Bishopslane , Ballymore Eustace , Naas
CONDITIONALPlanning application 181561
Kildare - Kildare County Council
Proposed Development
(1) conversion of the existing garage to consist of a living area, two bedrooms and two bathrooms. (2) construction of a new single storey front extension to be incorporated to the garage conversion. (3) internal remodel and upgrade of the existing dwelling to suit the new proposed layouts. (4) installation of a wastewater treatment system, all structural and associated site works to be implemented
View the full application file on the council's planning portal →Application Timeline
Application received
20 Dec 2018
Further information requested
19 Feb 2019
Further information received
10 Apr 2019
Decision due
7 May 2019
Decision: CONDITIONAL
7 May 2019
Grant issued
11 Jun 2019
Application Details
- Location
- Bishopslane , Ballymore Eustace , Naas
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.3 ha
Timeline
- Registration Date
- 20 December 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 May 2019
- Grant Date
- 11 June 2019
- Permission Expires
- 10 June 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
new two-storey, dormer roof house with slate roof and render finished exterior walls, new site entrance driveway, waste water treatment system and ancillary site works
Bishopslane , Ballymore Eustace East , Co. Kildare
for (i) The construction of a new single storey dwelling house with domestic garage (ii) installation of new wastewater treatment system (iii) creation new driveway accessed by new entrance onto existing lane (iv) all ancillary siteworks
Bishopslane , Ballymore Eustace , Co. Kildare
elite badminton training facility comprising (a) 236sqm detached 9m high training court / gym. (b) 125sqm three bedroom self catering accommodation retreat. (c) upgrading of existing agricultural entrance. (d) treatment system and percolation area, and (e) all associated site development and facilitating works
Horsepasstown , Balllymore Eustace , Co. Kildare
for permission is sought for: A) The provision of a new entrance arrangement to service the development. Retention permission is sought for: B) The use of the site as a drive-thru coffee facility, C) The erection of a shipping container for drive-thru coffee facility use, D) The installation of 4 no. advertising feather flags, E) The installation of an advertising trailer, F) The installation of an advertising signage and G) Creation of an outdoor seating area to the western boundary including all associated site and development works, and services
Inver , Horsepasstown , Ballymore Eustace
Permission is sought for A) The provision of a new entrance arrangement to service the development. Retention permission is sought for: B) The use of the site as a drive-thru coffee facility, C) The erection of a shipping container for drive-thru coffee facility use, D) The installation of 4 no. advertising feather flags, E) The installation of an advertising trailer, F) The installation of an advertising signage and G) Creation of an outdoor seating area to the western boundary including all associated site and development works, and services
Inver , Horsepasstown , Ballymore Eustace
for: the second natural grass playing surface (Pitch 2) located to the north of existing main playing pitch c. 10,390sqm, the 4 no. ball stop nets to Pitch 2 located on the northern, southern, eastern and western sides of the pitch, the existing generator plinth adjacent to Pitch 2, the existing pedestrian walking track located around the perimeter of Pitch 1 & 2, the existing 5m high metal clad storage shed, c. 24sqm located to the north of existing spectator stand, the existing 11m wide x 10m high hurling ball wall located to the north of storage shed, the existing 8 no. 10m high floodlights installed around the training pitch, located between Pitch 1 & Pitch 2, the existing 2.2m high storage container, c. 11.52sqm located to the south of the toilet block, the existing scoreboard located to east side of pitch behind the existing dugout and the as installed tennis / basketball courts, associated site fencing located to east of the main entrance. Planning permission is sought for: New pitch (Pitch 1) low energy floodlights consisting of six number lamp standards 20m in height located around the main playing pitch, New pitch (Pitch 2) low energy floodlights consisting of eight number lamp standards 15m in height located around the second playing pitch, The installation of three number proprietary solar power generating car-ports 50.4sqm each to be located to north of tennis courts, The installation of 31sqm solar panel array to south facing roof of existing clubhouse, Ancillary facilities include 10 number bicycle parking stands
Ballymore GAA , Bishopsland , Ballymore Eustace
for: the second natural grass playing surface (Pitch 2) located to the north of existing main playing pitch c. 10,390sqm, the 4 no. ball stop nets to Pitch 2 located on the northern, southern, eastern and western sides of the pitch, the existing generator plinth adjacent to Pitch 2, the existing pedestrian walking track located around the perimeter of Pitch 1 & 2, the existing 5m high metal clad storage shed, c. 24sqm located to the north of existing spectator stand, the existing 11m wide x 10m high hurling ball wall located to the north of storage shed, the existing 8 no. 10m high floodlights installed around the training pitch, located between Pitch 1 & Pitch 2, the existing 2.2m high storage container, c. 11.52sqm located to the south of the toilet block, the existing scoreboard located to east side of pitch behind the existing dugout, the as installed tennis / basketball courts, associated site fencing located to east of the main entrance. Planning permission is sought for: New pitch (Pitch 1) low energy floodlights consisting of six number lamp standards 20m in height located around the main playing pitch, New pitch (Pitch 2) low energy floodlights consisting of eight number lamp standards 15m in height located around the second playing pitch, The installation of three number proprietary solar power generating car-ports 50.4sqm each to be located to north of tennis courts, The installation of 31sqm solar panel array to south facing roof of existing clubhouse, Ancillary facilities include 10 number bicycle parking stands
Ballymore GAA , Bishopsland , Ballymore Eustace
for: Low energy floodlights consisting of six number lamp standards 18m in height located around the main playing pitch. The installation of three number proprietary solar power generating car-ports 50.4sqm each to be located to north of tennis courts. The installation of 31sqm solar panel array to south facing roof of existing clubhouse. 10 No. Bicycle parking spaces and all ancillary site works
Ballymore GAA , Bishopsland , Ballymore Eustace
for: Low energy floodlights consisting of six number lamp standards 20m in height located around the main playing pitch. The installation of three number proprietary solar power generating car-ports 50.4sqm each to be located to north of tennis courts. The installation of 31sqm solar panel array to south facing roof of existing clubhouse. Ancillary facilities include 10 number bicycle parking stands
Ballymore GAA , Bishopsland , Ballymore Eustace
conversion, repair and extension of the former shed and workman's cottage to create 2no. long term rental single storey dwelling units [2no. 2-bed units] within the existing outer western courtyard [to the immediate west of the aviary] that will include some minor modifications to the courtyard wall to facilitate a single car parking space for each unit with vehicular access off the N81 to the south. The development will also include landscaping and other ancillary works within the courtyard to facilitate development
Russborough House , Russborough , Blessington
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?