Proposed Development
a residential and childcare scheme on a site of 10.2 hectares approximately. The lands are principally bounded by greenfield/agricultural lands to the north and west; the Nurney Road (R415), greenfield/agricultural lands, and a residential dwelling to the east; and residential dwellings, a commercial premises and greenfield/agricultural lands to the south. The proposed development will consist of the provision of 207 No. residential units (including private open space) comprising 6 No. five-bed two storey (with habitable attic accommodation over) houses (including balcony at first floor level) (all semi-detached), 81 No. four-bed two storey houses (80 No. semi-detached and 1 No. detached) and 120 No. three-bed two storey houses (111 No. semi-detached and 9 No. mid-terraces); and a two-storey childcare facility (305.8sqm gross floor area). The proposed development will also consist of: the provision of car parking spaces; vehicular and pedestrian access and egress via the Nurney Road, with associated works to the Nurney Road to include a right-hand turning lane, pedestrian crossing, traffic calming, alterations to existing footpaths and verges, and provision of cycle paths; provision of internal routes for vehicles, cyclists and pedestrians; Sustainable Urban Drainage systems; provision of pumping station including ancillary associated infrastructure; piped services and drainage; renewable energy facilities (solar panels); associated signage; hard and soft landscaping works including lighting and boundary treatments; and infrastructural and site excavation and development works above and below ground. The development also consists of an increase of the site’s existing levels by up to c. 1.9m,
View the full application file on the council's planning portal →Application Details
- Location
- Greyabbey , Nurney Road , Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Floor Area
- 26722.699999999986 sq m
- Residential Units
- 207
Timeline
- Registration Date
- 28 April 2017
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a residential and childcare scheme on a site of 10.2 hectares approximately. The lands are principally bounded by greenfield/agricultural lands to the north and west; the Nurney Road (R415), greenfield/agricultural lands, and a residential dwelling to the east; and residential dwellings, a commercial premises and greenfield/agricultural lands to the south. The proposed development will consist of the provision of 207 No. residential units (including private open space) comprising 6 No. five-bed two storey (with habitable attic accommodation over) houses (including balcony at first floor level) (all semi-detached), 81 No. four-bed two storey houses (80 No. semi-detached and 1 No. detached) and 120 No. three-bed two storey houses (111 No. semi-detached and 9 No. mid-terraced); and a two-storey childcare facility (305.8sqm gross floor area). The proposed development will also consist of: the provision of car parking spaces; vehicular and pedestrian access and egress via the Nurney Road, with associated works to the Nurney Road to include a right-hand turning lane, pedestrian crossing, traffic calming, alterations to existing footpaths and verges, and provision of cycle paths; provision of internal routes for vehicles, cyclists and pedestrians; Sustainable Urban Drainage systems; provision of pumping station including ancillary associated infrastructure; piped services and drainage; renewable energy facilities (solar panels); associated signage; hard and soft landscaping works including lighting and boundary treatments; and infrastructural and site excavation and development works above and below ground. The development also consists of an increase of ground levels at the site by up to c.1.9m. The increase in ground levels will be facilitated through the importation of approximately 100,000m3 of infill material. For the avoidance of doubt, the imported infill material required to alter the ground levels will not be a waste as defined by the Waste Management Act 1996 (as amended)
Greyabbey , Nurney Road , Kildare
Extension of Duration of Planning Ref. No. 17/523 - a residential and childcare scheme on a site of 10.2 hectares approximately. The lands are principally bounded by greenfield/agricultural lands to the north and west; the Nurney Road (R415), greenfield/agricultural lands, and a residential dwelling to the east; and residential dwellings, a commercial premises and greenfield/agricultural lands to the south. The proposed development will consist of the provision of 207 No. residential units (including private open space) comprising 6 No. five-bed two storey (with habitable attic accommodation over) houses (including balcony at first floor level) (all semi-detached), 81 No. four-bed two storey houses (80 No. semi-detached and 1 No. detached) and 120 No. three-bed two storey houses (111 No. semi-detached and 9 No. mid-terraced); and a two-storey childcare facility (305.8sqm gross floor area). The proposed development will also consist of: the provision of car parking spaces; vehicular and pedestrian access and egress via the Nurney Road, with associated works to the Nurney Road to include a right-hand turning lane, pedestrian crossing, traffic calming, alterations to existing footpaths and verges, and provision of cycle paths; provision of internal routes for vehicles, cyclists and pedestrians; Sustainable Urban Drainage systems; provision of pumping station including ancillary associated infrastructure; piped services and drainage; renewable energy facilities (solar panels); associated signage; hard and soft landscaping works including lighting and boundary treatments; and infrastructural and site excavation and development works above and below ground. The development also consists of an increase of ground levels at the site by up to c.1.9m. The increase in ground levels will be facilitated through the importation of approximately 100,000m3 of infill material. For the avoidance of doubt, the imported infill material required to alter the ground levels will not be a waste as defined by the Waste Management Act 1996 (as amended)
Greyabbey , Nurney Road , Kildare
Extension of duration 07/1211. Development consisting of change use and all associated site works for building no's 8.1,8.2,8.3 & 7.5(c) and the omission of building no 8.4 and its replacement with 10 no.residential units which formed part of the neighbourhood centre.
Greyabbey , Kildare Town , Co. Kildare
for the demolition of an existing single-storey house and garage and the provision of twenty homes comprising two no. two-storey terrace blocks of housing containing five no. three-bedroom dwellings in each block; one two-storey terrace block of housing containing four no. three-bedroom dwellings; and a two-storey detached building containing six no. two-bedroom own-door apartments. The application includes modified site access and internal access roads with turning hammerheads, the creation of twenty five parking bays, the provision of passive and active communal open spaces and all water, sewage and stormwater connections to the local networks. Revised by Significant Further Information which consists of: The number of residential units proposed has been reduced from twenty to eighteen. Two storey own-door apartment block type ‘A’ containing six no. two bed apartments is replaced with new terrace block 4 containing two no. three bed houses and two no. two bed houses. Terrace blocks 1 & 2 each now have four no. three bed houses and one no. two bed house. This mix replaces the former mix of five no. three bed houses in each block. Engineering design for the foul, surface water and water infrastructure has been updated. A new connection into the existing foul sewer on the Grey Abbey Road is now proposed. Amendments to the site layout have also resulted in updated car and bicycle parking provisions. The design for the access at the site frontage and the frontage to the north of the site has been updated to include for a priority junction and continuation of the existing cycle track and footpath along the Grey Abbey Road. This will tie into the existing cycle track and footpath further north at Grey Abbey View. Revised by Significant Further Information which consists of the following (with these amendments carried out in response to a Clarification of Further Information request): (a) Terrace block type 4 has been amended as follows: o Previously proposed 2 no. 2 bed mid-terrace house type ‘B1’ has been replaced with 2 no. 2 bed mid-terrace house type ‘D1’ to eliminate any overlooking from habitable rooms to the rear at first floor level. o Previously proposed 1 no. 3 bed end-terrace house type ‘C1’ has been replaced with 1 no. 3 bed end-terrace house type ‘A1’. o The total no. of units in terrace block type 4 is still 4 and has the same mix (2 no. 2 beds and 2 no. 3 beds with house types as follows: 1 no. house type ‘A1’, 1 no. house type ‘C1’, a
The former Guilfoyle’s Garden Centre site , Grey Abbey Road , Kildare Town Co. Kildare
The construction of a proposed single storey extension including new family flat to rear / side of existing dwelling, alterations to existing dwelling layout and all ancillary site works
Tully West , Kildare , R51 D728
For 1. Sub-division of existing site 2. Construction of 2no. dormer type semi-detached dwellings with associated landscaping, lighting and boundary construction 3. Construction of new recessed shared vehicular entrance 4. Connection to existing services and 5. All ancillary works
Tully West , Kildare , Co. Kildare
2 No. dormer dwellings, 2No domestic garages, 2 No. waste water treatment systems and polishing filters, new access road and entrance details, to both dwellings, and all other associated site development works, also demolition of existing bungalow on same site
Drominagh , Tullywest , Kildare
a change of use to part of the retail unit to an ancillary off-licence at ground floor level measuring c. 25.2 sqm within the approved convenience retail unit including all associated site works and services. Development was previously permitted under the parent application Reg. Ref. 04/2974 (extended by Reg. Ref. 16/1360 and amended by Reg. Ref. 22/659)
Centra Emo Station , Greyabbey , Kildare Co. Kildare
the erection of a new one and a half storey dwelling house, new waste water treatment system and percolation area, and widening of existing entrance to the road, together with all associated site works
Tullywest , Kildare , Co.Kildare
single storey extension to rear of existing two-storey dwelling and all associated site works
Tullywest , Kildare , Co. Kildare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?