Proposed Development
solar farm to be installed over restored landfill with an export capacity of approximately 3MW comprising photovoltaic panels on ground mounted frames, connection to existing single-storey ESB Sub-Station/switch room building, installation of 3 No. transformers, ducting and underground electrical cabling and all associated ancillary works and services at KTK landfill
View the full application file on the council's planning portal →Application Details
- Location
- Brownstown , Kilcullen , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
Timeline
- Registration Date
- 24 July 2018
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for a solar farm to be installed over restored landfill with an export capacity of approximately 4.5MW comprising photovoltaic panels on concrete ballast supported frames, construction of and connection to a new single-storey ESB Sub-Station / Switch Room building, installation of 3 No. transformers, ducting & electrical cabling and all associated ancillary works and services
Brownstown , Kilcullen , Co Kildare.
A solar farm to be installed over restored landfill with an export capacity of approximately 3MW comprising photovoltaic panels on ground mounted frames, connection to existing single-storey ESB Sub- Station / switch room building, installation of 3 No. transformers, ducting and underground electrical cabling and all associated ancillary works and services. Revised by significant further information consisting of; construction management plan detailing construction techniques
Brownstown and Carnalaway , Kilcullen , Co. Kildare
a planning application area of c.20.6 ha. consisting of a combined proposed extraction area (Area 1, c.10.3 ha) and proposed early reinstatement area (Area 2, c.10.3 ha). Area 1 will consist of an extension to the west of the existing sand and gravel pit with an extraction footprint of c.8.7 ha. The sand and gravel extraction (c.2.4m tonnes) will be dry working above the water table. Stripping and storage of topsoil and overburden materials from the extension lands for reuse in the restoration works. Restoration of the extraction area will be to a beneficial agricultural after-use and form part of the restoration of the extraction area, as permitted under planning ref. 17/1224 (ABP-302199-18). Area 2 will consist of an amendment to the permitted extraction area of planning ref 17/1224 (ABP-302199-18) by the omission of a c.4.7 hectare area and the early reinstatement of a partially extracted c.2.7 hectare area of the existing permitted c.7.4 hectares extraction area. It is proposed that he duration of the proposed development would run concurrent with that of planning ref. 17/1224 (ABP-302199-18) which is due to expire on 17/02/2039. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application
Corbally & Brownstown Townlands , Kilcullen , Co. Kildare
a planning application area of c. 20.6 hectares consisting of a combined proposed extraction area (Area 1, c. 10.3 hectares) and proposed early reinstatement area (Area 2, c. 10.3 hectares). Area 1 will consist of an extension to the west of the existing sand and gravel pit with an extraction footprint of c. 8.7 hectares. The sand and gravel extraction (c. 2.4m tonnes) will be dry working above the water table. Stripping and storage of topsoil and overburden materials from the extension lands for reuse in the restoration works. Restoration of the extraction area will be to a beneficial agricultural after-use and form part of the restoration of the extraction area, as permitted under planning ref. 17/1224 (ABP-302199-18). Area 2 will consist of an amendment to the permitted extraction area of planning ref. 17/1224 (ABP-302199-18) by the omission of a c. 4.7 hectare area and the early reinstatement of a partially extracted c. 2.7 hectare area of the existing permitted c. 7.4 hectares extraction area. It is proposed that the duration of the proposed development would run concurrent with that of planning ref. 17/1224 (ABP-302199-18), which is due to expire on 17/02/2039. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application
Corbally and Brownstown townlands , Kilcullen , Co. Kildare
demolition of existing shed and construction of a replacement agricultural style barn and all associated site works
Silliothill , Kilcullen , Co. Kildare.
Alterations to previously granted applications PL 19/1085, ( currently under construction) alterations include the relocation of the front door, reduction of floor area, external alterations to window size and locations and all associated site works
Carnalway , Kilcullen , Co. Kildare.
alterations to previously granted application PL 19/1085, (single storey extension to existing dormer style dwelling currently under construction) alterations include the relocation of the front door, reduction of floor area, external alterations to window sizes and locations and all associated site works
Carnalway , Kilcullen , Co. Kildare.
a single storey extension to side and rear of existing dormer style dwelling, internal renovations and alterations, use of existing onsite services and all ancillary site works
Carnalway , Kilcullen , Co. Kildare.
of as built alterations to previously granted Planning Permission 00/24 comprising alterations to elevations/windows types, revised roof design, addition of roof windows and alteration to internal layout, single storey garage along with associated site development and facilitating works.
The Orchard , Carnalway , Kilcullen
Extension of Duration of Planning Ref. 07/707 -continuance for period of 10 years of(1)extraction of sand and gravel and processing on 89.5ha with control cabin and canteen facilities, electricity substation, bunded fuel tanks, ESB substation and Switch-house and septic tank etc
Brownstown Corbally , and Silliothill , Kilcullen
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.