Abbey Bridge , Naas , Co. Kildare
CONDITIONALPlanning application 181157
Kildare - Kildare County Council
Proposed Development
Renovating and extending an existing derelict house to form a dormer bungalow, and all associated ancillary site-works
View the full application file on the council's planning portal →Application Timeline
Application received
20 Sept 2018
Further information requested
14 Nov 2018
Further information received
22 Nov 2018
Decision: CONDITIONAL
10 Dec 2018
Decision due
19 Dec 2018
Grant issued
28 Jan 2019
Application Details
- Location
- Abbey Bridge , Naas , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.14 ha
- Floor Area
- 91.5 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 20 September 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 December 2018
- Grant Date
- 28 January 2019
- Permission Expires
- 27 January 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
extension and alterations to the existing house and out buildings and change of use of the existing out buildings to domestic use. The works would involve the construction of a corridor to link the existing house and out building also alterations to the layout of both the house and out buildings to provide new bedroom and living accommodation, all at side and rear at ground floor level, along with all associated site development and facilitating works
3 Abbeybridge , Naas , Co. Kildare.
(1) the phased demolition of existing school buildings (2) the phased construction of a new two and three storey school building with a total gross internal floor area of 10,870m2 incorporating 37no. general classrooms, a series of 20no. support and specialist classrooms, a special needs unit, a library, PE hall, staff rooms and all ancillary accommodation including photovoltaic panels at roof level and separate external storage sheds (50m2) and refuse sore (15m2), (2) to allow the school to remain operational during the construction period, the erection on site of new temporary school accommodation units along with the retention and relocation of the existing units and, on completion of construction works, the decommissioning and removal of all temporary school classrooms, (4) the erection, also on a temporary basis during the school construction period, of an airdome (1,050m2) on the proposed school ball courts, to be used for indoor sports use, (5) the school grounds will comprise the retained existing all weather pitch, 6no. ball courts, outdoor seating and breakout areas, sensory gardens, a covered construction store area, hard and soft landscaping throughout with footpaths, public lighting, landscaping and all associated boundary treatments. (6) the existing site access from Sallins Road is to be maintained, while parking and internal movement arrangements are to include modifications to the car and bus drop-off areas, 92no. car parking spaces, inclusive of 5no. disabled spaces and 2no. electric vehicle charge points, 40no. double stacked non sheltered bicycle stands and 85no. sheltered bicycle stands, together providing in total 330no. cycle parking spaces. (7) the proposal also includes new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, a new substation (28m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds and all other associated site and development works
St. Mary's College , Sallins Road , Naas Co. Kildare.
a protected structure, the demolition of the existing non-original single-storey garage extension to the side, the removal of the non-original rear wall and projecting bay of the central living space, the refurbishment of the non-original living space and former outbuilding, the removal of a non-original toilet and staircase from the former outbuilding and extension of the existing first floor to same, the removal of two non-original rooflights in the roof of the former outbuilding, the removal of a small section of rear wall of said former outbuilding and the insertion of a new arched window opening above at first floor level, and the construction of the following: a new 42m² single-storey rear extension containing extended living area, circulation and a new side entrance; a new attached 145m² two storey extension (76m² ground floor 69m² first floor) containing additional living, bedroom, stairs and associated facilities including a link to the upper level of the former outbuilding, a new rooflight in the former outbuilding, a new rooflight to the living/ dining area, general conservation and associated ancillary site works to include relocating the nonoriginal stone piers to the side garden,
The Old Gasworks , Canal Bank , Naas
the demolition of an existing single storey derelict prefabricated classroom block containing four classrooms and ancillary accommodation, the demolition of the existing link corridor between the existing derelict prefabricated building and the existing school, the installation of a new temporary single storey replacement prefabricated classroom building containing three general classrooms, an entrance lobby, toilets and ancillary accommodation, a new single storey canopy between the new prefabricated building and the existing school together with all associated site works, to be located to the south east of the existing main school building
St. Mary's College , Sallins Road , Naas
development at a Protected Structure, will consist of the demolition of the existing non-original single-storey garage extension to the side, the removal of the non-original rear wall and projecting bay of the central living space, the removal of a non-original wall between existing utility and ensuite, the removal of a non-original chimney, the refurbishment of the non-original living space and former outbuilding, the removal of a non-original toilet and staircase from the former outbuilding and extension of the existing first floor to same, the removal of two non-original rooflights in the roof of the former outbuilding, the removal of a small section of rear wall of said former outbuilding and the insertion of a new arched window opening above at first floor level, the removal of a small section of garden wall, and the construction of the following: a new 36.2m² single-storey rear extension containing a new master bedroom and wardrobe area; a new 96.8m² single storey side and rear extension containing a new side entrance, wc, utility room, sitting room, and an extended living area and circulation space; a new rooflight in the former outbuilding, a new rooflight to the living/dining area, general conservation and associated ancillary site works to include re-locating the non-original stone piers to the side garden
The Old Gasworks , Canal Bank , Naas
for an ESB substation (50 sq. m.) opening onto the proposed road under the previously permitted application (Ref 22/221502 & 23/942). The substation will also include two switch rooms at the rear of the block
Within the townland of Naas West , ‘Finlay Park’ , Naas
for an ESB substation (50 sq. m.) opening onto the proposed road under the previously permitted application (Ref 22/221502 & 23/942). The substation will also include two switch rooms at the rear of the block
Within the townland of Naas West ‘Finlay Park’ , Naas , Co. Kildare
The development will consist of : -Minor alterations and renovations to the dwelling at The Old Gasworks, Naas, a Protected Structure Ref. No. NS19-107; NIAH reg. No. 11814131; -The replacement of the existing heating and electrical systems; -The insulation of roof spaces, floors and the inner face of external walls using breathable materials compatible with the nature and characteristics of the building fabric; -The alteration of some of the existing modern door and window openings which are not original; -The replacement of all of the existing modern double- glazed windows with traditional double-glazed side hung casement windows in timber; - The replacement of all of the existing modern external doors with traditional doors in timber; -The refurbishment of the existing rooms, including the removal of the modern chimney shack in the living area; -Alterations to the layout of some of the rooms; -Site works associated with the proposed development
The Old Gas Works , Canal Bank , Naas
the installation of 3 no. single storey temporary classrooms, to the south of the existing 2 storey 22 classroom temporary primary school on the site (KCC Reg. Ref. 13/50052). To include pedestrian access rampways, utility connections and associated hard and soft landscaping. Gross internal floor area of the temporary classrooms to be 112 sqm at the existing National School site at the rear of the Parish Church of Our Lady & St. David,
Sallins Road , Naas , Co. Kildare
For minor alterations and renovations to the dwelling, a protected structure ref. No. NS19-107; NIAHeg. No. 11814131; the replacement of the existing heating and electrical systems; the insulation of roof spaces, floors and the inner face of external walls using breathable materials compatible with the nature and characteristics of the building fabric; the alteration of some of the existing modern door and window openings which are not original; the replacement of all of the existing modern double-glazed windows with traditional double-glazed side hung casement windows in timber; the replacement of all of the existing modern external doors with traditional doors in timber; the refurbishment of the existing rooms, including the removal of the modern chimney stack in the living area; alterations to the layout of some of the rooms; site works associated with the proposed development
The Old Gas Works , Canal Bank , Naas
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?