← Back to search

Chapel Avenue , in the Townland of Oberstown & Sallins , Co. Kildare

N/A

Planning application 17575

Kildare - Kildare County Council

Proposed Development

the demolition of the existing parochial house and outbuildings and the construction of a new 41sqm single storey building, comprising boiler room, store and toilets in grounds of Church of our Lady and the Guardian Angel - Protected Structure

View the full application file on the council's planning portal →

Application Details

Location
Chapel Avenue , in the Townland of Oberstown & Sallins , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
19 May 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

11m
17676CONDITIONAL9 Jun 2017

demolition of the existing parochial house and outbuildings and the construction of a new 41 sq.m single storey building, comprising boiler room, store and toilets in grounds of Church of Our Lady and the Guardian Angel - Protected Structure,

Chapel Avenue , Townland of Osberstown and Sallins , Co. Kildare

13m
17520N/A9 May 2017

the demolition of the existing parochial house and outbuildings and the construction of a new 41 sqm single storey building, comprising boiler room, store and toilets in grounds of Church of our Lady and the Guardian Angel - Protected Structure

Chapel Avenue , in the Townland of Oberstown & Sallins , Co. Kildare

63m
19310CONDITIONAL25 Mar 2019

(A) the removal of the existing onsite signage, (B) change of use of ground floor from coffee shop and delicatessen to takeaway with kitchen area and staff toilet + staff rest area, (C) change of use of existing restaurant to 2 no. one bedroom apartments with first floor roof gardens and all associated site works

Main Street , Sallins , Co.Kildare

65m
22821N/A7 Jul 2022

of the refurbishment and extensions (two single storey flat roofed extensions with roof windows) of the original pair of semi-detached two storey pitched roofed stable buildings off the internal courtyard. The development for permission will consist of the use of the refurbished and extended stable buildings as 2 No. part two storey pitched roofed and part single storey flat roofed one bedroomed houses

Canal View and Main Street , Sallins , Co. Kildare.

68m
21310REFUSED12 Mar 2021

the refurbishment and extension (two single storey flat roofed extensions with roof windows) of the original two storey pitched roofed stable building off the internal courtyard. The development for permission will consist of the use of the refurbished and extended stable building as 2No. part two storey pitched roofed and part single storey flat roofed one bedroomed houses

Canal View and Main Street , Sallins , Co. Kildare.

71m
221151CONDITIONAL22 Sept 2022

The development for retention permission consists of the refurbishment and extensions (two single storey flat roofed extensions with roof windows) of the original pair of semi-detached two storey pitched roofed stable buildings off the internal courtyard. The development for permission will consist of the use of the refurbished and extended stable buildings as 2 No. part two storey pitched roofed and part single storey flat roofed one bedroomed houses

Canal View and Main Street , Sallins , Co. Kildare.

82m
18807N/A5 Jul 2018

(1) Removal of existing two storey extension and return to the rear and formation of extensions to the rear and side of the existing house providing 68sqm additional floor space at ground floor and 47sqm at first floor level with formation of openings at ground and first floor level and alterations to the existing structure to connect to the new extensions. (2) Removal of existing stairs to the central hallway and formation of new landing balustrade. (3) Strip out of existing bathrooms and kitchen. (4) Provision of one new roof light to the existing main roof. (5) Refurbishment of the existing glazing with provision of slim pane double glazing in the existing sash windows. (6) Installation of vapour permeable insulation to the existing external walls. (7) Replacement of the existing ground level concrete floor slab with a new insulated floor. (8) Installation of a heating system, general repairs and refurbishment of the existing building fabric. (9) Replacement of the existing boundary wall to the rear and east in the immediate vicinity of the house adjacent to the adjoining National School with a new 2.6m (measured from adjoining ground level) high masonry boundary wall and a 2.4m high timber panel fence on the rear southern boundary, in addition the western boundary is to be reformed with a new 2m high timber panel fence. (10) Relocation of the existing driveway and provision of new soft and hard landscaped areas around the existing house and proposed extensions. (11) Connection of the foul drainage system into the main public sewer to the front at this Protected Structure,

Ard Na Gréine , Canal View , Sallins

86m
211288N/A9 Sept 2021

Bicycle Hire/Repair, Reception and Retail on the ground floor. Studio apartment upstairs for short-term tourist letting. Signage above the door with brass light-fittings. Signage to the left and right of the new door. Retention of the new front door

3 Grand Canal Stores , Sallins , Co. Kildare.

86m
211192N/A17 Aug 2021

Bicycle Hire/Repair, Reception and Retail on the ground floor. Studio apartment upstairs for short-term tourist letting. Signage above the door with brass light-fittings. Signage to the left and right of the new door. Retention of the new front door

3 Grand Canal Stores , Sallins , Co. Kildare.

88m
211777CONDITIONAL17 Dec 2021

change of use of the ground and first floor areas to uses associated with tourism including on the ground floor for the retail, hire and repair of bicycles and, on the first floor for short-term letting as tourist accommodation. The development will also include changes to the front elevation including identification signage, doors, screens, panels, windows etc.

Unit 3 Canal View , Sallins , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?