172 Sallins Bridge , Sallins , Co. Kildare
N/APlanning application 18249
Kildare - Kildare County Council
Proposed Development
new window to the front of the existing house at ground level and replacing circular window at attic level with a rectangular window at the attic level and a new rectangular window at attic level at the rear to the existing house. The existing vehicular entrance at the front of the property to be moved from the side into the centre of the property.
View the full application file on the council's planning portal →Application Timeline
Application received
12 Mar 2018
Further information requested
2 May 2018
Further information received
25 Jun 2018
Application withdrawn
17 Aug 2018
Application Details
- Location
- 172 Sallins Bridge , Sallins , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Floor Area
- 2.5 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 12 March 2018
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 17 August 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a new window to the front of the existing house at ground level and replacing the circular window at attic level with a rectangular window and a new rectangular window at the attic level at the rear of the existing house. The existing vehicular entrance at the front of the property to be moved from the side into the centre of the property
172 Sallins Bridge , Co. Kildare
permission for a first floor window to the front elevation to replace the existing circular window and a new rooflight to the East side elevation. The application also includes the retention of an existing first-floor window to the rear elevation and the retention of 5 no. existing rooflights on the West side elevation roof slope & 1 no. existing rooflight on the East side elevation roof slope
172 Sallins Bridge , Sallins , Co. Kildare
for a single storey domestic garage and all associated site works
Villa Rosa , Clane Road , Sallins
change of use of unit to front of mixed-use building, where front of building is currently a commercial unit (Formerly Rene Hair Studio) and rear adjoining part of building is residential. It is proposed to return the commercial unit to the front of building into residential, to be incorporated into existing residential dwelling to rear of building. Also, with addition of boundary wall to front of property with 1no vehicular access gates and 1no pedestrian access gate, and all ancillary site works
Villa Rosa , Clane Road , Sallins Co. Kildare.
construction of a two storey four bedroom house, with study, integrated garage, new gated road access, new garden wall to front boundary, landscaping, and all associated site and drainage works
Clane Road , Sallins , Co. Kildare.
(a) Modifications to existing dwelling house to include (i) Replacing existing front elevation first floor port hole window with new enlarged rectangular window; (ii) New first floor window to rear elevation; (iii) Minor internal modifications and all associated development works. (b) Modifications to existing domestic shed to include (i) Extending building to provide for home office and games room with w/c; (ii) New window and door arrangement to front and side elevations; (iii) Connection to existing on-site services and all associated development works
173 Sallins Bridge , Sallins , Naas
the construction of a two storey four bedroom house, with integrated garage, 3 No. roof lights, new gated road access, and all associated site, landscaping, and drainage works
Clane Road , Sallins , Co. Kildare.
a single storey detached home studio/recreational space ancillary to applicant’s house, and all ancillary site works
165 Sallins Bridge , Sallins , Co. Kildare.
retaining a single storey detached home studio / recreational space ancillary to adjacent house, and all ancillary site-works
165 Sallins Bridge , Sallins , Co. Kildare
retaining a single storey detached home studio / recreational space ancillary to applicants house and all ancillary site works.
165 Sallins Bridge , Sallins , Co. Kildare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?