← Back to search

Ballydonohoe , Lisselton , Co. Kerry

N/A

Planning application 2660930

Kerry - Kerry County Council

Proposed Development

permission to build a house and to install a Secondary Treatment System and soil polishing filter along with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Sept 2026

  2. Decision due (upcoming)

    22 Nov 2026

Application Details

Location
Ballydonohoe , Lisselton , Co. Kerry
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.22 ha

Timeline

Registration Date
28 September 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
22 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

96m
211223CONDITIONAL27 Oct 2021

CONSTRUCT STOREY AND A HALF DWELLING HOUSE AND ALL ASSOCATED SITE WORKS AND PERMISSION TO INSTALL A TRICEL WASTEWATER PUMPED UNIT AND A SANDCEL TERTIARY TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS

GLOURIA AND BALLYDONOHOE , LISSELTON , LISOTWEL

101m
20793CONDITIONAL2 Sept 2020

CONSTRUCT A DWELLING AND DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS AND PERMISSION TO INSTALL A TRICEL WASTEWATER PUMPED UNIT AND A SANDCEL TERTIARY TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS

BALLYDONOHOE , LISSELTON , LISTOWEL

442m
19707CONDITIONAL5 Jul 2019

CONSTRUCT A NEW SILAGE BASE, ONE SILAGE WALL AND APRON COMPLETE WITH EFFLUENT CHANNELS, A SLATTED SLURRY TANK ALL ASSOCIATED SITE WORKS

GLOURIA , LISSELTON , LISTOWEL

443m
22417CONDITIONAL20 Apr 2022

RETAIN SILAGE BASE, WALL, APRON AND ANCILLARY CONCRETE AS IT IS BUILT

GLOURIA , LISSELTON , LISTOWEL

583m
21457REFUSED28 Apr 2021

CONSTRUCT A SOLAR FARM WHICH WILL CONNECT TO THE NATIONAL GRID ON LANDS WITH A TOTAL AREA OF CIRCA 84 HECTARES, CONSISTING OF SOLAR PANELS ON GROUND MOUNTED FRAMES, 19 NO. SINGLE STOREY ELECTRICAL INVERTER/TRANSFORMER STATIONS (1 NO. TO INCLUDE CUSTOMER SWITCH GEAR) AND ASSOCIATED SPARE EQUIPMENT CONTAINER, UNDERGROUND AND OVERGROUND CABLING, SECURITY FENCING, CCTV, ACCESS TRACKS, TEMPORARY CONSTRUCTION COMPOUND, LANDSCAPING, AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS AT THE FOLLOWING TOWNALNDS OF BALLYDONOHUE, GLOURIA, COOLARD, KNOCKENAGH SOUTH, CARHOONAKNOCK EAST, COOLKERAGH AND TULLAMORE . THIS APPLICATION IS FOR A 10 TEN YEAR PLANNING PERMISSION. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND WLL BE SUBMITTED WITH THE APPLICATION

LISTOWEL , CO KERRY

1.1km
221340CONDITIONAL21 Dec 2022

MODIFY THE APPROVED GRID CONNECTION FOR THE BALLYDONOHOE SOLAR FARM AS PERMITTED UNDER KERRY COUNTY COUNCIL REFERENCE 21457/AN BORD PLEANÁLA REFERENCE 312288. THE MODIFCATIONS COMPRISE OF (1) THE PROVISION OF A MV CONTROL BUILDING WITHIN THE SOLAR FARM, (2) THE LAYING OF C. 1,747 METRES OF 33KV UNDERGROUND CABLING WITH THE SOLAR FARM SITE, L-1008 AND ADJACENT PUBLIC ROAD TO BE INSTALLED IN AN EXCAVATED TRENCH INCLUDING UNDERGROUND DUCTING, JOINT BAYS, COMMUNICATION CHAMBERS AND ALL ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS, AND (3) MINOR RELOCATION OF POLE SETS AND ASSOCIATED 33KV OVER-HEAD WIRES WITHIN A C. 216 METRES SECTION OF OVERHEAD LINES ON PRIVATE LANDS

COOLARD COOLKERAGH AND GLOURIA , LISTOWEL , CO KERRY

1.1km
2360128CONDITIONAL29 Aug 2023

Retention permission to retain attic conversion

GLOURIA , LISSELTON , CO KERRY

1.1km
23449CONDITIONAL24 Apr 2023

(A) RETAIN A DOMESTIC FUEL STORE, (B) RETAIN AN AGRICULTURAL DRY FEEDS STORE, AND (C) RETAIN A DOMESTIC GARAGE AND WORKSHOP

GLOURIA , LISSELTON , CO KERRY

1.2km
24294CONDITIONAL11 Jul 2024

DEMOLISH (1) DOMESTIC STORE; (2) CONSTRUCTION OF A MACHINERY HOUSE AND ALL ASSOCIATED SITE WORK

BALLYDONOHOE , LISSELTON , CO KERRY

1.2km
2137CONDITIONAL21 Jan 2021

CONSTRUCT A CALF HOUSE, REROOFING OF EXISTING SLATTED HOUSE AND EXTENSION OF SAME AS AN EASY FEED LOOSE HOUSE AND ALL ASSOCIATED SITE WORKS

BALLYDONOHOE , LISSELTON , LISTOWEL

Affected by this application?

Open for submissions
26days left to make a submission

Observations close on Sunday 1 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?