Proposed Development
Full planning permission to
- A)demolish existing rear/side extension
- B)construct new side extension onto the existing dwelling house
- C)construct a new first floor dormer window to existing dwelling house
- D)elevation changes & internal alterations to existing dwelling house
- E)decommission existing septic tank and install a septic tank & percolation area and all associated site works. Height = 6.258m
Application Timeline
Application received
21 Dec 2023
Decision due
23 Feb 2024
Decision: CONDITIONAL
23 Feb 2024
Grant issued
28 Mar 2024
Application Details
- Location
- Lisroe , Duagh , Co. Kerry
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.44 ha
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 21 December 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 February 2024
- Grant Date
- 28 March 2024
- Permission Expires
- 27 March 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
RETAIN FRONT PORCH TO DWELLING HOUSE
LISROE , DUAGH , LISTOWEL
RETAIN FRONT PORCH TO DWELLING HOUSE
LISROE , DUAGH , LISTOWEL
RETAIN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE ( PREVIOUSLY GRANTED UNDER LOCAL AUTHORITY REF NO 11/843) TOGETHER WITH ASSOCIATED GROUND EQUIPMENT CABINETS WITHIN A FENCED COMPOUND AND ACCESS TRACK
LISROE , DUAGH , CO KERRY
Invalid: retention permission to domestic garage
lisroe , duagh , listowel
retention permission to retain domestic garage
lisroe , duagh , listowel
We, Circal Trienearagh Solar Limited, intend to apply for permission for development on lands in the townlands of Ballygarret, Gortanimerisk, Knockaderren, Knockavallig, Knockundervaul, Lacka West, Lisroe, Toor and Trienearagh, near Listowel, Co. Kerry (the Proposed Development) which comprises a renewable energy development as defined by The European Union (Planning and Development) (Renewable Energy) Regulations 2025. The Proposed Development comprises the following: I. Construction and operation of up to 576,850 sqm of solar PV arrays on ground-mounted metal frames, with a maximum overall height of up to 2.79 metres. II. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor / transformer skid units. III. Up to 23 no. electrical inverter / transformer skid units. IV. Construction and operational access to the site by 16 no. site entrances using 14 no. existing field access points and 2 no. new access points. V. 7 no. temporary construction compounds and ancillary facilities for the duration of the construction phase of the project. VI. Construction of a 110kV / 33 kV transformer compound including an IPP Control Module of 33 sqm, a MV Switchgear Module of 33 sqm, all associated electrical plant and apparatus, 2 no c.18m lightning masts, lighting columns, fencing, parking, wastewater holding tank, rainwater harvesting unit, 33kV underground cabling, and a 110kV under the fence cable connection to the existing Trien 110 kV Substation. VII. 33 kV collector cable network, joint bays and associated works. VIII. Internal access tracks, site landscaping and drainage works, security fencing, CCTV and all associated ancillary site development works. IX. The decommissioning and reinstatement of the solar farm at the end of its operational life, including proposed transformer compound. The application seeks a 10-year permission with an operational lifetime of 40 years from the date of commissioning of the entire solar farm is being sought. A Natura Impact Statement (NIS) has been prepared in respect of the construction, operation and decommissioning of the Proposed Development and accompanies the planning application. Refer to enclosed statutory notices for full development description.
In the townlands of , Ballygarret Gortanimerisk Knockaderren Knockavallig Knockundervaul Lacka West Lisroe Toor and Trienearagh , near Listowel Co. Kerry
Planning Permission to (i) Demolish existing open slurry pit and cubicles (ii) Construct a new slatted livestock house. Proposed slatted house to incorporate easy feed & associated underground slurry tank with external agitation & ancillary external concrete. The above to be carried out with all associated ancillary site works
Lacka West , Duagh , Co. Kerry
RETAIN TWO NO AGRICULTURAL FARM ENTRANCES AND GATES
LACKA WEST , DUAGH , CO KERRY
CONSTRUCT A SINGLE STOREY DOMESTIC DWELLING HOUSE AND ALL ANCILLARY SITE WORKS AND TO INSTALL A MECHANICAL WASTEWATER TREATMENT PUMPED UNIT AND SOIL POLISHING FILTER
LISROE , DUAGH , CO.KERRY
(1) CONSTRUCT A 3 BAY SLATTED HOUSE WITH AN UNDERGROUND TANK INCORPORATING 1 SOLID BAY FOR BEDDING WEANLINGS. ANCILLARY CONCRETE FARM YARD 19.2M X 6M AT FRONT, ON HIS LAND
KNOCKUNDERVAL , DUAGH , CO KERRY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?