Circle Service Station , Northbound Carrigeway of the N7 , Kill West Kill
N/APlanning application 181286
Kildare - Kildare County Council
Proposed Development
(1) Retention of 1 no. car wash plant room. (2) the construction of 1 no. car wash and (3) all associated structures, drainage and site development works
View the full application file on the council's planning portal →Application Details
- Location
- Circle Service Station , Northbound Carrigeway of the N7 , Kill West Kill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 1.24 ha
Timeline
- Registration Date
- 23 October 2018
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for 3no illuminated signage affixed to the existing retail building’s south-western elevation and 1no illuminated freestanding signage adjacent the existing forecourt area and all associated site development works
Circle K Service Station , Northbound carriageway of the N7 , Kill North Kill
(i) car wash, (ii) car wash plant room, and (iii) all associated structures, drainage and site development works
Circle K Service Station , Northbound carriageway of the N7 , Kill West Kill
(i) Single storey extension to rear of service station amenity building to accommodate new customer toilets, storage and staff area, (ii) Associated internal alterations, (iii) Revised storage compounds, (iv) Associated revisions to site layout and drainage, and (v) All associated site and development works. Revised by significant further information consisting of; (i) Single storey extension to rear of service station amenity building to accommodate new customer toilets, storage and staff area, (ii) Associated internal alterations including revised retail area (100 sq.m. max), increased seating area, relocated ATM and minor revisions to deli, back of house area, accessible WC, (iii) Revised storage compounds, (iv) Associated revisions to site layout and drainage, and (v) All associated site development works
Circle K Service Station , Northbound carriageway of the N7 , Kill West Kill
sought for modifications to the permission granted under application register reference 19/1116 comprising the following: (i) An increase of 69.1 sqm in the single storey extension permitted to rear of service station amenity building to accommodate revised floor layout incorporating a decreased net retail floor area of 97 sqm, a new food offer, and revised seating, circulation, customer toilets, storage, and staff areas, resulting in an overall extension of 242.8 sqm to the existing station building. (ii) Revisions to permitted external storage compounds. (iii) Associated revisions to the permitted site layout incorporating 17 No. new car parking spaces, 4 No. HCV parking spaces, 18 No. covered bicycle parking spaces, and the relocation of existing car wash plant room. (iv) Elevational changes to permitted building including relocation of signage and new entrance doors. (v) All associated drainage works, boundary treatments and all other site development works
Circle K Service Station , Northbound carriageway of the N7 , Kill North
A high power electric vehicle charging station consisting of 1. Installation of 6 no. electric vehicle charging bays ,each comprising a parking space and electric vehicle charging unit. 2. Associated revisions to existing car parking area. 3. Installation of electric vehicle power units, 4. Construction of a new substation. 5. Erection of illuminated signage. 6. All associated lighting, infrastructure, site and development works.
Circle K Service Station , N7 (Northbound carriageway) , Kill West Kill
modifications to the permission granted under application register reference 22/546. The proposed development comprises the following: (i) A revised internal floor layout incorporating an increase of the net retail floor space by 3 sqm to total 100 sqm; (ii) Relocation of existing off licence, permitted under application register reference 08/656 and increase in its area from 5.3 sqm to 6 sqm; (iii) Minor revisions to the internal food preparation, seating, circulation and back of house areas; (iv) Increase in size of external storage compound to include outdoor freezer room; (v) Associated elevational changes to the permitted building and extension; (vi) The construction of a new external refuse area, 76.7 sqm in size with associated 2100mm high paladin fencing; (vii) All associated drainage works, boundary treatments and all other site development works
Circle K Service Station , Northbound Carriageway of the N7 , Kill North
the demolition of existing single storey forecourt building accommodating a shop and café (246 sqm GFA), removal of external compounds, substation and car wash; and the provision of a temporary structure to accommodate the shop/office (72 sqm GFA) during the construction phase. The proposed development will also consist of the construction of: single storey forecourt building (531 sqm GFA) accommodating a shop (100 sqm net, including a 9.5 sqm ancillary off-licence), 3 No. restaurant/café areas (which will include for the sale of hot and cold food for consumption on and off the premises) (one of which will include a drive-thru facility), associated restaurant/café seating area, ancillary kitchens, staff and customer facilities, plant, storage, back of house and circulation spaces; and a new substation (23 sqm GFA). The proposed development will also consist of: new shopfront signage (some illuminated) (9 sqm), a replacement double sided illuminated totem (18 sqm each side); revisions to the site layout, including the provision of 37 No. car parking space and new waste compound, relocation of the air/water services; changes to levels; alterations to external lighting; hard and soft landscaping, including revised boundary treatments and an external public seating area; associated alterations to the permitted scheme’s services (mechanical and electrical, water supply, sewage disposal and surface water disposal); and all other associated site development works above and below ground. The proposed development will also consist of the retention of a solid fuel store (6.4 sqm GFA).
site of approximately 0.45 hectares at , Maxol N7 Naas Road , Kill Co. Kildare
for amendments to the previously permitted development (Kildare County Council Reg. Ref. 04/2631), at a site of approximately 0.43 hectares. The proposed development will consist of: the part-demolition of the single storey forecourt building (21 sq m) and the removal of external compounds, substation, car wash, storage shed, and totem signs; the construction of a 219 sq m extension to the forecourt building and revised facades resulting in a part-one/part-two storey building of 525 sq m to accommodate a retail unit (100 sq m net retail area, including a 9 sq m ancillary off licence), 3 No. restaurant/cafe areas (which will include the sale of hot and cold food for consumption on and off the premises) (1 No. to include a drive-thru facility), associated seating area, back of house areas, circulation spaces, and a substation/switch room (8 sq m); and the construction of an EV Charging Hub (consisting of 8 No. EV charging spaces, a canopy, ancillary plant, and substation). The development will also consist of revisions to the overall site layout resulting in: 23 No. car parking spaces (in addition to the EV Hub spaces); motorbike and bicycle parking spaces; revised vehicular circulation; relocated water and air services, offset fills and vents; external lighting; provision of an outdoor seating area; changes to levels, hard and soft landscaping, including revised boundary treatments; associated site servicing (water supply, foul and surface water drainage including surface water attenuation measures); all other associated site development works above and below ground. The development will also consist of 24 No. signs: 1 No. replacement 8.2 m high double-sided internally illuminated totem sign; 1 No. 4.8 m high double-sided internally illuminated freestanding sign; 8 No. charge point signs at the EV Hub; 9 No. signs fixed to the forecourt building (3 No. of which are illuminated); 2 No free-standing signs; 3 No. fixed signs. The proposed development also proposes to alter Condition No. 10 of KCC Reg. Ref. 04/2631, “The proposed café/ take – away hours of operation shall be 07.00 to 21.00. Reason: In the interests of the preservation of residential amenities and the proper planning and sustainable development of the area.”, to allow for the operation of the cafe/restaurants (including drive-thru) from 06.30-00.00 Monday to Thursday, and 24 hours Friday to Sunday. The development will also consist of a single storey temporary structure (72 sq m) to accommodat
Maxol Service Station N7 Naas Road , Kill , Co. Kildare
for A: demolishing existing single storey garage, B: constructing a single storey extension to the front, side and rear of existing dwelling, C: constructing a 2 storey extension to the side of existing dwelling, D: alterations to existing elevations and floor plans and associated site works
6 Whitethorn Grove , Kill , Co Kildare
for the alterations to the approved storm water network to serve the development approved under Kildare County Council Reference Number 23/986 including the construction of a new outfall discharge route to the adjoining Kill River and all associated site development works. Revised by Significant Further Information which consists of amendments to the storm water network design and inclusion of additional professional reports
Marsville House , Main St , Kill
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.