← Back to search

Greenhall Upper , Ballymore Eustace , Co. Kildare

CONDITIONAL

Planning application 171384

Kildare - Kildare County Council

Proposed Development

EXTENSION OF DURATION of planning reg. ref. 13/322; (i) dormer type bungalow, (ii) a detached double garage, (iii) a septic tank and percolation area, (iv) relocate existing farm entrance to the eastern most point of the field, (v) provide a new vehicular entrance, (vi) all ancillary ground works on this site

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Dec 2017

  2. Decision due

    9 Feb 2018

  3. Decision: CONDITIONAL

    9 Feb 2018

Application Details

Location
Greenhall Upper , Ballymore Eustace , Co. Kildare
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Kildare County Council

Timeline

Registration Date
7 December 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 February 2018
Permission Expires
23 November 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

28m
1918CONDITIONAL11 Jan 2019

a change of house type from that previously granted under planning file ref no: 13/322 & 17/1384 from a dormer type house to a single storey type house and revised garage plan and amended garage position on the proposed site

Greenhall Upper , Ballymore Eustace , Co. Kildare

812m
181301REFUSED26 Oct 2018

(a) Construction of a new four bedroom single storey type dwelling. (b) New Oakstown BAF wastewater treatment system and percolation area. Access to the site will be provided through the existing road entrance. Along with all facilitating and associated site development works

Elverstown Great , Ballymore Eustace , Co. Kildare.

822m
18206REFUSED5 Mar 2018

(a) Construction of a new four bedroom single storey type dwelling; (b) New Oakstown BAF wastewater treatment system and percolation area. Access to the site will be provided through the existing road entrance. Along with all facilitating and associated site development works

Elverstown Great , Ballymore Eustace , Co. Kildare.

927m
201032CONDITIONAL9 Sept 2020

1) Build a bungalow style house which incorporates a stepped floor to follow the natural contours of the site. 2) Install a secondary sewage treatment system. 3) Relocate the existing agricultural entrance approximately 10m to the south and upgrade it to a domestic type entrance in compliance with the requirements of The Roads Department, Kildare County Council. 4) All ancillary site works associated with the construction of my proposed new home,

Tipperkevin , Ballymore Eustace , Co. Kildare

975m
19716CONDITIONAL25 Jun 2019

demolition of an existing domestic garage/store and the construction of a new garage/store and all associated site development works at my residence

Tipperkevin , Ballymore Eustace , Naas

993m
2460845CONDITIONAL29 Aug 2024

for 1) A single storey bungalow with split floor levels to take account of my sloping site. 2) A secondary wastewater treatment system with a pressurized infiltration bed for a percolation area. 3) A bored well. 4) A vehicular entrance to the requirements of the roads section of Kildare County Council. 5) All ancillary site works in association with the above

Dowdenstown Little , Ballymore Eustace , Co. Kildare

1.0km
181337CONDITIONAL6 Nov 2018

The construction of a new canopy to cover an existing amphitheatre with associated access improvements to the existing amphitheatre including lighting of pathways and below new canopy structure. The site area is 0.1124 hectares. The canopy structure is 10.5 metres above the FFL to the top of build. The proposed application is within 75 metres of Barretstown House, RPS B24-27 and is also associated with Barretstown Castle, National Monument KD024-029. The site location is towards the central north west of the site curtilage, set within a wooded area,

Barretstown Barretstown Castle , Ballymore Eustace , Co.Kildare Ireland

1.0km
181177N/A26 Sept 2018

the construction of a new canopy to cover an existing amphitheatre with associated access improvements to the existing amphitheatre including lighting of pathways and below new canopy structure. The site area is 0.1124. The canopy structure is 10.5 metres above the FFL to the top of build. The proposed application is within 75 metres of Barretstown House, RPS B24-27 and is also associated with Barretstown Castle, National Monument KD024-029. The site location is towards the central north west of the site curtilage, set within a wooded area at Barretstown,

Barretstown Castle , Ballymore Eustace , Co. Kildare W91 RDX6.

1.0km
181009CONDITIONAL17 Aug 2018

amendments to the previously approved planning permission reference 17/1209, for the construction of a new three storey standalone volunteer’s accommodation lodge. The amendments include: The relocation of the south access stairs to the north and the adjustment of the lift location. The widening of the west fire escape stairs. Changes to elevations, mix of materials and adjustment of eaves detail. The modification of the roof profile. The site area of the development is 3542sqm and gross floor area is 982.94sqm to accommodate 82-88 bed spaces. The building height is 13.22 metres above FFL to the ridge height. The accommodation includes 22 bedrooms with ensuite bathrooms on all three floors, lounge and meeting areas at ground floor level and all related ancillary services and site works, all on an estate of approximately 210 hectares. The proposed development is in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029

Barretstown Castle , Ballymore Eustace , Co. Kildare

1.0km
171209CONDITIONAL27 Oct 2017

the construction of a new three storey stand-alone volunteer’s accommodation lodge with a site area of 3542sqm and gross floor area of 975sqm to accommodate 82-88 bed spaces. Works include the demolition of a 1990’s disused dining hall (633sqm) and renovation works to the existing one storey courtyard buildings of 61sqm. The building height is 13.22 metres above FFL to the ridge height. The accommodation includes 22 bedrooms with ensuite bathrooms on all three floors, lounge and meeting areas at ground floor level and all related ancillary services and site works, all on an estate of approximately 210 hectares. The proposed development is in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029,

Barretstown Castle , Ballymore Eustace , Co. Kildare.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?