMONS OF MILLTOWN , DINGLE , CO KERRY
CHUN 400M2 (50.6WP) DE PHAINEIL GREINE A CHUR IN AIRDE AT FHRAMAI MIONTAL AR AN DTALAMH AGUS NA HOIBREACHA A BHAINEANN LEO . (CONSTRUCT 400M2 (50.6KWP) OF GROUND SOLAR PANELS ON METAL FRAMES AND ALL ASSOCIATED WORKS)
BAILE AN MHUILINN , DAINGEAN UI CHUIS , CO CHIARRAI V92TX48
RETAIN AS CONSTRUCTED DWELLING HOUSE AND SHED SERVED BY A SEPTIC TANK AND PERCOLATION AREA WITH ALL ASSOCIATED ANCILLARY SERVICES/SITE WORKS, AND (B) FULL PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK SYSTEM AND INSTALL A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED ANCILLARY SERVICES/SITE WORKS
BALLYNABOOLY , DINGLE , CO KERRY
RETAIN (1) AS CONSTRUCTED DWELLING HOUSE AND GARAGE WITH PUBLIC SEWER CONNECTION AND (2) ALL BUILDINGS WITHIN REVISED SITE BOUNDARIES
COMMONS OF MILLTOWN AND FARRANREDMOND , DINGLE , CO KERRY
RETAIN AN EXISTING GUESTHOUSE WITHIN REVISED SITE BOUNDARIES AND PERMISSION TO CHANGE THE USE OF AREAS WITHIN THE GUESTHOUSE ON SITE FROM PRIVATE DOMESTIC USE TO A BUILDING OF COMMERCIAL USE IN ITS ENTIRETY AND (B) CONSTRUCT A STOREY AND A HALF DWELLING HOUSE WHICH WILL BE CONNECTED TO PUBLIC SERVICES AND INCLUDE ALL ASSOCIATED SITE WORKS
FARRANREDMOND , DINGLE , CO KERRY
1. CONSTRUCT FIVE NO, TWO BEDROOM DWELLING HOUSES, TWENTY TWO NO. THREE BEDROOM DWELLING HOUSES, FOUR NO. FOUR BEDROOM DWELLING HOUSES, TWO NO. TWO BEDROOM APARTMENTS AND TEN NO. ONE BEDROOM APARTMENTS TO BE COMPRISED OF ONE TWO STOREY TERRACE CONTAINING SEVEN DWELLINGS, TWENTY- FOUR TWO STOREY SEMI- DETACHED DWELLINGS AND THREE TWO STOREY APARTMENT BUILDINGS. 2. ASSOCIATED SITE DEVELOPMENT AND SERVICE WORKS INCLUDING SITE ENTRANCE WORKS, PEDESTRIAN ACCESS WORKS, SERVICE ROADWAYS, FOOTPATHS, PARKING AREAS, LIGHTING, LANDSCAPING, ANCILLARY WORKS AND CONNECTION TO PUBLIC SEWER
THE WOOD , DINGLE , CO KERRY
Retention permission to ( a) retain an as constructed dwelling house with public sewer connection and all associated ancillary site works and (b) retain existing dwelling within revised boundaries
No. 1 Barr Na Coille , The Wood , Dingle
Retention permission to ( a) retain an as constructed dwelling house with public sewer connection and all associated ancillary site works and (b) retain existing dwelling within revised boundaries
No. 1 Barr Na Coille , The Wood , Dingle
(1) Retain installed first floor area in Distillery Production Building 183m2 consisting of: staff kitchen 12.7m2, shop with tasting bar 26.9m2; visitor area 143.4m2 (2) Visitor Centre use on site and Planning Permission for (1) Partial demolition of single storey projecting elements on south side (103 sq.m.) (2) Upgrade / replacement of external cladding (including reconfiguration of openings) (3) Internal layout modifications (4) Additional 323 sq.m. at upper level (including visitor use) (5) Change of use of 59 sq.m. of lower level production area to retail (6) Change of use of 12m2 of lower level production area to open office area (7) Change of use from permitted storage (Upper Shed) 412m2 to proposed industrial use (Distilling and ancillary storage) (8) New retail area at lower level 142m2 (9) Two new (8.8m high) freestanding steel grain storage silos to front (10) Connection of sewage system to mains (to replace septic tanks) (11) Landscaping (12) Bicycle, car and bus parking provision on site and all associated site ancillary works
The Dingle Distillery Old Mill , Milltown Co. Kerry V92 E7YD , (also drainage connection at Ballyhea Road Commons of Milltown Dingle Co. Kerry)
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?