← Back to search

Goffs Bloodstock Sales , Greenhills , Kill

N/A

Planning application 18133

Kildare - Kildare County Council

Proposed Development

3 no. new stable blocks & tack rooms, new rain water harvesting system, landscaping and all ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
Goffs Bloodstock Sales , Greenhills , Kill
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
9 February 2018
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

113m
18212CONDITIONAL5 Mar 2018

3 No. new stable blocks, consisting of 96 No. stables, tack rooms and feed stores, also new rain water harvesting system, new dung heap area with associated run-off storage tank, new boundary fencing, landscaping and all ancillary site works including re-directing existing land drain

Goffs Bloodstock Sales , Greenhills , Kill

363m
19967REFUSED27 Aug 2019

(a) construction/erection of 11 residential units comprising 2 no. two storey 117.6 sqm three bedroom semi-detached dwelling houses (House Type A1+A4), 6 no. two storey 89.6 sqm two bedroom terraced town houses (House Type C1+C2+C3+C4+C5+C6) and 3 no. two storey 117.6 sqm three bedroom terraced town houses (House Type A1+A2+A3), (b) all associated site development works to include car parking, bin stores, bicycle stores, boundary walls and associated fencing, (c) modifications to existing site entrance to include new access road, boundary wall and footpath, (d) all site development works including new footpath along site frontage with connections to existing foul sewer, surface water, water main and all services. The granting of planning permission for the demolition of the existing single storey house on site was granted on planning permission register reference 18/727.

Four Seasons , Greenhills , Kill

370m
211236CONDITIONAL27 Aug 2021

for a housing development to include: (a) Construction/erection of 9 residential units comprising 6 No. two storey 112sqm three bedroom semi-detached dwelling houses (House Type B1 + B2), and 3 No. two storey three bedroom terraced town houses (House Type A1 + A2 + A3) (Floor Area of A2 is 117.6sqm and A1 and A23 is 118.8sqm); (b) All associated site development works to include car parking, bin store, boundary walls, noise reducing barriers and associated fencing; (c) Modifications to existing site entrance to include new access road, boundary fence and footpath; (d) All site development works including new footpath along site frontage with connections to existing foul sewer, surface water, water main and all services. The Granting of planning permission for the demolition of the existing single storey house on site was granted on planning permission register reference 18/727. All development to take place

Four Seasons , Greenhills , Kill

384m
2560886REFUSED5 Aug 2025

for the construction of a new Padel Centre of excellence which shall include 9 indoor Padel Courts and all associated indoor facilities including refreshment areas, breakout spaces, warm up and warm down areas, changing facilities, reception area at ground floor level. The construction of a mezzanine floor level to include staff welfare facilities, waiting / viewing area, staff offices and storage areas. The development will also include the construction of a new access road, footpaths, and parking facilities to serve the development and for the construction of a new storm water drainage system in compliance with SUDS directives, for connections to the foul and public watermain and for all associated site development works and services on land to the southwest of Goffs,

Southwest of Goffs Greenhill , Kill , Co. Kildare.

387m
2560859N/A29 Jul 2025

for the construction of a new Padel Centre of excellence which shall include 9 indoor Padel Courts and all associated indoor facilities including refreshment areas, breakout spaces, warm up and warm down areas, changing facilities, reception area at ground floor level. The construction of a mezzanine floor level to include staff welfare facilities, waiting / viewing area, staff offices and storage areas. The development will also include the construction of a new access road, footpaths, and parking facilities to serve the development and for the construction of a new storm water drainage system in compliance with SUDS directives, for connections to the foul and public watermain and for all associated site development works and services on land to the southwest of

Southwest of Goffs Greenhill , Kill , Co. Kildare.

393m
18727CONDITIONAL19 Jun 2018

the demolition of the existing single storey dwelling, the construction of 4 no. two storey dwellings, relocating the existing entrance and all associated site works

Four Seasons , Greenhills , Kill

409m
22546CONDITIONAL11 May 2022

sought for modifications to the permission granted under application register reference 19/1116 comprising the following: (i) An increase of 69.1 sqm in the single storey extension permitted to rear of service station amenity building to accommodate revised floor layout incorporating a decreased net retail floor area of 97 sqm, a new food offer, and revised seating, circulation, customer toilets, storage, and staff areas, resulting in an overall extension of 242.8 sqm to the existing station building. (ii) Revisions to permitted external storage compounds. (iii) Associated revisions to the permitted site layout incorporating 17 No. new car parking spaces, 4 No. HCV parking spaces, 18 No. covered bicycle parking spaces, and the relocation of existing car wash plant room. (iv) Elevational changes to permitted building including relocation of signage and new entrance doors. (v) All associated drainage works, boundary treatments and all other site development works

Circle K Service Station , Northbound carriageway of the N7 , Kill North

410m
221513CONDITIONAL20 Dec 2022

modifications to the permission granted under application register reference 22/546. The proposed development comprises the following: (i) A revised internal floor layout incorporating an increase of the net retail floor space by 3 sqm to total 100 sqm; (ii) Relocation of existing off licence, permitted under application register reference 08/656 and increase in its area from 5.3 sqm to 6 sqm; (iii) Minor revisions to the internal food preparation, seating, circulation and back of house areas; (iv) Increase in size of external storage compound to include outdoor freezer room; (v) Associated elevational changes to the permitted building and extension; (vi) The construction of a new external refuse area, 76.7 sqm in size with associated 2100mm high paladin fencing; (vii) All associated drainage works, boundary treatments and all other site development works

Circle K Service Station , Northbound Carriageway of the N7 , Kill North

412m
191116CONDITIONAL9 Oct 2019

(i) Single storey extension to rear of service station amenity building to accommodate new customer toilets, storage and staff area, (ii) Associated internal alterations, (iii) Revised storage compounds, (iv) Associated revisions to site layout and drainage, and (v) All associated site and development works. Revised by significant further information consisting of; (i) Single storey extension to rear of service station amenity building to accommodate new customer toilets, storage and staff area, (ii) Associated internal alterations including revised retail area (100 sq.m. max), increased seating area, relocated ATM and minor revisions to deli, back of house area, accessible WC, (iii) Revised storage compounds, (iv) Associated revisions to site layout and drainage, and (v) All associated site development works

Circle K Service Station , Northbound carriageway of the N7 , Kill West Kill

416m
2460596CONDITIONAL1 Jul 2024

for 3no illuminated signage affixed to the existing retail building’s south-western elevation and 1no illuminated freestanding signage adjacent the existing forecourt area and all associated site development works

Circle K Service Station , Northbound carriageway of the N7 , Kill North Kill

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?