Proposed Development
CONSTRUCT 2 NUMBER, STOREY AND A HALF DWELLING HOUSES, SERVED BY A JOINT VEHICULAR ENTRANCE AND BOTH TO BE CONNECTED TO PUBLIC SERVICES AND ALSO TO INCLUUDE ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
30 Jun 2025
Further information requested
19 Aug 2025
Further information received
5 Dec 2025
Decision: REFUSED
9 Jan 2026
Decision due
10 Jan 2026
Application Details
- Location
- PORT ROAD , INCH/COLEGREAN , KILLARNEY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
Timeline
- Registration Date
- 30 June 2025
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 9 January 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCT A 3 STOREY APARTMENT BLOCK CONSISTING OF 10 NUMBER UNITS, SERVED BY ASSOCIATED CAR AND BICYCLE PARKING, AND AN EXTERNAL WASTE BIN AMENITY ENCLOSURE, THE UNITS TO BE CONNECTED TO PUBLIC SERVICES AND ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS
PORT ROAD , INCH/COOLLEGREAN , KILLARNEY
Permission for the following works, (1) Change design of 8 nr dwelling houses from that previously granted on Planning Ref 23/305, on sites Nr 2 – Nr 9, all in accordance with plans and particulars submitted
Port Rd , Dereen Coollegrean , Killarney Co Kerry
CONSTRUCT 9 DWELLING HOUSES WITH ALL ASSOCIATED SITE WORKS. AN NIS HAS BEEN SUBMITTED WITH THIS APPLICATION
PORT ROAD , DEREEN , COOLLEGREAN
(1) CONSTRUCT EXTENSION TO EXISTING SHED/STORE FOR USE AS A HOME GYM/HOME OFFICE, ALL IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED
NO. 5 PORT COTTAGES , PORT ROAD INCH , KILLARNEY CO KERRY
Permission for the following works, (1) Change design of dwelling houses previously granted on Planning Ref 23/305 on sites Nr 1 – Nr 9 from 3 storey dwelling houses to 2 storey dwelling houses, all in accordance with plans and particulars submitted
Port Rd , Dereen Coollegrean , Killarney
Retention Permission for the following works, (1) Retention Permission to retain dwelling house as constructed to date with the design changed from that previously granted on Planning Ref 23/305 on site Nr 1, all in accordance with plans and particulars submitted
Port Rd , Dereen Coollegrean , Killarney Co Kerry
FOR PHASE 1 OF THE PORT ROAD DEVELOPMENT, MORE PARTICULARLY TO CONSTRUCT 120( DWELLING HOUSES, , 76 SEMI-DETACHED UNITS, 44 TERRACED UNITS C/W ROADS, SERVICES AND ANCILLARY SITE WORKS, (THIS PLANNING APPLICATION REPLACES THE CURRENT PLANNING PERMISSIONS PLANNING REF. 07/294845, REF. 08/294908, 08/294935 AND 08/294929 WHICH PERMIT THE CONSTRUCTION OF 117 DWELLINGS AND A MEDICAL CENTER)
PORT ROAD , INCH / COOLLEGREAN , KILLARNEY
The construction of a residential development of: 224 no. residential units with ancillary two storey crèche, landscaping, road improvements, pedestrian / cycleways, storm water upgrades and associated site development works. The proposed development makes provision for 76 houses comprising of 8 no. 2-storey 2-bedroom townhouses, 28 no. 2-storey 3-bedroom townhouses, 10 no. 2-storey 3-bedroom semi-detached units and 30 no. 2-storey 4-bedroom semi-detached units. The proposed development includes 148 no. apartments / duplexes to be provided as follows: Block 1 (4 no. 2-bedroom & 4 no. 3-bedroom over 3 storeys), Block 2 (2 no. 2-bedroom & 2 no. 3-bedroom over 3-storeys), Block 3 (4 no. 1-bedroom, 10 no. 2-bedroom and 6 no. 3-bedroom over 3-storeys), Block 4 (10 no. 1-bedroom & 10 no. 2-bedroom over 3-storeys), Block J (32 no. 2-bedroom over 4 storeys), Block K (16 no. 1-bedroom apartments & 16 no. 2-bedroom apartments over 4 storeys) Block L (32 no. 2-bedroom apartments over 4 storeys). The proposed development will provide for a new vehicular access and pedestrian entrances onto Port Road, upgrades to Port Road comprising reduction in carriageway widths, provision of shared pedestrian/cycle path and uncontrolled pedestrian crossing, and a pedestrian connection to Millwood Estate. It is proposed to upgrade the stormwater network on St. Margaret’s Road (approximately 140 metres north of the main development site) to support the development. Ancillary infrastructure development works will include relocation/undergrounding of ESB powerlines, wastewater infrastructure including foul pumping station, surface water attenuation, water utility services, public lighting, bin stores, bicycle stores, ESB substations, and all associated site development works. A Natura Impact Statement has been prepared in respect of the proposed development.
Port Road and St Margaret’s Road , Coollegrean Inch Knockreer Ardnamweely Derreen (townlands) , Killarney Co. Kerry.
CONSTRUCT A NEW DRIVEWAY LEADING TO HOUSE NUMBER 19
DERREEN , COOLLEGREAN , KILLARNEY
(A)PERMISSION TO RETAIN HOUSING DEVELOPMENT AS CONSTRUCTED, ALL WITHIN REVISED SITE BOUNDARIES (B) PERMISSION TO ALTER AND CONSTRUCT NEW BOUNDARIES AROUND HOUSE NUMBERS 5 AND 8, AND ALL SITE DEVELOPMENT WORKS
PORT ROAD , DEREEN , COOLLEGREAN