Downings North , Prosperous , Co. Kildare
CONDITIONALPlanning application 18832
Kildare - Kildare County Council
Proposed Development
a single storey dwelling, detached shed, on site effluent treatment system and percolation are, surface water to soak-aways, recessed vehicular entrance and all associated site works
Application Timeline
Application received
11 Jul 2018
Decision due
4 Sept 2018
Decision: CONDITIONAL
4 Sept 2018
Grant issued
20 Nov 2018
Application Details
- Location
- Downings North , Prosperous , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.239 ha
- Floor Area
- 179 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 11 July 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 September 2018
- Grant Date
- 20 November 2018
- Permission Expires
- 19 November 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
change of house type on previously approved application 18/832 to a single storey bungalow, domestic shed, recessed entrance, septic tank and percolation area and all associated site works
Downings North , Prosperous , Co. Kildare.
change of house type on previously approved application 18/832 to a single storey bungalow, domestic shed, recessed entrance, septic tank and percolation area, recessed entrance and all associated site works,
Downings North , Prosperous , Co. Kildare
for bungalow type dwelling, detached domestic garage, proprietary effluent treatment system, recessed vehicular entrance, to be accessed off an existing recessed vehicular entrance-/egress point & access avenue, and all associated ancillary site-works. Revised by Significant Further Information which consists of: Amending the red line site boundary and the locations for proposed bungalow, garage, effluent treatment system, & vehicular entrance
Downings North , Prosperous , Co. Kildare
construction of a bungalow type dwelling, detached domestic garage, proprietary effluent treatment system, recessed vehicular entrance, and all associated ancillary site-works
Downings North , Prosperous , Co. Kildare.
planning permission to reconstruct and remodel existing derelict house including separation of unit from existing adjoining neighbouring property together with all associated site works. Retention permission is sought for the following: 1. Temporary siting of existing Mobile dwelling house for a period of 5 years 2. Existing waste water treatment system, stormwater soakaways and all associated site works. 3. Widening of existing northern vehicular entrance. 4. Resurfacing of entire site with broken stone made from recycled building waste together with all associated site works. 5. Temporary siting of existing Shed to the front of the existing derelict dwelling. 6. Existing boundary fencing as constructed
Downings South , Prosperous , Co. Kildare
The erection of a new milking parlour with a dairy and plant rooms, a roofed handling area, a cubicle shed and, a meal bin and improvements to existing entrance
Millgrove , Prosperous , Naas
Retention Permission and Full Planning Permission for the following; (A) Retention Permission for recessed entrance walls and piers as constructed. (B) New bungalow effluent treatment plant and percolation area, screen planting and all associated site development works
Downings North , Prosperous , Naas
a proposed bungalow, a detached garage, a new wastewater treatment system and percolation area, a new entrance, and all ancillary site works,
Downings North , Prosperous , Co. Kildare
a proposed bungalow, a detached garage, a new wastewater treatment system and percolation area, a new entrance and all ancillary site works
Downings North , Prosperous , Co.Kildare.
proposed bungalow, a detached garage, a new wastewater treatment system and percolation area, a new entrance, and all ancillary site works
Downings North , Prosperous , Co. Kildare.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?